Filter interviews by
I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
AC and DC differ in the direction of current flow and the type of voltage waveform.
AC stands for alternating current, which changes direction periodically, while DC stands for direct current, which flows in one direction.
AC is commonly used in household appliances and power distribution systems, while DC is used in batteries and electronic devices.
AC voltage waveform is sinusoidal, while DC voltage is constant.
AC can b...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
Improving communication and personality requires self-awareness, active listening, and continuous learning.
Practice active listening to understand others' perspectives
Be aware of your own communication style and adjust as needed
Seek feedback and be open to constructive criticism
Read books or take courses on communication and interpersonal skills
Practice empathy and emotional intelligence
Be respectful and courteous in a
First impressions can be shown through body language, attire, and communication skills.
Body language can convey confidence or nervousness
Attire can show professionalism or lack thereof
Communication skills can demonstrate intelligence and articulation
Eye contact and a firm handshake can also make a positive impression
I applied via Campus Placement and was interviewed in Mar 2022. There were 4 interview rounds.
Part programming for VMC and tool selection
posted on 21 Feb 2022
I applied via Campus Placement and was interviewed before Feb 2021. There was 1 interview round.
posted on 5 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in May 2022. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
The latest version of PPAP is PPAP 4th Edition.
PPAP stands for Production Part Approval Process.
The 4th Edition of PPAP was released in 2006.
It is a standardized process in the automotive industry to ensure that suppliers meet the requirements for production parts.
PPAP includes documentation such as design records, engineering change documents, and control plans.
It also involves conducting various tests and measurement...
FMEA is a method used during development to identify and mitigate potential failures in a system or process.
FMEA stands for Failure Mode and Effects Analysis.
It is a systematic approach to identify and prioritize potential failures in a system or process.
FMEA helps in understanding the potential causes and effects of failures.
It is used to assess the severity, occurrence, and detectability of failures.
By analyzing fail...
DVP&R stands for Design Verification Plan and Report. It is a process used to ensure that a product meets its design specifications.
DVP&R is a structured approach to testing and validating a product's design.
It involves creating a plan for testing the product, executing the tests, and documenting the results.
The plan includes details such as the test objectives, test methods, acceptance criteria, and test schedule.
The ...
NDC stands for National Drug Code. It is a unique identifier for drugs in the United States.
NDC is a 10-digit code that identifies drugs, including prescription and over-the-counter medications.
The first segment of the NDC represents the labeler code, which identifies the manufacturer or distributor of the drug.
The second segment represents the product code, which identifies the specific drug formulation and strength.
T...
PPAP file making is done during the production validation stage of NPD work.
PPAP file making is a part of the production validation process in NPD work
It involves documenting the production process and ensuring it meets customer requirements
PPAP file making is typically done after the design and development stages
It includes documentation such as control plans, process flow diagrams, and inspection records
The ppm in 6 sigma is 3.4 defects per million opportunities (DPMO).
6 sigma aims for a defect rate of 3.4 DPMO.
PPM stands for parts per million.
DPMO is a measure of process performance.
The lower the DPMO, the better the process performance.
Achieving 6 sigma means having a process that produces 99.99966% defect-free output.
Pareto chart is a problem-solving tool used to identify and prioritize the causes of a problem.
Pareto chart is a bar graph that displays the relative frequency or size of problems in descending order of importance.
It helps to identify the vital few causes that account for the majority of the problems.
It is based on the Pareto principle, also known as the 80/20 rule, which states that 80% of the effects come from 20% of...
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
Spares management involves inventory control, procurement, and maintenance planning.
Create a detailed inventory of all spares and their usage frequency.
Establish a procurement process that ensures timely availability of spares.
Implement a maintenance plan that includes regular inspection and replacement of spares.
Use technology such as barcoding and RFID to track spares and prevent loss or theft.
Regularly review and up...
Shift issues can be managed by effective communication, proper scheduling, and providing necessary resources.
Establish clear communication channels between team members and management
Create a schedule that takes into account employee preferences and availability
Ensure that all necessary resources are available for each shift
Regularly review and adjust the schedule as needed
Provide training and support for employees to ...
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
based on 1 interview
Interview experience
Production Engineer
88
salaries
| ₹1.6 L/yr - ₹7.3 L/yr |
Assistant Manager
57
salaries
| ₹5.8 L/yr - ₹10.5 L/yr |
Senior Engineer
32
salaries
| ₹3.5 L/yr - ₹8.1 L/yr |
Quality Inspector
31
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Quality Engineer
24
salaries
| ₹1.2 L/yr - ₹3.2 L/yr |
JBM Group
Subros
Varroc Group
Endurance Technologies