Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Atlas Copco Team. If you also belong to the team, you can get access from here

Atlas Copco Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Atlas Copco Field Engineer Interview Questions, Process, and Tips

Updated 16 Aug 2024

Atlas Copco Field Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Explain the working of Air compressor?
  • Ans. 

    Air compressor works by compressing air to increase its pressure, which can then be used for various applications.

    • Air is drawn into the compressor through an intake valve.

    • The air is then compressed using a piston or rotating impeller.

    • The compressed air is stored in a tank or released directly for use.

    • The compressed air can be used for powering pneumatic tools, inflating tires, and more.

  • Answered by AI
  • Q2. How to troubleshoot over heating issue ?
  • Ans. 

    To troubleshoot overheating issue, check for dust buildup, ensure proper ventilation, monitor CPU usage, and consider upgrading cooling system.

    • Check for dust buildup in the computer's fans and vents

    • Ensure proper ventilation around the computer

    • Monitor CPU usage to identify any processes causing excessive heat

    • Consider upgrading the cooling system with better fans or a liquid cooling system

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. How to overhaul oil stop check valve?
  • Ans. 

    To overhaul an oil stop check valve, follow these steps:

    • 1. Shut off the oil supply and relieve any pressure in the system.

    • 2. Remove the valve from the pipeline using appropriate tools.

    • 3. Disassemble the valve carefully, noting the position of each component.

    • 4. Clean all parts thoroughly to remove any debris or buildup.

    • 5. Inspect all components for wear or damage and replace any faulty parts.

    • 6. Reassemble the valve in t...

  • Answered by AI
  • Q2. How to identify a worn screw element ?
  • Ans. 

    A worn screw element can be identified by examining for signs of wear and tear, such as chipping, cracking, or deformation.

    • Inspect the screw element for any visible signs of chipping or cracking

    • Check for any deformation or warping of the screw element

    • Look for excessive wear on the threads of the screw element

    • Listen for any unusual noises during operation, which may indicate a worn screw element

    • Monitor the performance o...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident. Read on Air Compressor's and basics of mechanical engineering.

Overall knowledge on HVAC & Refrigeration is helpful to Crack the interview.

Rate your
company

🤫 100% anonymous

How was your last interview experience?

Share interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About mines, competitors
  • Q2. Drawing stds, EV

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through the welding stds

I applied via Campus Placement and was interviewed before Jun 2020. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Explain the use of GD&T
  • Ans. 

    GD&T is a system of symbols and standards used to communicate engineering design and manufacturing requirements.

    • GD&T stands for Geometric Dimensioning and Tolerancing

    • It is used to define the allowable variation in form, size, orientation, and location of features on a part

    • It ensures that parts are manufactured to the correct specifications and fit together properly

    • GD&T symbols include straightness, flatness, circularit...

  • Answered by AI
  • Q2. Weldeability criterias
  • Q3. Maching and moulding process

Interview Preparation Tips

Interview preparation tips for other job seekers - overall good

Skills evaluated in this interview

Interview Questionnaire 

4 Questions

  • Q1. Instrumentation Basics
  • Q2.  DCS Architecture for various Projects handled in my career
  • Ans. 

    I have worked on various DCS architectures in my career, including those for chemical plants and power plants.

    • Designed and implemented DCS architecture for a chemical plant project

    • Developed DCS architecture for a power plant project

    • Worked on DCS architecture for a water treatment plant project

    • Collaborated with team to create DCS architecture for a pharmaceutical plant project

  • Answered by AI
  • Q3. Boiler Process and Logic Configurations
  • Q4. Package Negotiation

Interview Preparation Tips

Round: Resume Shortlist
Experience: DCS and Industrial Automation

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is Profibus?
  • Ans. 

    Profibus is a widely used fieldbus communication protocol in industrial automation.

    • Profibus stands for Process Field Bus.

    • It is used for communication between field devices and control systems in industrial automation.

    • There are two main types of Profibus: Profibus DP (Decentralized Peripherals) and Profibus PA (Process Automation).

    • Profibus uses a master-slave communication model.

    • It is known for its high-speed data trans...

  • Answered by AI
  • Q2. How to troubleshoot Profibus
  • Ans. 

    Troubleshooting Profibus involves checking physical connections, network configuration, and device settings.

    • Check physical connections to ensure cables are properly connected and not damaged.

    • Verify network configuration settings such as baud rate, parity, and address assignments.

    • Inspect device settings to ensure they match the network configuration and are functioning correctly.

    • Use diagnostic tools like Profibus analyz...

  • Answered by AI

Project Engineer Interview Questions & Answers

ABB user image Siddharth Singh

posted on 3 Sep 2023

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. What is the control valve and operation
  • Ans. 

    A control valve is a device used to regulate the flow of a fluid in a system by varying the size of the flow passage.

    • Control valves are commonly used in industries such as oil and gas, chemical, and power plants.

    • They can be operated manually, pneumatically, electrically, or through a combination of these methods.

    • The operation of a control valve involves adjusting the position of the valve plug or disc to control the fl...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary expectations
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Cable Length for PA cables and their diameter.
  • Ans. 

    The cable length for PA cables varies depending on the specific application, while the diameter is typically determined by the current carrying capacity and voltage requirements.

    • Cable length for PA cables can range from a few meters to several hundred meters, depending on the distance between the PA system and the speakers.

    • The diameter of PA cables is usually determined by the current carrying capacity and voltage requ...

  • Answered by AI
  • Q2. Type of smoke detectors.
  • Ans. 

    There are two main types of smoke detectors: ionization and photoelectric.

    • Ionization smoke detectors use a small amount of radioactive material to ionize the air and detect smoke particles.

    • Photoelectric smoke detectors use a light beam to detect smoke particles in the air.

    • Dual sensor smoke detectors combine both ionization and photoelectric technologies for more comprehensive detection.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectations
  • Q2. Openness for work from the office
  • Ans. 

    I am open to working from the office as needed for collaboration and team communication.

    • I believe in the importance of face-to-face interactions for effective communication and teamwork

    • I am flexible and willing to work from the office when required for project meetings or discussions

    • I understand the benefits of being physically present in the office for certain tasks or projects

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell about yourself
  • Q2. Current work experience
Round 2 - Case Study 

Good experience in interview

I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All aboutElectrical distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is purely based on electrical basics and they asked questions only from your resume please prepare your resume clearly
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(11 Questions)

  • Q1. Introduce yourself briefly?
  • Ans. 

    I am a highly skilled and experienced Project Engineer with a strong background in managing complex engineering projects.

    • Over 10 years of experience in project management and engineering

    • Proficient in utilizing project management software and tools

    • Strong leadership and communication skills

    • Proven track record of successfully delivering projects on time and within budget

    • Experience in coordinating with cross-functional tea...

  • Answered by AI
  • Q2. What projects you have done in previous company
  • Ans. 

    I have worked on various projects in my previous company, including the construction of a new office building and the implementation of a software system for project management.

    • Construction of a new office building

    • Implementation of a software system for project management

  • Answered by AI
  • Q3. What is lifecycle of project
  • Ans. 

    The lifecycle of a project refers to the stages it goes through from initiation to closure.

    • Initiation: project is defined and approved

    • Planning: project objectives, scope, and resources are determined

    • Execution: project plan is put into action

    • Monitoring and Control: project progress is tracked and necessary adjustments are made

    • Closure: project is completed and evaluated

    • Examples: construction of a building, development of...

  • Answered by AI
  • Q4. What are the industrial communication protocols
  • Ans. 

    Industrial communication protocols are standards for data exchange between devices in industrial automation and control systems.

    • Some common industrial communication protocols include Modbus, Profibus, DeviceNet, Ethernet/IP, and CANopen.

    • These protocols enable devices from different manufacturers to communicate with each other and exchange data.

    • Industrial communication protocols can be wired or wireless, and can operate...

  • Answered by AI
  • Q5. What are the settings required in MODBUS
  • Ans. 

    MODBUS settings include baud rate, parity, data bits, stop bits, and slave address.

    • Baud rate determines the speed of communication between devices.

    • Parity is used for error checking and can be set to even, odd, or none.

    • Data bits determine the number of bits used to represent each character.

    • Stop bits indicate the end of a character and can be set to 1 or 2.

    • Slave address is used to identify the device on the network.

    • Examp...

  • Answered by AI
  • Q6. Maximum speed in modbus
  • Ans. 

    The maximum speed in Modbus depends on the baud rate and cable length.

    • Modbus speed is measured in baud rate

    • Higher baud rates allow for faster data transfer

    • Cable length can also affect the maximum speed

    • For example, at 9600 baud rate, the maximum cable length is 1200 meters

  • Answered by AI
  • Q7. How many device add in modbus
  • Ans. 

    The number of devices that can be added in Modbus depends on the network architecture and the number of available addresses.

