Filter interviews by
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
Top trending discussions
posted on 15 Jan 2023
I applied via Naukri.com and was interviewed in Dec 2022. There were 4 interview rounds.
1. Number series
2. Coding and decoding
3. Find the odd one out
4. Statement and conclusion
posted on 14 Jan 2025
I was interviewed in Dec 2024.
posted on 22 Apr 2024
Core related questions
Detailed analysis on given topic is done
posted on 22 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
I was interviewed before Sep 2022.
Production is the process of creating goods and services using resources like labor, machinery, and materials.
Production involves converting raw materials into finished products.
It includes activities such as manufacturing, assembling, packaging, and quality control.
Efficient production processes can lead to cost savings and increased output.
Examples of production include car manufacturing, food processing, and clothin
Production efficiency can be determined by analyzing production output, minimizing waste, optimizing processes, and utilizing resources effectively.
Analyze production output to ensure it meets targets and quality standards
Minimize waste by implementing lean manufacturing principles
Optimize processes by identifying bottlenecks and inefficiencies
Utilize resources effectively by managing inventory levels and production sc
5S is a methodology for organizing a workplace to improve efficiency and effectiveness by maintaining cleanliness and organization.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical and efficient manner
Shine - clean and inspect the work area regularly
Standardize - establish guidelines and procedures for maintaining the first 3 S's
Sustain - ensure the 5S system is co...
I applied via Newspaper Ad and was interviewed before Nov 2021. There were 3 interview rounds.
General knowledge questions regarding the State Government plans
posted on 28 Jun 2022
I applied via campus placement at Engineering College, Bikaner and was interviewed before Jun 2021. There were 3 interview rounds.
Always start first and be crisp and interactive and stick to the topic
posted on 22 Jan 2023
I applied via Referral and was interviewed before Jan 2022. There was 1 interview round.
Dross excess control can be achieved by implementing proper process controls and regular maintenance.
Regularly inspect and clean equipment to prevent buildup of dross
Implement process controls to minimize dross formation
Train employees on proper handling and disposal of dross
Monitor and analyze production data to identify areas for improvement
Collaborate with suppliers to ensure quality materials with minimal dross
Util...
To reduce rejection, focus on improving quality control measures and training employees.
Implement a thorough quality control process to catch defects early on
Train employees on proper production techniques and quality standards
Regularly review and analyze rejection data to identify patterns and areas for improvement
Collaborate with suppliers to ensure they are meeting quality standards
Invest in new technology or equipm...
Fuel consumption control can be achieved through proper planning, monitoring, and maintenance.
Develop a fuel consumption plan based on historical data and projected usage
Monitor fuel usage regularly and identify any deviations from the plan
Implement maintenance programs to ensure vehicles and equipment are operating efficiently
Train drivers and operators on fuel-efficient driving techniques
Consider alternative fuel sou...
To control manpower excess, proper planning, forecasting, and monitoring are necessary.
Analyze production data to determine the required workforce
Implement flexible work arrangements like part-time or temporary employment
Cross-train employees to perform multiple tasks
Monitor employee attendance and productivity
Implement a hiring freeze or reduce overtime
Consider outsourcing or automation as alternatives
Communicate with...
Fuel consumption, manpower, charging time, and rejection can be controlled through proper planning and implementation of efficient processes.
Implementing a fuel-efficient driving policy and regular maintenance of vehicles can reduce fuel consumption.
Proper scheduling and allocation of manpower can optimize productivity and reduce unnecessary labor costs.
Investing in fast charging technology and optimizing charging sche...
based on 1 review
Rating in categories
QA QC Engineer
3
salaries
| ₹3 L/yr - ₹15.8 L/yr |
Hindalco Industries
Hindustan Zinc
Rungta Mines
Vedanta Aluminium