Upload Button Icon Add office photos

Filter interviews by

APOLLO POWER SYSTEMS Sr.Electrical Project Engineer Interview Questions and Answers

Updated 30 Dec 2024

APOLLO POWER SYSTEMS Sr.Electrical Project Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Basically Technical related questions on electrical projects and handling project
  • Q2. Project Management related questions
Round 2 - Technical 

(2 Questions)

  • Q1. Electrical projects related to switchyard installation and commissioning
  • Q2. Panel,transformer , DG , various drives erection testing and commissioning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for technical round since technically strong people can crack the interview with 45 minutes and minimum 30 questions

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Full details in transformer Star delta connection Electrical insulator
  • Ans. 

    Transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction. Star delta connection is a method used to connect three-phase electrical motors. Electrical insulators are materials that resist the flow of electric current.

    • Transformer: device that transfers electrical energy through electromagnetic induction

    • Star delta connection: method for connecting three-phase ...

  • Answered by AI

I applied via Walk-in and was interviewed in Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Basic mathematics aptitudes.
Basic level of core field related question. (Fresher)

Round 3 - One-on-one 

(3 Questions)

  • Q1. Electrical Engineering
  • Ans. Explain basic level of Electrical Engineering related answers like, type of switch gear, Type of Transformer, Type of motors, DOL Starter, Star Delta Starter, SLD, circuit diagram, Types of Power Plants, Step wise explain how to power delivers to power station to residential/commercial/industrial.
  • Answered Anonymously
  • Q2. Introduce yourself and working life style ?
  • Q3. Why you interested in the post?
  • Ans. Bcz it is best for growing my career and my skills development more strongly.
  • Answered Anonymously
Round 4 - HR 

(3 Questions)

  • Q1. What you know about this company?
  • Ans. Research before the company related details where you are applying.
  • Answered Anonymously
  • Q2. Why you're interested to work in this company?
  • Ans. Given answer is the best.. I see this opportunity as a way of my skill developing and contributing my skills to an exciting/ forward-thinking fast moving company/industry. Second one if company near about your hometown.. I see this company near about my home and I am easily work here and also take care my family (valid reason share).
  • Answered Anonymously
  • Q3. What your expectations from our company?
  • Ans. My goals for the company are that it have work atmosphere in which I will contribute to the team, be recognized for my efforts, provide career security, and have the opportunity to advance within the company.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Polycab Wires Electrical Project Engineer interview:
  • Electrical Engineering
Interview preparation tips for other job seekers - After your college never forget you are student, so every think about we are a long life student that motive to remove your barriers and easily you learn more skills in your career. I know money is more important but you are best in your specialization so money always credited in your account from better person who's importance given your work values.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. About your Past Experience
  • Q2. Your knowledge about Cables & workings of UG cable project
  • Q3. Knowledge of safety protocol during construction.
  • Q4. Some general awareness questions.
  • Q5. Your letter writing skills
  • Q6. Focus on your personal attitude

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through in detailed with your resume,Since KEI basically works for UG Cable projects and some Sub Station. You should have knowledge of UG cable works,go through the technical specifications of cable,Sub Station equipment.
Round 1 - Technical 

(2 Questions)

  • Q1. Tell about the work function of LA
  • Ans. LA has the metal oxide varistor discs inside it.At the standard system voltage it acts as insulator & doesn't allow current to pass through it.But in case of high voltage surges,it acts as conductor and allows the high current to pass through it.As LA are earthed.So the current is earthed and expensive electricals are saved from damage.
  • Answered Anonymously
  • Q2. What should be the earth resistance of a distribution transformer?In case of high resistance what is the solution
  • Ans. 

    Earth resistance of a distribution transformer and solution for high resistance

    • The earth resistance of a distribution transformer should be less than 1 ohm

    • High resistance can cause electric shock and damage to equipment

    • Solution for high resistance includes improving grounding system, adding more grounding rods, and using chemical treatment

    • Regular maintenance and testing of grounding system is important

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer the questions confidently.Dont bluff.

APOLLO POWER SYSTEMS Interview FAQs

How many rounds are there in APOLLO POWER SYSTEMS Sr.Electrical Project Engineer interview?
APOLLO POWER SYSTEMS interview process usually has 2 rounds. The most common rounds in the APOLLO POWER SYSTEMS interview process are One-on-one Round and Technical.
What are the top questions asked in APOLLO POWER SYSTEMS Sr.Electrical Project Engineer interview?

Some of the top questions asked at the APOLLO POWER SYSTEMS Sr.Electrical Project Engineer interview -

  1. Panel,transformer , DG , various drives erection testing and commission...read more
  2. Basically Technical related questions on electrical projects and handling proj...read more
  3. Electrical projects related to switchyard installation and commission...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 APOLLO POWER SYSTEMS interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 418 Interviews
Thermax Limited Interview Questions
4.2
 • 234 Interviews
ABB Interview Questions
4.1
 • 224 Interviews
Adani Power Interview Questions
3.9
 • 198 Interviews
Havells Interview Questions
4.0
 • 194 Interviews
Tata Power Interview Questions
4.0
 • 156 Interviews
Suzlon Group Interview Questions
4.1
 • 122 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
Polycab Wires Interview Questions
4.1
 • 89 Interviews
View all
Electrical Technician
31 salaries
unlock blur

₹1.2 L/yr - ₹3 L/yr

Electrician
26 salaries
unlock blur

₹1.2 L/yr - ₹3.2 L/yr

Technician
22 salaries
unlock blur

₹1.6 L/yr - ₹4 L/yr

Electrical Supervisor
21 salaries
unlock blur

₹1.6 L/yr - ₹6 L/yr

Technical Supervisor
16 salaries
unlock blur

₹2.2 L/yr - ₹3.5 L/yr

Explore more salaries
Compare APOLLO POWER SYSTEMS with

Tata Power

4.0
Compare

Adani Power

3.9
Compare

BHEL

4.2
Compare

Suzlon Group

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview