Add office photos
Engaged Employer

Barbrik Project Limited (PRA Group)

4.3
based on 182 Reviews
Filter interviews by

10+ Siemens Interview Questions and Answers

Updated 5 Feb 2024

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u...

read more
Ans.

Answering questions related to QA QC Engineer position

  • If material is purchased from any factory, I will ensure that it meets the required specifications and standards

  • I can work for 8-10 hours a day depending on the workload

  • I am familiar with plant calibration procedures and can perform them

  • The borrow area will be selected based on factors such as soil type, distance from the construction site, and availability

  • I manage my juniors by delegating tasks, providing guidance, and mo...read more

View 3 more answers

Q2. Maintenance of plants and earthmoving equipment?

Ans.

Regular maintenance of plants and earthmoving equipment is crucial for ensuring their optimal performance and longevity.

  • Create a maintenance schedule and stick to it

  • Perform regular inspections to identify any issues before they become major problems

  • Keep a record of all maintenance activities and repairs

  • Train employees on proper use and maintenance of equipment

  • Invest in high-quality equipment and parts

  • Consider outsourcing maintenance to experts in the field

  • Examples: changing o...read more

Add your answer

Q3. Management of plants and machinery

Ans.

Effective management of plants and machinery is crucial for efficient logistics operations.

  • Regular maintenance and inspections to ensure optimal performance and prevent breakdowns

  • Investing in modern and efficient equipment to improve productivity

  • Implementing a system for tracking and scheduling maintenance and repairs

  • Training staff on proper use and maintenance of equipment

  • Monitoring equipment usage and performance to identify areas for improvement

  • Ensuring compliance with saf...read more

Add your answer

Q4. please explained the bumping removing process

Ans.

Bumping removing process is a method used to eliminate or reduce the occurrence of bumps or uneven surfaces on a construction site.

  • Bumping removing process involves identifying and addressing the causes of bumps or uneven surfaces on the site.

  • Common causes of bumps include improper compaction of soil, uneven grading, or the presence of debris.

  • The process may include activities such as regrading, compacting the soil, removing debris, or leveling the surface.

  • Regular inspections...read more

View 1 answer
Discover Siemens interview dos and don'ts from real experiences

Q5. If we select you what will be value addition by you

Add your answer

Q6. What will be the roll of AI for future HR Leaders

Add your answer

Q7. Whats is a gsb tollrance

Ans.

GSB tolerance refers to the acceptable level of deviation from the specified requirements in the GSB (Granular Sub Base) layer of a construction project.

  • GSB tolerance determines the allowable variation in thickness, compaction, and gradation of the GSB layer.

  • It is important to adhere to the specified GSB tolerance to ensure the stability and durability of the road or pavement.

  • For example, if the GSB tolerance for compaction is ±2%, it means that the actual compaction value ca...read more

View 1 answer

Q8. PMS implementation for a start up

Ans.

Implementing a Performance Management System (PMS) for a start-up.

  • Understand the organization's goals and objectives

  • Define clear performance metrics and expectations

  • Select a suitable PMS software or tool

  • Train managers and employees on using the PMS

  • Regularly monitor and evaluate performance

  • Provide feedback and coaching to improve performance

  • Use performance data for decision-making and rewards

  • Continuously improve the PMS based on feedback and results

Add your answer

Q9. Scope of the project

Ans.

The scope of the project is to streamline billing and planning processes for the Assistant Manager role.

  • Develop and implement efficient billing procedures

  • Create and maintain billing schedules

  • Ensure accurate and timely invoicing

  • Collaborate with cross-functional teams to optimize planning strategies

  • Identify and resolve billing discrepancies

  • Analyze data to identify areas for improvement

  • Implement cost-saving measures

  • Train and supervise billing staff

  • Stay updated with industry regu...read more

Add your answer

Q10. Types of clutches

Ans.

Clutches are devices used to transmit power from one component to another. There are several types of clutches.

  • Friction clutch

  • Electromagnetic clutch

  • Hydraulic clutch

  • Centrifugal clutch

  • Dog clutch

  • Cone clutch

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Siemens

based on 10 interviews
Interview experience
4.6
Excellent
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

4.1
 • 277 Interview Questions
4.2
 • 239 Interview Questions
3.8
 • 211 Interview Questions
4.0
 • 173 Interview Questions
3.9
 • 152 Interview Questions
3.4
 • 134 Interview Questions
View all
Top Barbrik Project Limited (PRA Group) Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter