Filter interviews by
Preparing for an audit involves planning, documentation, and team coordination to ensure compliance and readiness.
Review relevant standards and regulations to ensure compliance, e.g., ISO 9001.
Conduct a pre-audit assessment to identify potential gaps in processes.
Gather and organize necessary documentation, such as quality manuals and records.
Train team members on audit procedures and expectations to ensure prepar...
I switched because I was looking for new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Desire for a change in environment or industry
Wanted to learn new skills or gain different experiences
Profile travel time is decided in different zones of reflow/wave soldering process to ensure proper heating and cooling for components.
Profile travel time is crucial for achieving proper soldering results.
Different zones in the process have different temperature requirements.
Travel time is adjusted to allow components to heat up and cool down gradually.
Proper profile travel time helps prevent defects like cold joi...
There are 7 types of losses in production.
The 7 types of losses are: overproduction, waiting, transportation, processing, motion, inventory, and defects.
Overproduction is producing more than what is needed.
Waiting is the time spent waiting for the next step in the production process.
Transportation is the movement of goods or materials between processes.
Processing is the time spent on actual production.
Motion is th...
Skill matrix is a tool used to assess and track the skills and competencies of employees within an organization.
It helps identify skill gaps and training needs
It can be used for performance evaluations and career development
It provides a visual representation of the skills and knowledge within a team or department
Examples of skills tracked include technical skills, soft skills, and leadership abilities
Kazen is a term used in engineering to refer to a type of material or substance.
Kazen can be a specific type of metal, plastic, or composite material used in various engineering applications.
It is important to understand the properties and characteristics of kazen in order to select the appropriate material for a given project.
Examples of kazen include steel, aluminum, carbon fiber, and polyethylene.
Kazen can have...
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There were 2 interview rounds.
I switched because I was looking for new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Desire for a change in environment or industry
Wanted to learn new skills or gain different experiences
I appeared for an interview in May 2025, where I was asked the following questions.
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.
There are 7 types of losses in production.
The 7 types of losses are: overproduction, waiting, transportation, processing, motion, inventory, and defects.
Overproduction is producing more than what is needed.
Waiting is the time spent waiting for the next step in the production process.
Transportation is the movement of goods or materials between processes.
Processing is the time spent on actual production.
Motion is the tim...
Preparing for an audit involves planning, documentation, and team coordination to ensure compliance and readiness.
Review relevant standards and regulations to ensure compliance, e.g., ISO 9001.
Conduct a pre-audit assessment to identify potential gaps in processes.
Gather and organize necessary documentation, such as quality manuals and records.
Train team members on audit procedures and expectations to ensure preparednes...
I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.
I appeared for an interview before Feb 2024.
posted on 17 Dec 2023
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Apr 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Mar 2023. There were 2 interview rounds.
Profile travel time is decided in different zones of reflow/wave soldering process to ensure proper heating and cooling for components.
Profile travel time is crucial for achieving proper soldering results.
Different zones in the process have different temperature requirements.
Travel time is adjusted to allow components to heat up and cool down gradually.
Proper profile travel time helps prevent defects like cold joints o...
Top trending discussions
The duration of Asti Electronics India interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 24 interview experiences
Difficulty level
Duration
based on 310 reviews
Rating in categories
Junior Engineer
139
salaries
| ₹1.7 L/yr - ₹3.6 L/yr |
Assistant Engineer
106
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Engineer
72
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Production Engineer
48
salaries
| ₹2 L/yr - ₹5.3 L/yr |
Assistant Manager
47
salaries
| ₹6 L/yr - ₹12 L/yr |
ZF Steering Gear
Ag Industries
Caparo Engineering India
Shivam Autotech