Filter interviews by
I applied via Campus Placement and was interviewed in Sep 2024. There were 2 interview rounds.
Market Entry for a packaged drinking water company
The number of tricycles sold in India in a year varies depending on market demand and economic factors.
Sales of tricycles in India can be influenced by factors such as disposable income, population demographics, and government policies promoting eco-friendly transportation.
Companies like Hero Cycles, Atlas Cycles, and Avon Cycles are major players in the Indian tricycle market.
The COVID-19 pandemic may have impacted tr...
Top trending discussions
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
Performance Testing Life cycle involves planning, preparation, execution, analysis, and reporting.
1. Planning: Define objectives, select tools, and create test plan.
2. Preparation: Set up test environment, create test scripts, and configure monitoring.
3. Execution: Run tests, monitor performance metrics, and collect data.
4. Analysis: Analyze results, identify bottlenecks, and optimize performance.
5. Reporting: Generate...
Correlation is used to handle dynamic values in scripts, while Parameterization is used to pass different values to the script.
Correlation is used to extract dynamic values from server responses and replace them in subsequent requests.
Parameterization is used to pass different sets of data to the script for testing different scenarios.
Correlation is important for maintaining session integrity and ensuring accurate test...
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
Testing Life Cycle involves planning, designing, executing, and analyzing tests to ensure software quality.
Planning phase involves defining test objectives, scope, and resources.
Design phase includes creating test cases, scripts, and data.
Execution phase involves running tests and collecting results.
Analysis phase includes reviewing results, identifying defects, and reporting.
Iterative process to improve software quali...
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
Performance Testing Life Cycle involves planning, preparation, execution, analysis, and reporting.
1. Planning: Define objectives, select tools, and create test plan.
2. Preparation: Set up test environment, create test scripts, and configure monitoring.
3. Execution: Run tests, monitor performance metrics, and collect data.
4. Analysis: Analyze results, identify bottlenecks, and optimize performance.
5. Reporting: Generate...
Correlation is a technique used in performance testing to capture dynamic values and pass them between requests.
Correlation is used to handle dynamic values like session IDs, timestamps, etc.
It involves capturing a value from a response and passing it to a subsequent request.
Common correlation techniques include using regular expressions or built-in functions in performance testing tools.
Failure to correlate can lead t
posted on 2 Aug 2024
I was interviewed in Jul 2024.
Jmeter may take more time than browser response time due to network latency, server load, or Jmeter configuration.
Network latency between Jmeter and server can cause delays.
Server load may impact response time for Jmeter.
Jmeter configuration settings like number of threads or ramp-up time can affect performance.
Browser caching may make browser response time faster than Jmeter's.
Complex scripts or heavy load scenarios c
posted on 22 Sep 2024
The best part of working at my last company was the supportive team environment and opportunities for professional growth.
Supportive team environment - colleagues were always willing to help and collaborate
Opportunities for professional growth - company provided training and development programs
Work-life balance - flexible work hours and remote work options
Innovative projects - had the chance to work on cutting-edge te
I applied via Recruitment Consulltant and was interviewed before Nov 2023. There was 1 interview round.
Lr_exit is used to end a Vuser script gracefully, while Lr_abort is used to forcefully terminate a Vuser script.
Lr_exit is used when you want to end the script normally without any errors.
Lr_abort is used when you want to forcefully stop the script execution due to an error or other condition.
Lr_exit allows the script to finish executing any remaining actions before ending.
Lr_abort immediately stops the script without ...
Use lr_trim_string function to remove trailing and leading spaces in Loadrunner
Use lr_trim_string function to remove leading and trailing spaces
Syntax: lr_trim_string("string", "both", " ")
Example: lr_trim_string(" example ", "both", " ") will return "example"
posted on 9 Oct 2023
Load generator in LR simulates virtual users to generate load on the application under test.
Load generator simulates virtual users by sending requests to the application under test.
It helps in generating load on the application to measure performance.
Load generator can be configured to simulate different types of user behaviors and scenarios.
It collects performance metrics and generates reports for analysis.
Examples: J
Throughput is the amount of data transferred successfully from one place to another within a given period of time.
Throughput is a measure of the rate of successful data transfer.
It is usually measured in bits per second (bps) or packets per second (pps).
Higher throughput indicates better performance of the system.
For example, in a network, throughput can be the number of packets successfully delivered from sender to re
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
Associate
93
salaries
| ₹14 L/yr - ₹21 L/yr |
Analyst
55
salaries
| ₹8 L/yr - ₹14 L/yr |
Senior Associate
43
salaries
| ₹15 L/yr - ₹22 L/yr |
Project Lead
42
salaries
| ₹18 L/yr - ₹33 L/yr |
Manager
13
salaries
| ₹30 L/yr - ₹50.1 L/yr |
McKinsey & Company
BCG
Deloitte
Accenture