Minimum tests for piling include integrity testing, load testing, and pile driving analyzer (PDA) testing.
Integrity testing is done to ensure that the pile is free from defects and damage.
Load testing is done to determine the load capacity of the pile.
Pile driving analyzer (PDA) testing is done to measure the stresses and strains in the pile during driving.
Other tests may include crosshole sonic logging (CSL) and therm