Upload Button Icon Add office photos

Ambuja Cements

Compare button icon Compare button icon Compare

Filter interviews by

Ambuja Cements Assistant Manager Maintenance Interview Questions and Answers for Experienced

Updated 10 Jul 2024

Ambuja Cements Assistant Manager Maintenance Interview Experiences for Experienced

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. HOW MUCH EXPRIENCE

Interview Preparation Tips

Interview preparation tips for other job seekers - MAINTENANCE MANAGER

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Pls give your brief description about yourself and family background.
  • Q2. Are you interested to relocate?
  • Q3. Why do you want to leave your current job and organisation?
  • Q4. What is your current CTC?
  • Q5. What is your expectations from our organisation?
Round 3 - Technical 

(7 Questions)

  • Q1. Please tell me about your key responsibilities of your section.
  • Q2. What is your roles and responsibilities?
  • Q3. What major modification you have done in your section?
  • Q4. What kind of challenges you have faced and how do you managed?
  • Q5. What is the strength of manpower you have handled and what changes you have done to reduce the manpower?
  • Q6. Pls tell about your section SPC, SHC, MTBF, MTTR, Availability and Cost in terms of budget.
  • Ans. 

    SPC, SHC, MTBF, MTTR, Availability, and Cost are key performance indicators used to measure maintenance efficiency and effectiveness.

    • SPC (Scheduled Plant Capacity) measures the maximum output a plant can achieve under normal conditions.

    • SHC (Scheduled Hours Capacity) measures the total hours a plant is scheduled to operate.

    • MTBF (Mean Time Between Failures) measures the average time between equipment failures.

    • MTTR (Mean ...

  • Answered by AI
  • Q7. How many major shutdowns you have handled?
  • Ans. 

    I have handled three major shutdowns in my career.

    • Managed a major shutdown at my previous company involving over 100 machines and equipment

    • Coordinated with various departments to ensure smooth execution of shutdown activities

    • Implemented preventive maintenance measures to reduce downtime during shutdowns

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Pl do preparation for personal interview in front of mirror for better body language.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

General knowledge, marketing,

Round 2 - Technical 

(2 Questions)

  • Q1. Power distribution syatem
  • Q2. Plant architecture
Round 3 - HR 

(2 Questions)

  • Q1. Manpower handling
  • Q2. Crisis situation

I applied via Recruitment Consultant and was interviewed in Jun 2019. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. 1.About verious cement & theare code.
  • Q2. 2.Concrete mix design.
  • Ans. 

    Concrete mix design involves determining the proportions of ingredients to create a specific concrete mixture.

    • The mix design process considers factors such as strength, workability, and durability.

    • Ingredients typically include cement, water, aggregates, and admixtures.

    • The proportions of each ingredient are determined based on the desired properties of the concrete and the specific application.

    • For example, a mix designe...

  • Answered by AI
  • Q3. 3.About cement physical test

Interview Preparation Tips

Interview preparation tips for other job seekers - 1.Need to give right & correct answer.

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Technical round asking about mills outputs
  • Q2. Asking overall lab activities
  • Q3. XRF CALIBRATION , bis norms.
  • Q4. Why u change organization

Interview Preparation Tips

Topics to prepare for Shree Cement Assistant Manager interview:
  • XRF, CALIBRATION
Interview preparation tips for other job seekers - Shree cement Limited is very good organization. Employee welfare also very good.

Interview Questionnaire 

1 Question

  • Q1. Still not provide me anyone accomodation and today I am asking about winter jacket to Mr Abhishek Bhattacharya,but he will say get me jacket after 3 years as well as he will very irretrate me.

I applied via Monster and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Introduce yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive

I applied via Campus Placement and was interviewed before Jul 2020. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical what is boiler Turbine etc
  • Q2. Safety environment asspect and impacts

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical about your job work experience

I applied via Referral and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. TSM Sir, Asking as normal questions like- he wants to know about myself. Area wise dealer and retailer details.
  • Q2. Asking about Cement industries market and top selling dealers details

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to join Ultratech Cement Ltd on their payroll.

I applied via Company Website and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Share details of your previous job.
  • Q2. What are your salary expectations?
  • Q3. What is your family background?
  • Q4. Why should we hire you?
  • Q5. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good environment. Ultratech is a largest cement company in this country .

Ambuja Cements Interview FAQs

How many rounds are there in Ambuja Cements Assistant Manager Maintenance interview for experienced candidates?
Ambuja Cements interview process for experienced candidates usually has 1 rounds. The most common rounds in the Ambuja Cements interview process for experienced candidates are HR.

Tell us how to improve this page.

Ambuja Cements Assistant Manager Maintenance Interview Process for Experienced

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

UltraTech Cement Interview Questions
4.2
 • 571 Interviews
JK Cement Interview Questions
4.1
 • 254 Interviews
ACC Interview Questions
3.9
 • 189 Interviews
Shree Cement Interview Questions
3.8
 • 155 Interviews
Star Cement Interview Questions
4.0
 • 64 Interviews
HIL Limited Interview Questions
4.1
 • 61 Interviews
View all
Ambuja Cements Assistant Manager Maintenance Salary
based on 33 salaries
₹5.3 L/yr - ₹12.9 L/yr
5% less than the average Assistant Manager Maintenance Salary in India
View more details

Ambuja Cements Assistant Manager Maintenance Reviews and Ratings

based on 3 reviews

2.8/5

Rating in categories

3.2

Skill development

2.6

Work-life balance

2.3

Salary

3.0

Job security

1.3

Company culture

1.8

Promotions

2.3

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
356 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
201 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Technical Service Engineer
177 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
109 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Executive
101 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Ambuja Cements with

UltraTech Cement

4.2
Compare

ACC

3.9
Compare

Shree Cement

3.8
Compare

The Ramco Cements

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview