i
Auxein Medical
Filter interviews by
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2020.Ā There was 1 interview round.
I applied via Campus Placement and was interviewed in Jun 2019.Ā There were 4 interview rounds.
Speed can be controlled by adjusting the pressure of the fluid or gas that powers the system.
Pressure can be increased or decreased to control the speed of a system.
This is commonly used in hydraulic and pneumatic systems.
For example, in a hydraulic system, increasing the pressure of the fluid can increase the speed of a cylinder.
Similarly, in a pneumatic system, increasing the pressure of the gas can increase the spee...
Hydraulic refers to the use of fluids to transmit power or energy.
Hydraulic systems use liquids such as oil or water to transmit power.
Examples include hydraulic brakes in cars and hydraulic lifts in buildings.
Failure can occur due to leaks, blockages, or mechanical issues.
Regular maintenance and inspection can prevent failure and ensure proper functioning.
PLC stands for Programmable Logic Controller. It is a digital computer used for automation of electromechanical processes.
PLC is used to control and monitor industrial processes.
It is programmed using ladder logic or other programming languages.
PLC can be used for various applications such as controlling traffic lights, assembly lines, and HVAC systems.
It can communicate with other devices and systems through various c...
I applied via Walk-in and was interviewed in Jan 2023.Ā There were 2 interview rounds.
posted on 27 Aug 2021
Can you work in under pressure
Process control is the use of techniques and technologies to control and monitor a production process.
Process control involves monitoring and adjusting variables in a production process to ensure quality and efficiency.
PLC (Programmable Logic Controller) is a type of industrial control system that uses logic-based programming to automate processes.
SCADA (Supervisory Control and Data Acquisition) is a system that collec...
I applied via Recruitment Consultant and was interviewed before Jul 2020.Ā There were 5 interview rounds.
I applied via Referral and was interviewed in Jun 2019.Ā There were 3 interview rounds.
I worked as a QA Engineer in my previous company.
Performed manual and automated testing of software applications
Created and executed test cases and test plans
Identified and reported software defects
Collaborated with development team to resolve issues
Participated in requirement analysis and design reviews
Defects on line can be solved by identifying the root cause, implementing corrective actions, and conducting thorough testing.
Identify the root cause of the defect
Implement corrective actions to fix the issue
Conduct thorough testing to ensure the defect has been resolved
Document the defect and the steps taken to resolve it for future reference
I listen to their complaint, apologize for the inconvenience caused, and work towards finding a solution to their problem.
Listen attentively to the customer's complaint
Apologize for the inconvenience caused
Ask questions to understand the issue better
Offer a solution or escalate the issue to the appropriate team
Follow up with the customer to ensure their issue has been resolved
Address the issue with the vendor company by following a structured approach.
Identify the root cause of the poor quality
Communicate the issue to the vendor company in a professional manner
Provide evidence to support your claim
Work with the vendor company to come up with a solution
Set clear expectations for future quality standards
Yes, I am aware of Microsoft Excel and PowerPoint presentation.
I have experience in using Microsoft Excel for data analysis and management.
I have created and delivered presentations using Microsoft PowerPoint.
I am familiar with the various features and functions of both applications.
As a QA Engineer, my work involves testing software applications, identifying bugs and issues, creating test cases, and ensuring the quality and functionality of the product.
Testing software applications for functionality, usability, and performance.
Identifying and documenting bugs and issues.
Creating and executing test cases and test plans.
Collaborating with developers and stakeholders to resolve issues.
Performing reg...
As a QA Engineer, I have experience handling various measuring instruments such as calipers, micrometers, gauges, and rulers.
Calipers
Micrometers
Gauges
Rulers
I am a QA Engineer with experience in testing software applications and ensuring their quality.
Experienced QA Engineer
Skilled in testing software applications
Ensuring quality of software
Knowledge of testing methodologies and tools
Strong attention to detail
Ability to identify and report bugs
Experience in creating and executing test cases
Collaborating with development teams
Continuous learning and improvement
I have implemented various types of kaizen such as process improvement, waste reduction, and standardization.
Implemented process improvement kaizen to reduce defects in the testing process
Implemented waste reduction kaizen to reduce the time taken for test execution
Implemented standardization kaizen to ensure consistency in testing across different projects
Used value stream mapping to identify areas of improvement and ...
I applied via Referral and was interviewed before Sep 2021.Ā There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Oct 2020.Ā There was 1 interview round.
Test output of a graphic card
Check for resolution and refresh rate
Test different graphic-intensive applications
Check for artifacts or distortion in the output
Test with different cables and monitors
Benchmark the performance using software tools
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Design Engineer
19
salaries
| ā¹3.2 L/yr - ā¹5.8 L/yr |
Quality Engineer
19
salaries
| ā¹2.4 L/yr - ā¹3.6 L/yr |
Mechanical Engg. Design
6
salaries
| ā¹6.5 L/yr - ā¹7.5 L/yr |
VMC Operator
6
salaries
| ā¹1.7 L/yr - ā¹3 L/yr |
NPD Engineer
5
salaries
| ā¹6.3 L/yr - ā¹7.8 L/yr |
Hollister Medical
Appasamy Associates
Illusion Dental Laboratory
Dynamic Techno Medicals