Upload Button Icon Add office photos

Filter interviews by

Bechtel Enka Civil Foreman Interview Questions and Answers

Updated 16 Feb 2022

Bechtel Enka Civil Foreman Interview Experiences

1 interview found

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 16 Feb 2022

I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - HR 

(7 Questions)

  • Q1. Why should we hire you?
  • Ans. 

    Bcz i like team work, honestly with management program

  • Answered by Balbir Singh Singh
  • Q2. Tell me about yourself.
  • Ans. 

    I'm civil foreman gulf experience or Indian experience I must say layout to finishing work complete any civil project

  • Answered by Balbir Singh Singh
  • Q3. What are your salary expectations?
  • Ans. 

    2000 thousand Indian rupee per day 8 haurs

  • Answered Anonymously
  • Q4. Share details of your previous job.
  • Q5. Where do you see yourself in 5 years?
  • Q6. For safety first with team work under program management
  • Q7. For tunnel or finishing work program

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice trip Air Port project

Interview questions from similar companies

I appeared for an interview before Feb 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

12th

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil formen ho m mari ko job ki jarurt h
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How to check beam reinforcement?
  • Ans. 

    Beam reinforcement can be checked by visually inspecting the placement, size, and spacing of the steel bars within the beam.

    • Visually inspect the placement of steel bars within the beam to ensure they are in the correct position as per the design drawings.

    • Check the size of the steel bars to ensure they meet the specifications outlined in the structural drawings.

    • Verify the spacing between the steel bars to ensure they ar...

  • Answered by AI
  • Q2. What is the minimum dia rebar of column?
  • Ans. 

    The minimum diameter of rebar for a column depends on the structural design and load requirements.

    • The minimum diameter of rebar for a column is typically specified in the structural drawings or design documents.

    • Common minimum diameters for column rebars range from 12mm to 25mm, depending on the size and load-bearing capacity of the column.

    • The minimum diameter of rebar is important for ensuring the structural integrity ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Cover of reinforcement of slab?
  • Ans. 

    Cover of reinforcement of slab refers to the distance between the outer surface of the concrete and the reinforcement bars.

    • The cover of reinforcement is important for protecting the reinforcement from corrosion and ensuring structural integrity.

    • The typical cover of reinforcement for slabs is around 20-30mm, but it can vary depending on the design requirements.

    • Factors such as exposure conditions, concrete quality, and l...

  • Answered by AI
  • Q2. How to calculate of concrete quantity?
  • Ans. 

    Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.

    • Calculate the volume of the area to be filled (length x width x height)

    • Determine the density of the concrete (usually around 2400 kg/m^3)

    • Multiply the volume by the density to get the total concrete quantity needed

    • Consider adding a percentage for wastage or spillage

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Type of bricks joint?
  • Ans. 

    There are various types of brick joints used in construction, such as flush joint, raked joint, weathered joint, and v-joint.

    • Flush joint is a joint where the mortar is flush with the face of the brick.

    • Raked joint is a joint where the mortar is recessed slightly from the face of the brick.

    • Weathered joint is a joint where the mortar is sloped to allow water to run off.

    • V-joint is a joint where the mortar is shaped like a

  • Answered by AI
  • Q2. Type of bricks,?
  • Ans. 

    There are various types of bricks used in construction, such as clay bricks, concrete bricks, and fire bricks.

    • Clay bricks are made from clay and are commonly used for construction.

    • Concrete bricks are made from concrete and are known for their strength and durability.

    • Fire bricks are made to withstand high temperatures and are used in fireplaces and kilns.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I know the civil work. It' s very good.

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Work details and your behavior your attitude your skills your experience You speak true your skills your experience averything
  • Q2. Start is how are you, what is your skills, your experience, your behavior your all details
  • Q3. Your work experience, how you give progress fast, how you save workrs, how you manage manpower
  • Ans. 

    I prioritize efficient progress, worker safety, and effective manpower management.

    • I closely monitor project timelines and identify areas where progress can be expedited.

    • I implement strategies such as streamlining processes, optimizing resource allocation, and utilizing technology to increase productivity.

    • For example, in my previous role as a Civil Foreman, I introduced a new scheduling system that reduced project compl...

  • Answered by AI
  • Q4. How you work experience, you speak true sir I'm working this company 3 years this is my sartifiket

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Civil Foreman interview:
  • Civil Construction
  • Your work experience
  • Your sartifiket
  • Your behavior
  • Your aducation
  • How to give progress
  • Drawing you know
  • How you expect salary
  • All details
Interview preparation tips for other job seekers - Don't think negative, think positive and speak averything true that sit

Interview Questionnaire 

1 Question

  • Q1. Structure work
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Casting ke liye kya chahiye
  • Q2. Sariya ka daya kitne hote hai
  • Q3. Setring ko kaise redi karte hai
Round 2 - One-on-one 

(1 Question)

  • Q1. Igadar kya hai aur t gatar me antar
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is well foundation and tilt shift method
  • Ans. 

    Well foundation is a type of foundation used in civil engineering while tilt shift method is a photography technique.

    • Well foundation is a type of deep foundation used to support heavy structures on soft soil or water bodies.

    • It consists of a large diameter well-like structure made of concrete or steel, which is sunk into the ground or waterbed.

    • The space inside the well is then filled with concrete or stone to provide a ...

  • Answered by AI
  • Q2. What is segment lifting proseger
  • Ans. 

    Segment lifting process is a technique used in construction to lift and place precast concrete segments for bridge construction.

    • It involves the use of cranes and specialized lifting equipment.

    • The segments are lifted and placed in a predetermined sequence to form the bridge deck.

    • This process is faster and more efficient than traditional bridge construction methods.

    • Examples of projects that have used segment lifting incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please give me chance for working with you I'm specialist for bridge project
Round 1 - Technical 

(1 Question)

  • Q1. Type of Pile Foundation
  • Ans. 

    Pile foundation is a type of deep foundation used to transfer heavy loads of structures to deeper soil or rock strata.

    • Pile foundation can be classified into two types: end-bearing piles and friction piles.

    • End-bearing piles transfer the load of the structure to a hard layer of rock or soil at the bottom of the pile.

    • Friction piles transfer the load of the structure to the soil around the pile through skin friction.

    • Common...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil work hard working be active think positively

I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical questions .structure work
Related.like road bridge and building.

I applied via Campus Placement and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Based on your project

Interview Preparation Tips

Interview preparation tips for other job seekers - stick to basics, answer straight forward, try to provide some examples while answering.

Bechtel Enka Interview FAQs

How many rounds are there in Bechtel Enka Civil Foreman interview?
Bechtel Enka interview process usually has 1 rounds. The most common rounds in the Bechtel Enka interview process are HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 746 Interviews
Tata Group Interview Questions
4.2
 • 359 Interviews
Adani Group Interview Questions
3.9
 • 187 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 116 Interviews
Worley Interview Questions
4.1
 • 111 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
View all

Bechtel Enka Civil Foreman Reviews and Ratings

based on 3 reviews

4.0/5

Rating in categories

4.9

Skill development

5.0

Work-life balance

4.0

Salary

4.0

Job security

4.9

Company culture

4.9

Promotions

4.9

Work satisfaction

Explore 3 Reviews and Ratings
Compare Bechtel Enka with

Larsen & Toubro Limited

4.0
Compare

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview