Filter interviews by
I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.
Aptitude, Logical Reasoning
On Job Testing as per experience
Top trending discussions
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
posted on 12 Apr 2022
Laws of heat exchange refer to the fundamental principles governing the transfer of heat between two bodies.
Heat always flows from a hotter body to a colder body
The rate of heat transfer is proportional to the temperature difference between the two bodies
The rate of heat transfer is proportional to the surface area of contact between the two bodies
The rate of heat transfer is inversely proportional to the distance betw...
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.
Focuses on continuous improvement
Aims to increase efficiency and reduce costs
Involves all employees in the process
Uses tools such as value stream mapping and 5S
Examples include Toyota Production System and Kaizen
posted on 12 Apr 2022
Laws of heat exchange refer to the fundamental principles governing the transfer of heat between two bodies.
Heat always flows from a hotter body to a colder body
The rate of heat transfer is proportional to the temperature difference between the two bodies
The rate of heat transfer is proportional to the surface area of contact between the two bodies
The rate of heat transfer is inversely proportional to the distance betw...
I applied via Walk-in and was interviewed before Jun 2022. There were 3 interview rounds.
About how to make achieve a process in different types of products and how to perform in beyond on work.
In Which code of product is processing immediately note down the concerned register and it's specific time vs actual time mention in the register.
I applied via Naukri.com and was interviewed before May 2021. There were 4 interview rounds.
General Discussion,, Expectation of Management
based on 4 reviews
Rating in categories
Production Engineer
15
salaries
| ₹2 L/yr - ₹2.8 L/yr |
Line Leader
14
salaries
| ₹1.5 L/yr - ₹2.5 L/yr |
Engineer
13
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Production Supervisor
10
salaries
| ₹1.6 L/yr - ₹3.5 L/yr |
Senior Engineer
10
salaries
| ₹4 L/yr - ₹6.4 L/yr |
BHEL
Thermax Limited
Larsen & Toubro Limited
TCS