Cube test of concrete is a method to determine the compressive strength of concrete.
Cube test is conducted by casting concrete cubes of standard size and curing them for a specific period.
After the curing period, the cubes are tested in a compression testing machine to measure their strength.
The compressive strength of concrete is determined by dividing the maximum load applied to the cube by its cross-sectional area.
C...
The nominal size of bricks refers to their dimensions as specified by industry standards.
Nominal size is different from actual size as it includes allowances for mortar joints.
Common nominal sizes for bricks are 4 inches by 8 inches by 2 1/4 inches and 3 5/8 inches by 7 5/8 inches by 2 1/4 inches.
Nominal size is important for determining the number of bricks needed for a project and for ensuring proper alignment and sp
Top trending discussions
I applied via Approached by company and was interviewed in Aug 2021. There were 2 interview rounds.
Quant focussed Case Study (be prepared for calculations)
I applied via Company Website and was interviewed before Oct 2020. There was 1 interview round.
I appeared for an interview in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes, which is 2 fishes.
To make the red fishes 98%, subtract 1% (2 fishes) from 99% (198 fishes).
To find the number of fishes to be removed, divide the difference by 1% (2 fishes).
Therefore, 50 fishes have to be removed to make the red fishes 98%.
I appeared for an interview in Feb 2017.
I appeared for an interview in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes to find the number of red fishes.
Subtract the number of red fishes from 200 to find the number of non-red fishes.
Calculate 2% of the total number of fishes to find the desired number of red fishes.
Subtract the desired number of red fishes from the current number of red fishes to find the number of fishes to be removed.
based on 1 interview
Interview experience
based on 13 reviews
Rating in categories
Civil Site Engineer
6
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
HR Executive
4
salaries
| ₹2.9 L/yr - ₹5.2 L/yr |
Accounts Manager
4
salaries
| ₹6 L/yr - ₹10.4 L/yr |
Civil Engineer
4
salaries
| ₹3.3 L/yr - ₹4 L/yr |
Safety Officer
4
salaries
| ₹4 L/yr - ₹5.2 L/yr |
Huawei Technologies
Z X Learning
Cogoport
Lea Associates South Asia