Filter interviews by
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
Top trending discussions
What was the project you have done
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.
Round 1 was a coding test.
Round 1 of the interview process was a coding test.
The coding test likely involved writing code to solve a problem or complete a task.
The coding test may have been timed or untimed, and may have been completed remotely or in-person.
The coding test may have been used to assess the candidate's technical skills and problem-solving abilities.
I applied via Local and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Job Portal and was interviewed before Sep 2020. There was 1 interview round.
Cable manufacturing involves several steps including wire drawing, stranding, insulation, and jacketing.
Wire drawing involves pulling metal through a die to reduce its diameter.
Stranding involves twisting multiple wires together to form a cable.
Insulation is added to protect the wires from damage and prevent electrical interference.
Jacketing is the final step where a protective outer layer is added to the cable.
Quality...
I applied via Company Website and was interviewed in Mar 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Electrician
26
salaries
| ₹1.2 L/yr - ₹3.2 L/yr |
Electrical Technician
23
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Technician
22
salaries
| ₹1.6 L/yr - ₹4 L/yr |
Electrical Supervisor
20
salaries
| ₹1.6 L/yr - ₹3.6 L/yr |
Technical Supervisor
16
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
Havells
Polycab Wires
CG Power and Industrial Solutions
C&S Electric