Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2023. There were 3 interview rounds.
Meeting and planning with work progress
Bar weight of reinforcement refers to the weight of steel bars used in construction to reinforce concrete structures.
Bar weight is typically measured in kilograms per meter (kg/m) or pounds per foot (lb/ft).
The weight of reinforcement bars can vary depending on the diameter and type of steel used.
Calculating the total weight of reinforcement bars is important for structural design and cost estimation.
For example, a 10m...
I appeared for an interview in Jul 2022.
I appeared for an interview in Nov 2020.
QA focuses on preventing defects while QC focuses on identifying and correcting defects.
QA is a proactive process that involves planning, designing, and implementing quality systems to prevent defects from occurring.
QC is a reactive process that involves testing and inspecting products or services to identify and correct defects.
QA is focused on the entire process of product development, while QC is focused on the fina...
Prioritize tasks based on urgency and importance, delegate responsibilities, and use time management techniques.
Create a to-do list and prioritize tasks based on urgency and importance
Delegate responsibilities to team members or colleagues
Use time management techniques such as the Pomodoro technique or time blocking
Ensure clear communication with all stakeholders
Regularly review progress and adjust priorities as needed
Method statements are prepared by analyzing the project requirements and identifying the necessary steps. I am very flexible in working.
Analyze project requirements
Identify necessary steps
Include safety measures
Ensure compliance with regulations
Be open to suggestions and changes
Collaborate with team members
Prioritize tasks based on urgency
Maintain clear communication with stakeholders
Bansal Infratech Synergies interview questions for popular designations
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Grade of concrete at site refers to the strength of the concrete mix used in construction.
Grade of concrete is specified by its compressive strength in megapascals (MPa) at 28 days.
Common grades of concrete include M20, M25, M30, etc.
Higher grade concrete indicates higher strength and durability.
The grade of concrete is determined by the mix design and testing of samples.
For example, M25 grade concrete has a compressiv
based on 3 interviews
Interview experience
based on 58 reviews
Rating in categories
Safety Officer
17
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Civil Site Engineer
15
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Civil Engineer
12
salaries
| ₹3 L/yr - ₹6.1 L/yr |
QA QC Engineer
10
salaries
| ₹3 L/yr - ₹6 L/yr |
Safety Supervisor
9
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures