Filter interviews by
posted on 12 Dec 2024
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
Power factor is a measure of how effectively electrical power is being used in a circuit.
Power factor is the ratio of real power (kW) to apparent power (kVA) in an electrical circuit.
It indicates how efficiently power is being converted into useful work.
A power factor of 1 means all the power is being used effectively, while a power factor less than 1 indicates inefficiency.
Power factor can be improved by using power f...
A CT (Current Transformer) is a type of instrument transformer that is used to measure alternating electric currents.
CTs are used to step down high currents to a lower, more manageable level for measurement or protection purposes
They work based on the principle of electromagnetic induction
CTs are commonly used in power distribution systems to monitor and protect electrical equipment
They are essential for accurate meter...
UPS power is a backup power supply system that provides continuous power during outages, while invest refers to putting money into a financial venture for future gain.
UPS power stands for Uninterruptible Power Supply and is used to provide backup power during outages.
Investing involves putting money into a financial venture with the expectation of future gain.
UPS power is critical for maintaining power to essential equ...
Circuit breakers protect circuits from overloads and short circuits, while isolators physically disconnect circuits for maintenance or repair.
Circuit breakers automatically trip when there is an overload or short circuit to protect the circuit.
Isolators are manually operated switches that physically disconnect a circuit for maintenance or repair.
Circuit breakers are designed to interrupt current flow during a fault con...
A relay is an electrically operated switch that controls a high-power circuit with a low-power signal.
Relays are used to control circuits by opening or closing contacts when a signal is received
They are commonly used in industrial applications to control motors, lights, heaters, and other high-power devices
Relays can be controlled by a variety of input signals, such as voltage, current, or even light
Examples of relays ...
Types of induction motors include single-phase, three-phase, squirrel cage, and wound rotor motors.
Single-phase induction motors are commonly used in household appliances and small industrial applications.
Three-phase induction motors are more efficient and are used in larger industrial applications.
Squirrel cage induction motors have a simple and rugged construction, making them suitable for various applications.
Wound ...
Top trending discussions
posted on 10 Apr 2023
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
I was interviewed in May 2022.
posted on 8 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
The maximum span under bridges depends on various factors such as bridge type, design, and load capacity.
The maximum span under bridges is determined by the bridge type and design.
Factors such as the load capacity of the bridge and the materials used also affect the maximum span.
Different types of bridges have different maximum spans, for example, a suspension bridge can have a much longer span compared to a beam bridg...
Clearance from signals in front and back side is important for safety and efficient operation.
Clearance refers to the minimum distance required between the signals and any surrounding objects or structures.
It ensures that there is no interference or obstruction to the signals' visibility or functionality.
Clearance requirements may vary depending on the specific signal type and its intended purpose.
For example, in traff...
For making LOP, the required data includes the electrical load details, power supply specifications, circuit layout, and safety regulations.
Electrical load details such as the type of equipment, power rating, and operating voltage are necessary.
Power supply specifications like the voltage level, frequency, and phase configuration are important.
The circuit layout, including the arrangement of components, wiring, and con...
The data required for making CSD includes specifications, schematics, component datasheets, and design constraints.
Specifications of the electrical system
Schematics of the circuit design
Datasheets of the components being used
Design constraints and requirements
Seeking new challenges and growth opportunities.
Looking for a more challenging role to further develop my skills and expertise.
Seeking a company that aligns better with my long-term career goals.
Desire to work on more innovative projects and cutting-edge technologies.
Wishing to broaden my professional network and learn from new colleagues.
Wanting to explore different industry sectors and gain diverse experience.
I am unable to provide my last salary as I do not have access to the data.
I do not have the available data to provide my last salary
I am unable to access my salary information for the last 3 months
Unfortunately, I cannot provide the requested information
posted on 11 Feb 2022
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
Interview experience
Assistant Manager
53
salaries
| ₹3.4 L/yr - ₹7.2 L/yr |
Senior Executive
24
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Deputy Manager
22
salaries
| ₹5 L/yr - ₹10.4 L/yr |
Executive
15
salaries
| ₹2.7 L/yr - ₹4.2 L/yr |
Project Executive
14
salaries
| ₹3 L/yr - ₹4 L/yr |
UltraTech Cement
ACC
Shree Cement
Ambuja Cements