Inverter and transformer are two different electrical devices used for different purposes.
An inverter is used to convert DC power to AC power.
A transformer is used to change the voltage level of AC power.
Inverters are commonly used in solar power systems to convert DC power from solar panels to AC power for use in homes.
Transformers are used in power distribution systems to step up or step down the voltage level as nee...
The question is unclear and lacks context.
Please provide more information or clarify the question.
ACB could refer to anything and it is unclear what is being asked.
Without more context, it is impossible to provide a meaningful answer.
Optimize moisture content refers to adjusting the amount of moisture in a material to achieve the desired properties.
Optimizing moisture content involves finding the right balance to enhance the quality and performance of a material.
It is important in industries like agriculture, food processing, and construction.
For example, in agriculture, optimizing moisture content in soil can improve crop growth and yield.
Types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.
Portland cement is the most common type used in construction.
White cement is used for architectural purposes and to create colored concrete.
Rapid hardening cement sets quickly and is used in projects with tight deadlines.
Low heat cement generates less heat during hydration and is used in large concrete structures.
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
The manufacturing process of the printing line involves various steps to produce printed materials efficiently.
Designing the layout of the printing line
Selecting the appropriate printing technology (e.g. offset, digital, flexography)
Calibrating and setting up the printing equipment
Testing the printing quality and making adjustments as needed
Implementing quality control measures throughout the process
I applied via Referral and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
The parts of an inverter include DC input, power transistors, transformer, output filter, and control circuit.
DC input: where the direct current is supplied to the inverter
Power transistors: responsible for converting DC to AC
Transformer: used to step up or step down the voltage
Output filter: smoothens the output waveform
Control circuit: manages the operation of the inverter
The formula for radiation of the day is based on the Stefan-Boltzmann law, which states that the total energy radiated per unit surface area of a black body is directly proportional to the fourth power of the body's absolute temperature.
Radiation of the day is calculated using the Stefan-Boltzmann law: P = σAT^4
P represents the power radiated per unit area, σ is the Stefan-Boltzmann constant, A is the surface area, and...
Challenges faced in previous plant and how they were overcome
One challenge was outdated equipment causing frequent breakdowns
Implemented a preventive maintenance schedule to address the issue
Another challenge was lack of skilled manpower
Conducted training programs and hired experienced technicians
Difficulty in meeting production targets due to inefficiencies
Implemented lean manufacturing principles to streamline proces
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
I appeared for an interview in Sep 2024, where I was asked the following questions.
Materials inventory refers to the stock of raw materials, components, and finished goods used in production.
Includes raw materials like steel, plastic, and chemicals used in manufacturing.
Comprises components such as circuit boards or subassemblies for electronics.
Encompasses finished goods ready for sale, like packaged food or clothing.
Essential for production planning and ensuring timely delivery of products.
Helps in...
I applied via Referral and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
Overhauling procedure of turbine and generator involves disassembly, inspection, repair, and reassembly.
Disassemble turbine and generator components
Inspect components for wear and damage
Repair or replace damaged components
Reassemble components and test for proper function
I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.
based on 1 review
Rating in categories
Civil Engineer
19
salaries
| ₹3 L/yr - ₹5 L/yr |
Assistant Manager
19
salaries
| ₹6 L/yr - ₹10 L/yr |
Senior Engineer
14
salaries
| ₹4.6 L/yr - ₹8 L/yr |
Deputy Manager
9
salaries
| ₹7.7 L/yr - ₹15.5 L/yr |
Manager
9
salaries
| ₹9 L/yr - ₹17 L/yr |