i
Walplast Products
Filter interviews by
I applied via Naukri.com and was interviewed before May 2021. There were 4 interview rounds.
General Discussion,, Expectation of Management
Top trending discussions
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.
Focuses on continuous improvement
Aims to increase efficiency and reduce costs
Involves all employees in the process
Uses tools such as value stream mapping and 5S
Examples include Toyota Production System and Kaizen
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
I applied via Walk-in and was interviewed before Jun 2022. There were 3 interview rounds.
About how to make achieve a process in different types of products and how to perform in beyond on work.
In Which code of product is processing immediately note down the concerned register and it's specific time vs actual time mention in the register.
I applied via Campus Placement and was interviewed before Aug 2020. There were 6 interview rounds.
Data cleaning best practices
Remove duplicate records
Handle missing values
Standardize data formats
Correct inconsistent data
Validate data integrity
Remove outliers
Normalize data
Handle data inconsistencies
Ensure data accuracy
Logistic regression is a statistical method used to analyze and model the relationship between a categorical dependent variable and one or more independent variables.
It is a type of regression analysis used for predicting the probability of a categorical outcome
It is commonly used in binary classification problems
It uses a logistic function to model the relationship between the independent variables and the dependent v...
I applied via Naukri.com and was interviewed before Oct 2020. There were 6 interview rounds.
I applied via Company Website and was interviewed in Aug 2020. There were 6 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
based on 2 reviews
Rating in categories
Senior Executive
63
salaries
| ₹3 L/yr - ₹6.2 L/yr |
Senior Sales Executive
50
salaries
| ₹3.9 L/yr - ₹6.2 L/yr |
Sales Executive
48
salaries
| ₹2.7 L/yr - ₹5.3 L/yr |
Assistant Manager
44
salaries
| ₹4.1 L/yr - ₹8 L/yr |
Executive Accountant
18
salaries
| ₹2 L/yr - ₹3.7 L/yr |
J K Fenner
Saudi Binladin Group
Bahwan Engineering
Eversendai