I applied via Walk-in and was interviewed in Apr 2022. There was 1 interview round.
The question is unclear and requires more context to provide an accurate answer.
More information is needed to determine the phase in current line.
It could refer to a specific industry or electrical system.
Examples of phases in electrical systems include single-phase and three-phase.
It could also refer to a stage in a project or process.
Clarification is necessary to provide a proper response.
Electricity is the flow of electrons through a conductor.
Electricity is caused by the movement of electrons.
Electrons flow from areas of high concentration to areas of low concentration.
Electricity can be generated by chemical reactions, heat, light, or magnetism.
Electricity can be measured in units of volts, amps, and watts.
Electricity can be dangerous and must be handled with care.
Part programming for VMC and tool selection
I applied via Walk-in and was interviewed in May 2022. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
Spares management involves inventory control, procurement, and maintenance planning.
Create a detailed inventory of all spares and their usage frequency.
Establish a procurement process that ensures timely availability of spares.
Implement a maintenance plan that includes regular inspection and replacement of spares.
Use technology such as barcoding and RFID to track spares and prevent loss or theft.
Regularly review and up...
Shift issues can be managed by effective communication, proper scheduling, and providing necessary resources.
Establish clear communication channels between team members and management
Create a schedule that takes into account employee preferences and availability
Ensure that all necessary resources are available for each shift
Regularly review and adjust the schedule as needed
Provide training and support for employees to ...
I applied via Company Website and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
The latest version of PPAP is PPAP 4th Edition.
PPAP stands for Production Part Approval Process.
The 4th Edition of PPAP was released in 2006.
It is a standardized process in the automotive industry to ensure that suppliers meet the requirements for production parts.
PPAP includes documentation such as design records, engineering change documents, and control plans.
It also involves conducting various tests and measurement...
FMEA is a method used during development to identify and mitigate potential failures in a system or process.
FMEA stands for Failure Mode and Effects Analysis.
It is a systematic approach to identify and prioritize potential failures in a system or process.
FMEA helps in understanding the potential causes and effects of failures.
It is used to assess the severity, occurrence, and detectability of failures.
By analyzing fail...
DVP&R stands for Design Verification Plan and Report. It is a process used to ensure that a product meets its design specifications.
DVP&R is a structured approach to testing and validating a product's design.
It involves creating a plan for testing the product, executing the tests, and documenting the results.
The plan includes details such as the test objectives, test methods, acceptance criteria, and test schedule.
The ...
NDC stands for National Drug Code. It is a unique identifier for drugs in the United States.
NDC is a 10-digit code that identifies drugs, including prescription and over-the-counter medications.
The first segment of the NDC represents the labeler code, which identifies the manufacturer or distributor of the drug.
The second segment represents the product code, which identifies the specific drug formulation and strength.
T...
PPAP file making is done during the production validation stage of NPD work.
PPAP file making is a part of the production validation process in NPD work
It involves documenting the production process and ensuring it meets customer requirements
PPAP file making is typically done after the design and development stages
It includes documentation such as control plans, process flow diagrams, and inspection records
The ppm in 6 sigma is 3.4 defects per million opportunities (DPMO).
6 sigma aims for a defect rate of 3.4 DPMO.
PPM stands for parts per million.
DPMO is a measure of process performance.
The lower the DPMO, the better the process performance.
Achieving 6 sigma means having a process that produces 99.99966% defect-free output.
Pareto chart is a problem-solving tool used to identify and prioritize the causes of a problem.
Pareto chart is a bar graph that displays the relative frequency or size of problems in descending order of importance.
It helps to identify the vital few causes that account for the majority of the problems.
It is based on the Pareto principle, also known as the 80/20 rule, which states that 80% of the effects come from 20% of...
I appeared for an interview in Jun 2022.
I am an experienced Senior Engineer with a strong background in software development and project management.
Over 10 years of experience in software development
Proficient in multiple programming languages such as Java, C++, and Python
Extensive knowledge of software development methodologies and best practices
Proven track record of successfully leading and delivering complex projects
Strong problem-solving and analytical ...
8D report is a problem-solving methodology used to identify, correct and prevent recurring problems.
8D stands for 8 Disciplines
It involves a team-based approach to problem-solving
The report includes a detailed description of the problem, root cause analysis, corrective actions, and preventive measures
Example: A manufacturing company received customer complaints about a defect in their product. The team used the 8D repo...
I applied via Campus Placement and was interviewed before Nov 2023. There were 2 interview rounds.
It was MCQ based test which involves basic Aptitude questions on the topics like data interpolation, permutation combination and also involved basic questions over Analog and digital electronics system, control system and communication system which usually we learn in 2nd year of the engineering
Capacitors store and release electrical energy in AC/DC circuits.
Capacitors block DC current while allowing AC current to pass through
Capacitors store energy in an electric field when connected to a DC circuit
Capacitors release stored energy in the form of AC current when connected to an AC circuit
A diode is a semiconductor device that allows current to flow in one direction only. Breakdown can occur due to excessive voltage or current.
Diode allows current to flow in one direction due to its PN junction
Breakdown can occur due to excessive voltage (avalanche breakdown) or excessive current (thermal breakdown)
Zener diodes are designed to operate in breakdown region for voltage regulation
Thevenin's theorem states that any linear electrical network can be replaced by an equivalent circuit consisting of a single voltage source and a single series resistor.
The theorem simplifies complex circuits into simpler equivalent circuits for analysis.
It helps in determining the voltage and current across any component in the network.
The equivalent Thevenin voltage is the open-circuit voltage at the terminals of the...
Stability analysis in control systems involves assessing the stability of a system's behavior over time.
Stability analysis is crucial in ensuring that a control system operates predictably and reliably.
Methods such as root locus, Bode plot, and Nyquist plot are commonly used for stability analysis.
Stability criteria, such as the Nyquist stability criterion or Routh-Hurwitz criterion, are used to determine system stabil...
based on 4 reviews
Rating in categories
Production Engineer
87
salaries
| ₹1.5 L/yr - ₹7.3 L/yr |
Assistant Manager
57
salaries
| ₹5.8 L/yr - ₹10.5 L/yr |
Senior Engineer
32
salaries
| ₹3.5 L/yr - ₹8.1 L/yr |
Quality Inspector
31
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Quality Engineer
24
salaries
| ₹1.2 L/yr - ₹3.2 L/yr |
JBM Group
Subros
Varroc Group
Endurance Technologies