Upload Button Icon Add office photos

Filter interviews by

Br.CAT International Mechanical Engineer Interview Questions and Answers

Updated 19 Oct 2021

Br.CAT International Mechanical Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is hot tie- in? how it's work?
  • Ans. 

    Hot tie-in is a method of connecting a new pipeline to an existing one while it is still in operation.

    • Hot tie-in is used to avoid shutting down the existing pipeline, which can be costly and time-consuming.

    • The process involves welding a new section of pipeline onto the existing one while it is still carrying fluid or gas.

    • Specialized equipment and safety measures are required to ensure the process is carried out safely.

    • ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No comments.....................................

Interview questions from similar companies

I applied via Company Website and was interviewed before May 2017. There were 2 interview rounds.

Interview Preparation Tips

Round: Resume Shortlist
Experience: I have diploma °ree both in mechanical engineering

General Tips: My interview was held in bombay at head office of aarviencon.limited by H.R deportment darshan patel for 30 min at this time i maintain my pecence.
the question was realeted my subject mechanical engg and spoken english
Skills: communication skill, Communication, Leadership, Presentation Skills, Decision Making Skills
Duration: 1-4 weeks

I applied via Walk-in and was interviewed in Nov 2019. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. I'm autocad draftsman solidworks designer engineer
  • Q2. Production quality manufacturing company

Interview Preparation Tips

Interview preparation tips for other job seekers - Mechanical engineering

I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 6 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. 1st round is technical , 2nd is values & behaviors , 3rd is assessment road
  • Q2. Be clear on values & behaviours , practice assement round offline before attempting

Interview Preparation Tips

Interview preparation tips for other job seekers - its a long process may take 2-3 months , there is internal & external assement before selectioon is finalized . Good luck

I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 6 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(6 Questions)

  • Q1. Explain your self and where did you working current in 2014
  • Q2. Which gas can use for while hot/live tapping
  • Ans. 

    Nitrogen gas is commonly used for hot/live tapping in mechanical engineering.

    • Nitrogen gas is inert and non-reactive, making it safe to use in hot/live tapping processes.

    • It helps to create a protective atmosphere to prevent explosions or fires.

    • Nitrogen gas is readily available and cost-effective.

    • Other gases like argon or carbon dioxide can also be used depending on the specific requirements.

  • Answered by AI
  • Q3. Which method can we follow for railway/road/river crossings
  • Ans. 

    Various methods can be used for railway/road/river crossings depending on the location and other factors.

    • Bridges can be built over the crossing

    • Tunnels can be dug under the crossing

    • Level crossings can be used for roads

    • Flyovers can be constructed for roads

    • Ferries can be used for river crossings

    • Aqueducts can be built for waterways

    • Location, traffic volume, and safety considerations must be taken into account when choosing

  • Answered by AI
  • Q4. Which procedure can follow for pipe lines welding while route and filling
  • Ans. 

    The procedure for pipe lines welding while route and filling involves several steps.

    • Clean the area to be welded thoroughly

    • Tack weld the pipes together

    • Weld the root pass

    • Fill the remaining gap with weld metal

    • Perform post-weld heat treatment if required

    • Inspect the weld for defects

  • Answered by AI
  • Q5. Cross country pipeline code - Nitrogen
  • Q6. Explain About RT, UT, and magnetic partials
  • Ans. 

    RT, UT, and magnetic partials are non-destructive testing methods used in engineering.

    • RT stands for Radiographic Testing and uses X-rays or gamma rays to inspect the internal structure of a material.

    • UT stands for Ultrasonic Testing and uses high-frequency sound waves to detect flaws or defects in a material.

    • Magnetic particle testing uses magnetic fields and iron particles to detect surface and slightly subsurface defec...

  • Answered by AI
Round 3 - Assignment 

What IS API 5L

Round 4 - Coding Test 

What is ASME B 16.5

Round 5 - Coding Test 

What is ASME IX

Round 6 - Coding Test 

Whatbis ASME B 31.4

Interview Preparation Tips

Topics to prepare for Saudi Aramco Mechanical Engineer interview:
  • ASME, API, ASTM, ANSI,
Interview preparation tips for other job seekers - Feel free just listion and first what they are asking then don't give chance to them ask any other questions.
Even I attended in Chennai for other company but they call me for as a Project manager interview and they ask me questions in design, fabrication and supply time management. Then it's confirmed that post they already reserved for some others. If they reserve already they should not call for interveiw.

I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. The HR round was very pathetic. Sreethala took my HR round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't waste your precious time in giving the interview for Baker Hughes, Powai
Mumbai location. They will take all the interview rounds. The HR will ask you to submit all documents and last moment they will cancel your candidature without giving you any specific reason.
Round 1 - Technical 

(2 Questions)

  • Q1. Regarding job role, Maintenance strategy, Last troubleshooting which you handled
  • Q2. Project which you have handled

Interview Preparation Tips

Interview preparation tips for other job seekers - Give answer with confidence and be honest.
Give introduction in detail with your technical experience.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. I was asked to make a presentation on laser technology.
Round 3 - Aptitude Test 

Knowledge of the English language, its vocabulary and comprehension. Ability to solve basic mathematical problem, which shows the capacity to use an analytical approach to everyday puzzles.

Interview Preparation Tips

Interview preparation tips for other job seekers - One needs to present a bright visage. Then, you have to open minded towards the solutions to problems, instead of being dogmatic.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Impact of russia ukraine war

Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Explain functioning of pump
  • Ans. 

    A pump is a mechanical device used to move fluids from one place to another by creating pressure.

    • Pumps work by converting mechanical energy into fluid flow.

    • They typically consist of an inlet, an outlet, and a mechanism to move the fluid.

    • Examples include centrifugal pumps, diaphragm pumps, and piston pumps.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Why would you like to work with shell?
  • Q2. Have you worked in any oil and gas facility before now?
Round 3 - Group Discussion 

What I know about permit to work system

Tell us how to improve this page.

Br.CAT International Mechanical Engineer Salary
based on 4 salaries
₹9.6 L/yr - ₹20 L/yr
236% more than the average Mechanical Engineer Salary in India
View more details

Br.CAT International Mechanical Engineer Reviews and Ratings

based on 5 reviews

3.8/5

Rating in categories

3.1

Skill development

3.1

Work-life balance

2.9

Salary

4.6

Job security

3.7

Company culture

2.4

Promotions

3.3

Work satisfaction

Explore 5 Reviews and Ratings
Safety Officer
11 salaries
unlock blur

₹0.7 L/yr - ₹4.4 L/yr

HSE Officer
6 salaries
unlock blur

₹6.3 L/yr - ₹12.9 L/yr

QC Inspector
5 salaries
unlock blur

₹8.4 L/yr - ₹24 L/yr

QA QC Welding Inspector
5 salaries
unlock blur

₹17.9 L/yr - ₹20 L/yr

QC Welding Inspector
5 salaries
unlock blur

₹19 L/yr - ₹24 L/yr

Explore more salaries
Compare Br.CAT International with

Reliance Industries

4.0
Compare

Indian Oil Corporation

4.4
Compare

Shell

4.0
Compare

Oil And Natural Gas Corporation

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview