Filter interviews by
I appeared for an interview before Jun 2023.
Top trending discussions
I applied via Naukri.com and was interviewed before Oct 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2021. There were 3 interview rounds.
About aKRA & KPI
I applied via Company Website and was interviewed in Dec 2020. There was 1 interview round.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
posted on 12 May 2021
I applied via Naukri.com and was interviewed before Oct 2020. There were 7 interview rounds.
Paint Shop process involves preparing, painting, and curing the surface of a product.
The surface is first cleaned and prepared for painting
A primer is applied to improve adhesion and corrosion resistance
The topcoat is applied in multiple layers for desired color and finish
The painted surface is then cured in an oven or air-dried
Quality checks are performed throughout the process to ensure consistency and durability
I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.
My future plans include advancing my skills and knowledge in production management, taking on more responsibilities, and eventually moving into a higher leadership role.
Continuing to learn and stay updated on the latest production techniques and technologies
Seeking opportunities for professional development and training
Taking on additional responsibilities and challenges to further develop my leadership skills
Working t...
The key components required for building a product include design, materials, manufacturing processes, quality control, and packaging.
Design: A well-thought-out design is essential for creating a functional and aesthetically pleasing product.
Materials: The selection of appropriate materials is crucial for the product's performance, durability, and cost-effectiveness.
Manufacturing processes: The production supervisor mu...
Seeking new opportunities for growth and advancement.
Looking for a new challenge
Seeking career progression
Wanting to broaden my skillset
Exploring new industries or sectors
Relocating to a different area
Company downsizing or restructuring
Yes, a lathe machine consists of several parts that work together to shape and cut materials.
The bed: the base of the machine that supports all the other components
The headstock: holds the spindle and chuck, which rotate the workpiece
The tailstock: supports the other end of the workpiece and can be adjusted for length
The carriage: moves along the bed and holds the cutting tool
The cutting tool: removes material from the...
posted on 11 Mar 2024
posted on 14 Feb 2025
I appeared for an interview before Feb 2024.
Implementing lean manufacturing principles can help reduce cycle time and setup time.
Implementing Single Minute Exchange of Die (SMED) techniques to reduce setup time
Optimizing production flow to minimize waiting time and bottlenecks
Utilizing automation and technology to streamline processes
Training employees on efficient work practices and continuous improvement
Regularly reviewing and analyzing production data to iden
based on 1 interview
Interview experience
Depot Incharge
11
salaries
| ₹2 L/yr - ₹2.6 L/yr |
Senior Accountant
9
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Assistant Manager
5
salaries
| ₹4 L/yr - ₹5.9 L/yr |
Accountant
5
salaries
| ₹2.5 L/yr - ₹4.3 L/yr |
Teritory Sales Officer
5
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Dhoot Transmission
Amphenol Interconnect
Microtek International
Prama Hikvision India