Add office photos
Employer?
Claim Account for FREE

Brij Gopal Construction Company

3.9
based on 153 Reviews
Filter interviews by

10+ M B Chitale Constructions Interview Questions and Answers

Updated 30 Jun 2024

Q1. what is full form of RJ45?

Ans.

RJ45 stands for Registered Jack 45, a type of connector used for Ethernet networking.

  • RJ45 is a type of connector used for Ethernet networking.

  • It has 8 pins and is used to connect devices to a network.

  • RJ45 is commonly used in homes, offices, and data centers.

  • Examples of devices that use RJ45 connectors include computers, routers, and switches.

View 3 more answers

Q2. what is GSB WMM DBM BC

Ans.

GSB, WMM, DBM, BC are different types of materials used in road construction.

  • GSB stands for Granular Sub Base and is the lowest layer of the road construction.

  • WMM stands for Wet Mix Macadam and is used as a base layer for the road.

  • DBM stands for Dense Bituminous Macadam and is used as a binder course layer.

  • BC stands for Bituminous Concrete and is the topmost layer of the road.

  • The selection of these materials depends on factors like traffic volume, climate, and soil type.

Add your answer

Q3. Different between QA/QC and Specific Gravity and Density

Ans.

QA/QC is a process of ensuring quality of a product or service, while specific gravity and density are physical properties of a substance.

  • QA/QC involves testing and inspection to ensure quality standards are met

  • Specific gravity is the ratio of a substance's density to the density of a reference substance

  • Density is the mass per unit volume of a substance

  • QA/QC is a process, while specific gravity and density are properties

  • QA/QC can be applied to any product or service, while sp...read more

Add your answer

Q4. What is the strength of 1st class brick??

Ans.

The strength of 1st class brick is its high compressive strength and durability.

  • 1st class bricks have a minimum crushing strength of 105 kg/cm2.

  • They are made of high-quality clay which is fired at high temperatures to increase strength.

  • These bricks are used in load-bearing structures like walls and foundations.

  • 1st class bricks are durable and resistant to weathering and erosion.

View 1 answer
Discover M B Chitale Constructions interview dos and don'ts from real experiences

Q5. How to start any project ?

Ans.

Starting a project involves defining goals, creating a plan, assembling a team, and securing resources.

  • Define project goals and objectives

  • Create a project plan with timelines and milestones

  • Assemble a team with the necessary skills and expertise

  • Secure resources such as funding, equipment, and materials

  • Establish communication channels and protocols

  • Identify potential risks and develop contingency plans

  • Monitor progress and adjust plans as necessary

Add your answer

Q6. What is the QAM & QAP

Ans.

QAM stands for Quality Assurance Manual and QAP stands for Quality Assurance Plan.

  • QAM is a document that outlines the quality policies and procedures of an organization.

  • QAP is a document that outlines the specific quality control activities that will be performed on a project.

  • QAM is a high-level document that provides an overview of the organization's quality management system.

  • QAP is a more detailed document that outlines the specific quality control activities that will be p...read more

Add your answer
Are these interview questions helpful?

Q7. what is dhcp server?

Ans.

DHCP server assigns IP addresses to devices on a network automatically.

  • DHCP stands for Dynamic Host Configuration Protocol.

  • It eliminates the need for manual IP address configuration.

  • DHCP server assigns IP addresses, subnet masks, default gateways, and DNS servers to devices.

  • DHCP lease time determines how long a device can use an assigned IP address.

  • DHCP server can be configured on a router, server, or dedicated appliance.

View 1 answer

Q8. What is documentation

Ans.

Documentation is the process of recording information in a systematic and organized manner.

  • It involves creating, storing, and retrieving documents.

  • Documentation can be in the form of written, electronic, or visual records.

  • Examples of documentation include contracts, reports, manuals, and policies.

  • Documentation is important for legal, regulatory, and organizational purposes.

  • It helps in maintaining consistency, accuracy, and transparency in information.

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. What is your expected CTC.

Ans.

My expected CTC is in line with industry standards and commensurate with my experience and skills.

  • I have researched the market and have a good understanding of the salary range for this position.

  • I am open to negotiation based on the overall compensation package offered.

  • My previous salary was in the range of X to Y, and I am looking for a similar or higher package.

  • I am also interested in other benefits such as health insurance, retirement plans, and paid time off.

Add your answer

Q10. Capacity... 28,24,18 MLD, SIZE OF CLF.. 19m dia

Ans.

The capacity of the CLF is 28, 24, and 18 MLD with a size of 19m diameter.

  • CLF has a capacity of 28, 24, and 18 MLD

  • The size of the CLF is 19m in diameter

Add your answer

Q11. Detail of every structure of wtp

Ans.

The structures of a water treatment plant (WTP) include intake structures, treatment units, settling tanks, filters, disinfection units, and storage tanks.

  • Intake structures: where water is taken from the source (e.g. river, lake)

  • Treatment units: where physical, chemical, and biological processes are used to remove impurities

  • Settling tanks: where solids settle out of the water

  • Filters: where remaining impurities are removed

  • Disinfection units: where pathogens are killed to make ...read more

Add your answer

Q12. Process of all wtp structure

Ans.

The process of all water treatment plant structures involves designing, constructing, installing, and testing various components to ensure efficient water treatment.

  • Designing the layout of the water treatment plant structures

  • Constructing the physical structures such as tanks, pipelines, and treatment units

  • Installing equipment like pumps, filters, and chemical dosing systems

  • Testing the functionality of each structure and component to ensure proper operation

  • Commissioning the pl...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.7
 • 6.1k Interview Questions
3.5
 • 648 Interview Questions
4.1
 • 247 Interview Questions
4.2
 • 210 Interview Questions
4.0
 • 202 Interview Questions
View all
Top Brij Gopal Construction Company Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter