i
Atlas Copco
Filter interviews by
Be the first one to contribute and help others!
I applied via Referral
I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2022. There were 4 interview rounds.
Operational difficulties in logistics flow include transportation delays, inventory management, and communication breakdowns.
Transportation delays due to traffic, weather, or mechanical issues can disrupt the flow of goods.
Inventory management challenges include stockouts, overstocking, and inaccurate tracking.
Communication breakdowns between different parties involved in the logistics process can lead to delays and er...
Implemented Kaizen principles to improve material flow for efficient production
Conducted value stream mapping to identify bottlenecks
Implemented visual management tools such as kanban to improve material flow
Standardized work processes to reduce variability and improve efficiency
Trained team members on Kaizen principles and encouraged continuous improvement
Reduced lead time for production orders by 20% through Kaizen i
Cost optimization through process improvements
I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.
I was given a case study
I appeared for an interview in Dec 2020.
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
based on 6 reviews
Rating in categories
Design Engineer
293
salaries
| ₹2.8 L/yr - ₹12 L/yr |
Senior Design Engineer
205
salaries
| ₹5.8 L/yr - ₹15.5 L/yr |
Service Engineer
191
salaries
| ₹1.8 L/yr - ₹9 L/yr |
Project Engineer
183
salaries
| ₹6 L/yr - ₹15.7 L/yr |
Senior Service Engineer
102
salaries
| ₹4.5 L/yr - ₹14 L/yr |
John Deere
Cummins
ABB
Tractors and Farm Equipment