    • The maximum number of devices that can be added to a Modbus network is 247.

    • The number of available addresses depends on the type of Modbus protocol used (RTU or TCP/IP).

    • The network architecture also plays a role in determining the number of devices that can be added.

    • It is important to ensure that ...

  • Answered by AI
  • Q8. Types of modbus communication
  • Ans. 

    Modbus communication types include RTU, ASCII, and TCP/IP.

    • RTU (Remote Terminal Unit) is a serial communication protocol that uses binary code to transmit data.

    • ASCII (American Standard Code for Information Interchange) is a serial communication protocol that uses ASCII characters to transmit data.

    • TCP/IP (Transmission Control Protocol/Internet Protocol) is a network communication protocol that uses Ethernet to transmit d...

  • Answered by AI
  • Q9. On which scada you are worked
  • Ans. 

    I have worked on multiple SCADA systems including Wonderware, Ignition, and Inductive Automation.

    • I have experience with configuring and programming SCADA systems

    • I have worked with Wonderware, Ignition, and Inductive Automation

    • I am familiar with creating HMI screens, alarms, and trends

    • I have experience with PLC communication and data acquisition

    • I have worked on projects in various industries including manufacturing and

  • Answered by AI
  • Q10. What is maximum Input output handle
  • Ans. 

    The maximum input output handle refers to the maximum number of inputs and outputs that a device can handle.

    • The maximum input output handle varies depending on the device and its specifications.

    • It is important to consider the maximum input output handle when selecting a device for a project.

    • For example, a PLC may have a maximum input output handle of 256 inputs and 256 outputs.

    • Another example is a microcontroller with ...

  • Answered by AI
  • Q11. How many pages designed in HMI
  • Ans. 

    The number of pages designed in HMI depends on the project requirements and complexity.

    • The number of pages can range from a few to hundreds depending on the project scope.

    • The complexity of the HMI design and functionality also affects the number of pages.

    • Factors such as user interface, data visualization, and system integration can impact the number of pages.

    • It is important to prioritize user experience and ease of nav

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Currently they having vacancy for project engineer who is having experience of process automation in oil and gas field,chemical.

Skills evaluated in this interview

Contribute & help others!
anonymous
You can choose to be anonymous

Atlas Copco Interview FAQs

How many rounds are there in Atlas Copco Field Engineer interview?
Atlas Copco interview process usually has 2 rounds. The most common rounds in the Atlas Copco interview process are HR and Technical.
What are the top questions asked in Atlas Copco Field Engineer interview?

Some of the top questions asked at the Atlas Copco Field Engineer interview -

  1. How to troubleshoot over heating issu...read more
  2. How to overhaul oil stop check val...read more
  3. How to identify a worn screw elemen...read more

Recently Viewed

JOBS

Browse jobs

Discover jobs you love

COMPANY BENEFITS

KNR Constructions

20 benefits

COMPANY BENEFITS

IRB Infrastructure

60 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

SALARIES

Kirloskar Brothers

SALARIES

Kirloskar Brothers

SALARIES

Kirloskar Brothers

JOBS

Idc Engineering

No Jobs

JOBS

Caterpillar Inc

No Jobs

Tell us how to improve this page.

Atlas Copco Field Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Anonymously discuss salaries, work culture, and many more

Get Ambitionbox App

Interview Questions from Similar Companies

ABB Interview Questions
4.1
 • 235 Interviews
Cummins Interview Questions
4.3
 • 231 Interviews
John Deere Interview Questions
4.1
 • 229 Interviews
Caterpillar Inc Interview Questions
4.3
 • 176 Interviews
KONE Interview Questions
4.1
 • 101 Interviews
Hitachi Interview Questions
4.0
 • 81 Interviews
TechnipFMC Interview Questions
4.0
 • 70 Interviews
Metso Interview Questions
4.2
 • 65 Interviews
TÜV SÜD Interview Questions
3.9
 • 63 Interviews
View all

Atlas Copco Field Engineer Reviews and Ratings

based on 2 reviews

4.7/5

Rating in categories

5.0

Skill development

4.2

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

4.7

Promotions

3.8

Work satisfaction

Explore 2 Reviews and Ratings
Design Engineer
291 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Service Engineer
231 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
169 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Design Engineer
168 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Service Engineer
97 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Atlas Copco with

Ingersoll Rand

4.0
Compare

Sandvik Asia

4.3
Compare

Caterpillar Inc

4.3
Compare

Epiroc

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview