Filter interviews by
I applied via Referral and was interviewed before Jan 2023. There were 3 interview rounds.
General knowledge regarding current affairs and logical reasoning.
Top trending discussions
I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.
Various documents need to be maintained at the PMC office.
Project proposals and contracts
Budget and financial reports
Meeting minutes and agendas
Employee records and HR documents
Project progress reports
Legal and regulatory documents
Correspondence and communication records
Inventory and asset management records
Project controlling is exercised through monitoring, measuring, and adjusting project activities to ensure they align with project goals.
Project controlling involves setting up a project plan with clear goals and objectives.
Regular monitoring and measurement of project activities against the plan is necessary.
Adjustments are made to the project plan as needed to ensure alignment with project goals.
Project controlling a...
The limits of deviation of BOQ quantities as per CPWD norms depend on the type of work and range from -5% to +10%.
The limits of deviation are specified in the CPWD Manual.
For civil works, the limit of deviation is -5% to +10%.
For electrical and mechanical works, the limit of deviation is -10% to +15%.
For interior works, the limit of deviation is -10% to +20%.
The limits of deviation may vary depending on the type of wor...
Mivan shuttering has limitations in terms of design flexibility and cost-effectiveness.
Mivan shuttering is not suitable for complex designs or irregular shapes.
It requires skilled labor and specialized equipment, which can increase the overall cost.
It may not be suitable for small-scale projects due to the high initial investment.
It may not be suitable for projects with limited space or difficult access.
It may not be s...
CPWD norms for working space area for calculating earthworm quantity in excavation of basement
CPWD recommends a working space area of 1.5 times the depth of excavation for calculating earthworm quantity
For example, if the depth of excavation is 2 meters, the working space area should be 3 meters
This calculation is important for determining the amount of organic matter in the soil and the need for soil improvement
CPWD g...
posted on 31 May 2022
I applied via Job Fair and was interviewed before May 2021. There were 2 interview rounds.
QUant, aptitude, english all in one hour
It was about the road curves and what kind of material we can use for the long durability of road
I appeared for an interview before Feb 2024.
Self introduction about myself and work experiences
Abouts operations and you deal with driver's at previous Logistics company
posted on 30 May 2024
I applied via Campus Placement and was interviewed in Jun 2019. There were 5 interview rounds.
posted on 24 May 2020
I applied via Naukri.com and was interviewed in Nov 2019. There was 1 interview round.
I applied via Campus Placement and was interviewed in Nov 2020. There was 1 interview round.
posted on 4 Jul 2020
I applied via Naukri.com and was interviewed in Jan 2020. There were 7 interview rounds.
Planning of man power involves assessing staffing needs, creating schedules, and ensuring adequate coverage.
Assess staffing needs based on facility size, services offered, and peak hours of operation
Create schedules that balance workload and employee availability
Ensure adequate coverage by cross-training employees and having backup plans in place
Regularly review and adjust staffing plans based on changing needs and bud
I am available to work flexible hours and respond to emergencies as needed.
I am willing to work evenings, weekends, and holidays if necessary
I understand the importance of being on-call for emergencies
I have experience responding to urgent facility issues in a timely manner
I am able to prioritize tasks and manage my time effectively to handle unexpected situations
based on 1 interview
Interview experience
Software Engineer
53
salaries
| ₹5 L/yr - ₹16.5 L/yr |
Softwaretest Engineer
41
salaries
| ₹6 L/yr - ₹15.2 L/yr |
Application Software Engineer
28
salaries
| ₹6 L/yr - ₹14 L/yr |
Engineer- Customer Support
23
salaries
| ₹2.3 L/yr - ₹9.6 L/yr |
Software Developer
20
salaries
| ₹6.3 L/yr - ₹12 L/yr |
Indira Gandhi International Airport
Rudrabhishek Enterprises
Linfox Logistics
Maharashtra State Road Transport Corporation