I applied via Newspaper Ad and was interviewed before Jul 2021. There were 2 interview rounds.
I was interviewed before Jan 2024.
The limit of pile settlement for vertiload testing is typically determined by the project specifications and design requirements.
The limit of pile settlement can vary depending on the type of structure being supported and the soil conditions
Common limits for pile settlement range from 10mm to 25mm
Settlement limits may also be specified in terms of a percentage of the pile diameter
Exceeding the allowable settlement limi...
IRC code for flexible pavement design
IRC: Indian Roads Congress
Flexible pavement design is covered in IRC:37-2012
IRC:37-2012 provides guidelines for design, construction, and maintenance of flexible pavements
Pile shifting limit refers to the maximum allowable movement of piles during construction.
Pile shifting limit is typically specified in the project specifications or design drawings.
Exceeding the pile shifting limit can lead to structural instability and potential failure.
Monitoring equipment such as inclinometers or settlement gauges may be used to track pile movement.
Adjustments to construction methods or pile design...
I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.
Ind AS 116 is a new accounting standard for lease accounting.
Ind AS 116 replaces the previous standard Ind AS 17.
It requires lessees to recognize all leases on their balance sheet.
Lessees must also separate lease components from non-lease components.
It impacts financial statements, ratios, and covenants.
It became effective from April 1, 2019.
Example: A company leasing a building must recognize the lease liability and r
I was interviewed in Jan 2025.
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 28 Sep 2023
Core deployment use case
posted on 11 Jun 2024
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
The covered area of the project is approximately 10,000 square feet.
The covered area includes the indoor space of the project.
It does not include any outdoor space or open areas.
The exact covered area may vary depending on the project.
In this particular project, the covered area is approximately 10,000 square feet.
posted on 9 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
Assistant Manager
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
4
salaries
| ₹0 L/yr - ₹0 L/yr |
General Manager Mines
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Overman
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group