i
ArcelorMittal Nippon Steel
Filter interviews by
Safety components in job execution ensure a secure work environment, minimizing risks and protecting personnel and assets.
Personal Protective Equipment (PPE): Helmets, gloves, and goggles to protect workers from physical hazards.
Safety Training: Regular training sessions to educate employees on safety protocols and emergency procedures.
Risk Assessment: Identifying potential hazards before starting a job to implement ne...
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.
Barring checking and replacement work
To make a pile, drive the pile into the ground at a specific angle to ensure stability and load-bearing capacity.
Choose the appropriate type and size of pile for the specific project requirements.
Use a pile driver or hydraulic hammer to drive the pile into the ground at the desired angle.
Ensure the pile is driven to the required depth to achieve the necessary load-bearing capacity.
Check the alignment and verticality of...
The condition of the yard is well-maintained and there is availability of a 15 meter height for storage or construction purposes.
The yard is regularly maintained to ensure cleanliness and safety
There is ample space for storage or construction activities with a height of 15 meters
Proper safety measures are in place to prevent accidents or injuries
Regular inspections are conducted to ensure compliance with regulations
ArcelorMittal Nippon Steel interview questions for designations
LOTO stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again prior to the completion of maintenance or servicing work.
LOTO is a safety procedure used to prevent accidents during maintenance or servicing of machines.
It involves locking the machine in the off position and tagging it to indicate that it should not be operated.
Only authorized perso...
One safety topic of your choice.
Get interview-ready with Top ArcelorMittal Nippon Steel Interview Questions
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
Key aspects of Procurement Manager include strategic sourcing, supplier relationship management, contract negotiation, and cost reduction.
Developing and implementing procurement strategies to optimize costs and quality
Managing supplier relationships to ensure timely delivery and quality products/services
Negotiating contracts with vendors to secure favorable terms and pricing
Identifying cost-saving opportunities through
I applied via LinkedIn and was interviewed before Jul 2023. There were 2 interview rounds.
The impact of automation on warehouse efficiency," "Optimizing ergonomics in material handling operations," "Safety protocols for forklift operations.
Material pile height refers to the vertical measurement of stacked materials, crucial for storage and safety in various industries.
Material pile height is essential for optimizing storage space in warehouses.
Excessive pile height can lead to safety hazards, such as collapse.
For example, in construction, the height of stacked bricks must be regulated.
Different materials have different safe pile heights; for instance, lo...
Effective strategies to address and reduce stacking time issues in operations.
Identify bottlenecks: Analyze the workflow to find where delays occur, such as slow equipment or processes.
Implement lean principles: Streamline operations by eliminating waste and optimizing resource use, like reducing unnecessary steps in a process.
Enhance communication: Foster clear communication among team members to ensure everyone is aw...
To mitigate incidents from previous plants, I would analyze, implement safety measures, and train staff effectively.
Conduct a thorough incident analysis to identify root causes.
Implement corrective actions based on findings, such as upgrading equipment.
Enhance safety protocols and standard operating procedures.
Provide comprehensive training for staff on new safety measures.
Establish a regular review process to monitor
I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 4 interview rounds.
Implemented a new inventory management system resulting in significant cost savings.
Implemented a new inventory management system
Reduced inventory holding costs by optimizing stock levels
Negotiated better pricing with suppliers
Identified and eliminated unnecessary expenses
Streamlined processes to improve efficiency and reduce costs
OEE stands for Overall Equipment Efficiency and is a measure of how effectively a machine is utilized in terms of availability, performance, and quality.
OEE is a key performance indicator used in manufacturing to assess the productivity and efficiency of a machine.
It takes into account three factors: availability, performance, and quality.
Availability measures the percentage of time the machine is available for product...
HIRA at shopfloor stands for Hazard Identification and Risk Assessment.
HIRA is a systematic process used to identify potential hazards and assess the associated risks in a shopfloor environment.
It involves identifying hazards, evaluating their potential consequences, and determining the likelihood of those consequences occurring.
The purpose of HIRA is to prevent accidents, injuries, and damage to property by implementi...
IATF and ISO are international standards for quality management systems.
IATF stands for International Automotive Task Force and is a standard specifically for the automotive industry.
ISO stands for International Organization for Standardization and is a generic standard applicable to various industries.
Both standards focus on establishing and maintaining effective quality management systems.
They provide guidelines and ...
I applied via Recruitment Consulltant
I applied via Campus Placement and was interviewed before Mar 2023. There were 3 interview rounds.
Same as in every company
They have given a topic of infrastructure role on economy
Iron carbon diagram is a graphical representation of the phases of iron and carbon at different temperatures.
Shows the phases of iron and carbon at different temperatures
Includes regions for austenite, ferrite, cementite, and pearlite
Helps in understanding the microstructure of steel
Top trending discussions
Some of the top questions asked at the ArcelorMittal Nippon Steel Deputy Manager interview for experienced candidates -
based on 10 interviews
3 Interview rounds
based on 164 reviews
Rating in categories
Deputy Manager
736
salaries
| ₹4.5 L/yr - ₹16 L/yr |
Assistant Manager
592
salaries
| ₹3 L/yr - ₹11.6 L/yr |
Manager
516
salaries
| ₹6 L/yr - ₹22 L/yr |
Assistant Field Engineer
397
salaries
| ₹1.8 L/yr - ₹5.2 L/yr |
Engineer
363
salaries
| ₹2.4 L/yr - ₹7.6 L/yr |
Tata Steel
JSW Steel
Jindal Steel and Power
Jindal Stainless