Refrigeration cycle is a process in which refrigerant absorbs heat from the indoor air and releases it outside to cool the indoor space.
Refrigerant absorbs heat from indoor air in the evaporator coil
Refrigerant is compressed in the compressor to increase its temperature and pressure
Refrigerant releases heat outside in the condenser coil
Refrigerant expands in the expansion valve to lower its temperature and pressure
The main part of the refrigeration cycle is the compressor.
The compressor is responsible for pressurizing the refrigerant gas, increasing its temperature and energy.
It then sends the high-pressure, high-temperature gas to the condenser coil to release heat and cool down.
Examples of compressors include reciprocating, rotary, and scroll compressors.
The compressor is a vital component in an HVAC system responsible for pressurizing refrigerant to cool or heat the air.
Compresses refrigerant gas to increase its temperature and pressure
Sends the high-pressure gas to the condenser to release heat
Helps in circulating refrigerant throughout the system
Types of compressors include reciprocating, scroll, rotary, and centrifugal
An expansion valve is a device in a refrigeration system that controls the flow of refrigerant into the evaporator.
Regulates the flow of refrigerant into the evaporator to maintain proper temperature and pressure
Helps to control the cooling capacity of the system
Can be thermostatic or electronic
Examples include thermostatic expansion valves (TXV) and electronic expansion valves (EXV)
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
I appeared for an interview in Jan 2021.
I applied via Referral and was interviewed before Aug 2022. There were 6 interview rounds.
Sales skills and communication skills
I applied via Referral and was interviewed in Sep 2022. There was 1 interview round.
I applied via Referral and was interviewed in Feb 2024. There were 2 interview rounds.
WIP stands for Work in Progress. To deal with delays in WIP, it is important to identify bottlenecks, prioritize tasks, and communicate effectively with team members.
Identify bottlenecks in the workflow that are causing delays
Prioritize tasks based on urgency and impact on overall progress
Communicate effectively with team members to address issues and find solutions
Implement strategies such as daily stand-up meetings o...
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
posted on 11 Feb 2024
I applied via AngelList and was interviewed in Jan 2024. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
766
salaries
| ₹5 L/yr - ₹17 L/yr |
Senior Engineer
364
salaries
| ₹3.8 L/yr - ₹10.5 L/yr |
Deputy Manager
252
salaries
| ₹8.3 L/yr - ₹23 L/yr |
Senior Executive
152
salaries
| ₹4.3 L/yr - ₹9.1 L/yr |
Hvac Technician
148
salaries
| ₹0.9 L/yr - ₹7 L/yr |
OPPO
LG Electronics
Daikin
HP India