i
BSCPL Infrastructure
Filter interviews by
I appeared for an interview before Feb 2016.
Indirect expenses are costs that cannot be directly attributed to a specific product or service.
Indirect expenses are also known as overhead costs.
Examples of indirect expenses include rent, utilities, and office supplies.
These expenses are necessary for the operation of a business but are not directly tied to the production of goods or services.
Indirect expenses are typically allocated to products or services based on...
Top trending discussions
posted on 23 Jan 2017
I appeared for an interview in Aug 2016.
posted on 15 May 2022
posted on 3 Dec 2022
I applied via Campus Placement
posted on 10 Nov 2024
I applied via Campus Placement and was interviewed before Nov 2023. There were 2 interview rounds.
Calculate weight of steel plate based on given dimensions
Calculate the volume of the steel plate using the given dimensions
Use the density of steel (usually around 7850 kg/m^3) to calculate the weight
Weight = Volume x Density
30 minutes, Aptitude and Technical
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.
I appeared for an interview in Sep 2016.
based on 7 reviews
Rating in categories
Junior Engineer Civil
79
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Junior Engineer
64
salaries
| ₹2.2 L/yr - ₹4.1 L/yr |
Assistant Engineer
46
salaries
| ₹3 L/yr - ₹6 L/yr |
Graduate Engineer Trainee (Get)
42
salaries
| ₹1.5 L/yr - ₹4.1 L/yr |
Technical Assistant
39
salaries
| ₹1.4 L/yr - ₹2.5 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem