I have extensive experience in using various piping design tools.
Proficient in using AutoCAD for piping design
Familiar with 3D modeling software like SolidWorks for creating detailed piping layouts
Skilled in using piping design software such as Caesar II for stress analysis
Experience in using PDMS (Plant Design Management System) for piping design and layout
Knowledge of industry standards and codes related to piping de
posted on 13 Oct 2021
I applied via Referral and was interviewed before Oct 2020. There were 4 interview rounds.
A protection system is a set of devices and measures designed to prevent damage or harm to equipment, personnel, or the environment in case of a fault or abnormal condition.
Protection systems can include circuit breakers, fuses, relays, and alarms.
They are commonly used in electrical systems to prevent overloads, short circuits, and ground faults.
Protection systems are essential for ensuring the safety and reliability ...
I appeared for an interview before Mar 2022.
I applied via Campus Placement and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.
DMZ is a network segment that acts as a buffer zone between the internet and an organization's internal network.
DMZ stands for Demilitarized Zone.
It is a network segment that is isolated from the internal network and the internet.
It is used to host publicly accessible servers like web servers, email servers, etc.
DMZ is protected by a firewall that allows only specific traffic to pass through.
It helps to enhance the sec...
To find the difference in Air and N2 in a plant, analyze the composition and properties of each gas.
Analyze the composition of Air (mainly nitrogen and oxygen) and N2 (pure nitrogen)
Measure the concentration of each gas in the plant
Consider the properties of each gas such as density, boiling point, and reactivity
Use gas detection equipment to identify and quantify the presence of Air and N2
Our plant generates approximately 100 tons of waste per month.
We have implemented waste reduction strategies to minimize our environmental impact.
We segregate waste into different categories for proper disposal and recycling.
Regular waste audits are conducted to track and analyze our waste generation.
Examples: paper waste, plastic waste, organic waste, hazardous waste
HAZOP focuses on identifying potential hazards in a process, while HIRA assesses risks associated with those hazards.
HAZOP stands for Hazard and Operability Study, which is a structured technique used to identify potential hazards in a process plant.
HIRA stands for Hazard Identification and Risk Assessment, which involves assessing the risks associated with identified hazards.
HAZOP is more focused on identifying specif...
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 19 reviews
Rating in categories
Assistant Manager
105
salaries
| ₹7.4 L/yr - ₹22.5 L/yr |
Executive Production
40
salaries
| ₹5 L/yr - ₹14.5 L/yr |
Development Officer
39
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Deputy Manager
30
salaries
| ₹12 L/yr - ₹36 L/yr |
Field Development Officer
25
salaries
| ₹1.6 L/yr - ₹3.6 L/yr |
Berger Paints
Kansai Nerolac Paints
AkzoNobel
Godrej Industries Group