Accidents can be caused by various factors such as human error, equipment failure, environmental conditions, and lack of safety measures.
Human error: Mistakes or negligence by individuals involved in the project.
Equipment failure: Malfunction or breakdown of machinery or tools.
Environmental conditions: Adverse weather, natural disasters, or other external factors.
Lack of safety measures: Insufficient safety protocols o...
Insufficient maintenance of machinery can lead to breakdowns and production delays.
Regular maintenance schedules should be established and followed.
Proper training should be provided to operators and maintenance personnel.
Use of predictive maintenance techniques can help identify potential issues before they become major problems.
Examples: oil changes, lubrication, cleaning, calibration, inspections.
Failure to maintain...
I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.
The amount of miller required for transporting 500 cum concrete depends on various factors.
The type of miller being used
The distance the concrete needs to be transported
The size of the project
The time frame for completing the project
The availability of resources
The budget allocated for the project
I applied via Naukri.com and was interviewed before May 2021. There were 3 interview rounds.
The density of cement is around 1440 kg/m³.
Density of cement is the mass per unit volume of cement.
It is measured in kg/m³ or g/cm³.
The density of cement varies depending on the type of cement used.
For example, the density of Portland cement is around 1440 kg/m³.
The density of lightweight cement is around 1000 kg/m³.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
The project lifecycle is the series of phases a project goes through from initiation to completion.
Initiation: Define project goals, scope, and stakeholders
Planning: Create a detailed project plan, schedule, and budget
Execution: Implement the project plan and deliver the project
Monitoring and Controlling: Track progress, manage changes, and ensure quality
Closing: Finalize all project activities and hand off deliverable
Model reviews typically include checking for accuracy, completeness, consistency, and compliance with standards.
Checking accuracy of dimensions and specifications
Ensuring completeness of all required components and features
Verifying consistency in design and documentation
Confirming compliance with industry standards and regulations
The typical deliverables of a project engineer include design drawings, technical specifications, project schedules, cost estimates, and progress reports.
Design drawings: detailed plans and schematics for construction or manufacturing
Technical specifications: detailed requirements for materials, equipment, and processes
Project schedules: timelines for completing tasks and milestones
Cost estimates: budget projections fo...
posted on 10 Nov 2021
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
Foundation work involves sinking wells. Challenges include tilt and shift of well. Rectification methods include bottom plugging and cassion methodology.
Foundation work involves sinking wells
Challenges faced include tilt and shift of well
Rectification methods include bottom plugging and cassion methodology
Bottom plugging involves filling the bottom of the well with concrete or other materials to stabilize it
Cassion met...
Assistant Manager
58
salaries
| ₹5.5 L/yr - ₹14.5 L/yr |
Project Engineer
50
salaries
| ₹3 L/yr - ₹9 L/yr |
Deputy Manager
45
salaries
| ₹4.4 L/yr - ₹16.5 L/yr |
Senior Project Engineer
34
salaries
| ₹3.8 L/yr - ₹10 L/yr |
Chief Manager
28
salaries
| ₹15 L/yr - ₹30.1 L/yr |
Simplex Infrastructures
Sterling & Wilson
Aarvee Associates
Nasser S. Al Hajri Corporation