Filter interviews by
A universal testing machine is a device used to test the mechanical properties of materials.
It is commonly used in industries such as manufacturing, construction, and research.
It can measure properties like tensile strength, compression strength, and flexural strength.
The machine applies controlled forces to a specimen and measures the response, allowing for material characterization and quality control.
It consists of ...
Panel checking is a quality control process that involves inspecting and verifying the accuracy and functionality of electrical control panels.
Panel checking is performed to ensure that electrical control panels are built correctly and meet the required specifications.
It involves visually inspecting the panel for any physical defects or errors in wiring.
Functional testing is also conducted to ensure that all components...
PDI inspection stands for Pre-Delivery Inspection, which is a quality control process conducted before delivering a product or service to the customer.
PDI inspection is a comprehensive check performed to ensure that the product or service meets the required quality standards.
It involves inspecting various aspects such as functionality, performance, appearance, and safety.
PDI inspections are commonly conducted in indust...
5S is a methodology used in companies to improve workplace organization and efficiency.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine refers to cleaning and maintaining the workplace.
Standardize involves creating guidelines and procedures for maintainin...
Abnormality sechivatio refers to the process of identifying and addressing abnormalities in quality control.
Abnormality sechivatio involves detecting deviations from expected quality standards.
It includes analyzing data, conducting inspections, and implementing corrective actions.
Examples of abnormality sechivatio include identifying defective products, monitoring process variations, and addressing non-conformities.
The...
posted on 23 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 3 interview rounds.
I have a valid driver's license for both cars and motorcycles.
I have a Class C license for cars
I also have a Class M license for motorcycles
I have a clean driving record with no accidents or violations
I ride a road bike for commuting and a mountain bike for leisure.
I prefer road bikes for their speed and efficiency on paved roads.
I enjoy mountain biking for the challenge and adventure of off-road trails.
I also have experience with hybrid bikes for their versatility.
I prioritize safety and always wear a helmet and follow traffic laws.
I have participated in charity rides and group rides for fun and community.
Vehicle testing involves various methods to ensure safety, performance, and compliance with regulations.
Testing can include physical tests such as crash tests, durability tests, and performance tests.
Simulation and modeling can also be used to test vehicle components and systems.
Testing must comply with regulations set by organizations such as the National Highway Traffic Safety Administration (NHTSA) and the European
We conduct various types of homologation testing depending on the product and its intended market.
We conduct safety testing to ensure compliance with local regulations.
We perform emissions testing to ensure compliance with environmental regulations.
We conduct performance testing to ensure the product meets the required standards.
We also conduct durability testing to ensure the product can withstand the expected wear an...
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
I faced a defect in plastic commodity related to poor quality control during the manufacturing process.
The defect was in the form of cracks and breakages in the plastic products.
It was caused by inadequate monitoring and supervision during the molding and cooling stages.
The defect resulted in a high number of rejected products and customer complaints.
To address the issue, we implemented stricter quality control measure...
posted on 19 Jan 2021
I was interviewed in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
posted on 15 Apr 2022
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 3 interview rounds.
posted on 16 May 2024
posted on 17 Jun 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
I manage my workload by prioritizing tasks, delegating when necessary, and utilizing time management techniques.
Prioritize tasks based on deadlines and importance
Delegate tasks to team members to ensure efficiency
Use time management techniques such as setting goals and creating schedules
Regularly review and adjust workload to stay on track
Communicate with team members and supervisors to ensure alignment on priorities
Yes, I am willing to take on additional tasks to help others during busy schedules.
I believe in teamwork and helping each other out when needed
I am organized and efficient in managing my time to handle multiple tasks
I have experience in delegating responsibilities and coordinating with team members to ensure tasks are completed on time
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 263 reviews
Rating in categories
Senior Engineer
132
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
59
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Production Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
UNO Minda
Sundaram Clayton
Bharat Forge
Rane Group