Avaada Power
Evergreen Marine Corporation Interview Questions and Answers
Q1. ACB all string proper floting check.
The question is unclear and lacks context.
Please provide more information or clarify the question.
ACB could refer to anything and it is unclear what is being asked.
Without more context, it is impossible to provide a meaningful answer.
Q2. 1)what is the minimum steel dia in column.
The minimum steel diameter in a column depends on various factors such as load, height, and design requirements.
The minimum steel diameter in a column is determined by the structural engineer based on the load-bearing capacity required.
Factors such as the height of the column, type of construction, and design requirements also influence the minimum steel diameter.
The minimum steel diameter ensures the column can withstand the applied loads and maintain structural integrity.
Fo...read more
Q3. Inverter to tranformar
Inverter and transformer are two different electrical devices used for different purposes.
An inverter is used to convert DC power to AC power.
A transformer is used to change the voltage level of AC power.
Inverters are commonly used in solar power systems to convert DC power from solar panels to AC power for use in homes.
Transformers are used in power distribution systems to step up or step down the voltage level as needed.
Inverters are also used in air conditioning units to c...read more
Q4. What is best for on time execution
Effective planning, clear communication, efficient resource allocation, and proactive risk management are key to on-time execution.
Develop a detailed project plan with clear timelines and milestones
Communicate regularly with all stakeholders to ensure everyone is on the same page
Allocate resources effectively to ensure tasks are completed on time
Identify potential risks and develop contingency plans to mitigate them
Regularly monitor progress and adjust plans as necessary
Use p...read more
Q5. How to maintain quality
Maintaining quality requires a systematic approach and continuous improvement.
Establish clear quality standards and communicate them to all stakeholders.
Implement quality control measures to ensure compliance with standards.
Regularly review and analyze quality data to identify areas for improvement.
Provide training and resources to employees to support quality efforts.
Encourage a culture of continuous improvement and innovation.
Collaborate with suppliers and partners to ensur...read more
Q6. How muchCement grade
The cement grade required for a civil supervisor depends on the specific project requirements.
The cement grade is determined based on factors such as the type of construction, environmental conditions, and strength requirements.
Common cement grades include OPC (Ordinary Portland Cement), PPC (Portland Pozzolana Cement), and PSC (Portland Slag Cement).
For high-strength applications, higher-grade cements like OPC 53 are used.
In some cases, specialized cements like sulfate-resis...read more
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month