Round 1 - Technical 

(5 Questions)

  • Q1. Electrical engineer
  • Q2. Electrical supervisor
  • Q3. Diploma electrical
  • Q4. I am interested
  • Q5. Work in interested

Interview Preparation Tips

Interview preparation tips for other job seekers - Diploma electrical engineer
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Technical 

(2 Questions)

  • Q1. I am electrical technician Offshor returner
  • Q2. Diploma 12th
Round 2 - Technical 

(1 Question)

  • Q1. To
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical questions
Round 2 - Group Discussion 

Rotten egg on inverted pen, social media

Round 3 - One-on-one 

(1 Question)

  • Q1. Interview questions
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Unit of resistance
  • Ans. 

    The unit of resistance is ohm (Ω), named after German physicist Georg Simon Ohm.

    • The unit symbol for resistance is Ω

    • Resistance is measured using an ohmmeter

    • 1 ohm is equal to 1 volt per ampere (V/A)

  • Answered by AI
  • Q2. Unit of current
  • Ans. 

    The unit of current is Ampere (A)

    • The unit of current is named after the French physicist Andre-Marie Ampere

    • 1 Ampere is defined as the flow of 1 Coulomb of charge per second

    • Commonly used prefixes for current include milliampere (mA) and microampere (μA)

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,AC...
  • Ans. 

    Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, and relays.

    • Perform regular maintenance on high and low voltage breakers, motors, and transformers.

    • Test and calibrate various protection relays for motors, transformers, and generators.

    • Conduct transformer oil BDV test, thermal scanning, and earth fault and prediction tests.

    • Terminate high voltage motors, instal...

  • Answered by AI
  • Q2. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,AC...
  • Ans. 

    Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, and relays.

    • Perform regular maintenance tasks on high and low voltage breakers, motors, and transformers.

    • Test and calibrate protection relays for motors, transformers, and generators.

    • Conduct transformer oil BDV tests, thermal scanning, and earth fault and prediction tests.

    • Terminate high voltage motors, install...

  • Answered by AI
  • Q3. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,AC...
  • Ans. 

    Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, switches, relays, and testing/calibration of protections.

    • Preventive maintenance of H.V & LV breakers, motors, transformers, switches, etc.

    • Corrective maintenance of HV/MV/LV switchgears, breakers, cubicles, etc.

    • Testing and calibration of various protection relays for motors, transformers, generators.

    • Transforme...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11
KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV
Switches gears,VCB,ACB,MOCB,SF6 Breakers, Breaker cubicle, earthling Switches ,Generator
earthling Switch ETC. Testing and calibration of all kinds of protections Relay of High Voltage and
low Voltage Motors, Transformers ,Generator like Under Voltage Relay , locked Rotor Relay
,Differential Relay , Negative Phase Sequence Relay , Over current/Thermal Over Current Relay ,
Bucholz Relay , DGPT Relay ETC. Transformer Oil BDV Test, Thermal Scanning , Earth fault and
Prediction Test of Equipment .Termination of high Voltage Motors , Cable Errection , Installation of
Motors, and Trial/Load Test. Transformer Oil Extracting ,Testing (BDV), Oil Filtration .
Equipments Of Oil & Gas Plant , Chlorine Plant, co2 plant
Maintenance of battery Banks , UPS for auxiliary Start UP and Control Voltage call safe supply.
EQUIPMENT UNDER RESPONSIBILITIES :
 MV MOTORS UPTO 2400 KW / 3 PHASE / 6600V / 60HZ
 LV MOTORS UPTO 125 KW / 3PHANSE / 380V / 60HZ
 RECTIFIER FOR CL2 PLANT CELL 3000 AMP / 380/60HZ / 120V DC
 TRANSFORMERS 15.75 KV / 230 KV – 150MVA
 TRANSFORMERS 15.75 KV / 6.6KV – 80 MVA
 TRANSFORMERS 6.6KV / 380V – 800KVA
 BATTERY BANKS 2000 AMP
 INVERTER / CHARGER 2000 AMP  SWITCH GEARS MV 6.6 KV / 3500 AMP SWITCH
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Assigned for the Construction, Commissioning and Operation works related to tunnel system
  • Q2. Work includes Loop checking, testing, commissioning, functional test and trouble shooting of LV Switch gear. MCC, Motors, VFD

Interview Preparation Tips

Interview preparation tips for other job seekers - trouble shooting of LV Switch gear. MCC, Motors, VFD, PLC, BMS system, FIRE ALARM and LIGHTING system Installation.

I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. 1. Tell me about urself. 2. Questions from whatever projects,achievements you highlighted in resume or during answering ques bo 1

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare the answer for tel me about urself, ur answer for this question will shape ur further interview

Interview Questionnaire 

1 Question

  • Q1. Electrical O&M
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
No response

I applied via Campus Placement and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Difference between induction motor and synchronous motor
  • Ans. 

    Induction motor operates on the principle of electromagnetic induction, while synchronous motor operates at a constant speed determined by the frequency of the power supply.

    • Induction motor does not require any external excitation to run, while synchronous motor requires a separate DC power source for excitation.

    • Induction motor has a slightly lower efficiency compared to synchronous motor.

    • Synchronous motor is used in ap...

  • Answered by AI
  • Q2. Switchgear , types and working
  • Q3. Transformer parts and use
  • Ans. 

    Transformer parts include core, windings, and insulation. It is used to step up or step down voltage in electrical systems.

    • Transformer parts: core, windings, insulation

    • Core: provides magnetic path for flux

    • Windings: primary and secondary coils

    • Insulation: prevents short circuits

    • Used to step up or step down voltage in electrical systems

  • Answered by AI

Baker Hughes Interview FAQs

How many rounds are there in Baker Hughes Electrical Supervisor interview?
Baker Hughes interview process usually has 1 rounds. The most common rounds in the Baker Hughes interview process are Technical.
What are the top questions asked in Baker Hughes Electrical Supervisor interview?

Some of the top questions asked at the Baker Hughes Electrical Supervisor interview -

  1. My education completed my experience electrical associate Alstom manufacturing ...read more
  2. My all experiences plant mantena...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Shell Interview Questions
4.0
 • 188 Interviews
Schlumberger Interview Questions
4.0
 • 134 Interviews
GAIL Interview Questions
4.5
 • 77 Interviews
TechnipFMC Interview Questions
4.0
 • 68 Interviews
ExxonMobil Interview Questions
3.8
 • 68 Interviews
Saudi Aramco Interview Questions
4.6
 • 55 Interviews
Saipem Interview Questions
4.1
 • 43 Interviews
Petrofac Interview Questions
4.3
 • 40 Interviews
View all

Baker Hughes Electrical Supervisor Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

2.0

Work-Life balance

2.0

Salary & Benefits

2.0

Job Security

5.0

Company culture

1.0

Promotions/Appraisal

3.0

Work Satisfaction

Explore 1 Review and Rating
Software Engineer
181 salaries
unlock blur

₹6 L/yr - ₹18.6 L/yr

Senior Software Engineer
149 salaries
unlock blur

₹11 L/yr - ₹33.3 L/yr

Lead Engineer
85 salaries
unlock blur

₹11 L/yr - ₹24.2 L/yr

Procurement Specialist
65 salaries
unlock blur

₹4.4 L/yr - ₹9.1 L/yr

Sourcing Specialist
47 salaries
unlock blur

₹4.4 L/yr - ₹18.1 L/yr

Explore more salaries
Compare Baker Hughes with

Schlumberger

4.0
Compare

Halliburton

3.7
Compare

Weatherford

4.0
Compare

National Oilwell Varco

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview