BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a structure.
BBS is used in construction to ensure the correct amount and placement of reinforcement bars in concrete structures.
It includes details such as bar size, spacing, bending shapes, and quantities.
BBS helps in estimating the quantity of steel required for a project and ensures structural integrity.
Example: A BBS for a beam w...
Unit weight of steel is the weight of a specific volume of steel material.
Unit weight of steel is typically around 7850 kg/m^3.
The unit weight can vary depending on the type of steel and its composition.
To calculate the unit weight of steel, you can use the formula: Unit weight = Weight / Volume.
For example, the unit weight of a steel plate with dimensions 1m x 1m x 1m would be 7850 kg.
I have completed 5 projects, including construction of a hospital, a commercial building, and a residential complex.
Completed 5 projects in total
Projects include construction of a hospital, commercial building, and residential complex
Experience in managing site execution for various types of projects
Role of job and responsibilities
I applied via LinkedIn and was interviewed before Oct 2022. There were 2 interview rounds.
The unit weight of TMT bar varies depending on its size and grade.
The unit weight of TMT bar is measured in kilograms per meter (kg/m).
The weight of TMT bar can range from 0.617 kg/m to 6.16 kg/m, depending on the size and grade.
For example, a 10mm diameter TMT bar of grade Fe500 weighs approximately 0.617 kg/m.
On the other hand, a 25mm diameter TMT bar of grade Fe500 weighs around 3.858 kg/m.
PPC/OPC Cement refers to different grades of cement used in construction.
PPC stands for Portland Pozzolana Cement, which is a type of cement that contains pozzolanic materials like fly ash.
OPC stands for Ordinary Portland Cement, which is a type of cement that does not contain any pozzolanic materials.
The grade of cement refers to its strength and quality. Common grades include 33, 43, and 53.
PPC/OPC cement is commonly...
Measurement of building material vehicles involves assessing their dimensions and capacity.
Measure the length, width, and height of the vehicle to determine its overall size.
Calculate the volume of the vehicle by multiplying its length, width, and height.
Consider the payload capacity of the vehicle, which is the maximum weight it can carry.
Take into account any special features or compartments in the vehicle that may a...
Aneja Constructions (India) interview questions for popular designations
Top trending discussions
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.
I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.
M25 concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).
M25 concrete is commonly used in construction projects.
It is a mix of cement, sand, and coarse aggregates in a specific ratio.
The ratio of cement to sand to coarse aggregates in M25 concrete is 1:1:2.
The compressive strength of M25 concrete is achieved after 28 days of curing.
M25 concrete is suitable for various applications such as
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Grade of concrete at site refers to the strength of the concrete mix used in construction.
Grade of concrete is specified by its compressive strength in megapascals (MPa) at 28 days.
Common grades of concrete include M20, M25, M30, etc.
Higher grade concrete indicates higher strength and durability.
The grade of concrete is determined by the mix design and testing of samples.
For example, M25 grade concrete has a compressiv
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
based on 7 interviews
Interview experience
based on 41 reviews
Rating in categories
Civil Site Engineer
14
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Site Engineer
6
salaries
| ₹2.2 L/yr - ₹3.8 L/yr |
Civil Engineer
5
salaries
| ₹1.6 L/yr - ₹5.4 L/yr |
Senior Accountant
5
salaries
| ₹2.7 L/yr - ₹4.9 L/yr |
Planning & Billing Engineer
5
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures