Filter interviews by
I am a detail-oriented and analytical Quality Surveillance Engineer with experience in ensuring compliance with industry standards and regulations.
I have a strong understanding of quality control processes and procedures
I am skilled in conducting audits and inspections to identify areas for improvement
I have experience in developing and implementing corrective action plans
I am proficient in using quality management sof...
I worked in a stressful environment during a project in a remote location.
I was part of a team that was sent to a remote location to work on a project with a tight deadline
The location was not very comfortable and we had to work long hours
We faced several challenges such as limited resources and communication issues
To cope with the stress, we made sure to take breaks and support each other
We also communicated regularly...
My USP is my ability to identify and solve quality issues quickly and efficiently.
Strong analytical skills to identify root causes of quality issues
Experience in implementing corrective and preventive actions
Ability to work collaboratively with cross-functional teams
Attention to detail to ensure compliance with quality standards
Continuous improvement mindset to drive quality excellence
Examples: Reduced defect rate by 3...
Top trending discussions
I applied via Campus Placement
I applied via Referral
posted on 17 Dec 2020
I applied via Recruitment Consulltant and was interviewed before Dec 2019. There were 3 interview rounds.
40 for 40 mcq question mixture of aptitude and english behavioural questions
I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.
There are various types of hydraulic pumps used in mechanical systems.
Different types of hydraulic pumps include gear pumps, vane pumps, and piston pumps.
Gear pumps are simple and cost-effective, but have lower efficiency.
Vane pumps are more efficient and provide higher pressure, but are more complex.
Piston pumps are highly efficient and can handle high pressures, but are more expensive.
The choice of hydraulic pump dep...
The question is unclear and requires clarification.
Request clarification on what is meant by 'type gear teeth'.
Ask for more information or context to provide an accurate answer.
Without further details, it is not possible to answer the question.
I applied via Recruitment Consulltant
posted on 22 Jun 2022
I applied via Walk-in and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 12 May 2022
I was interviewed in Apr 2022.
Electrical maintenance includes preventive, corrective, and predictive maintenance.
Preventive maintenance involves routine inspections and servicing to prevent breakdowns.
Corrective maintenance involves repairing or replacing faulty equipment.
Predictive maintenance involves using data analysis to predict when maintenance is needed.
Examples of maintenance tasks include cleaning, lubricating, testing, and replacing parts...
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
I expect a competitive salary that reflects my experience and the responsibilities of the Manager M1 role.
Research the average salary range for Manager M1 positions in your industry and location.
Consider your years of experience, relevant skills, and qualifications when determining your salary expectations.
Be prepared to negotiate and discuss your salary expectations during the interview process.
Avoid giving a specific...
My family background is diverse and multicultural, with members from different countries and professions.
My parents are from different countries, which has exposed me to different cultures and perspectives.
My siblings and I have pursued various professions, including engineering, medicine, and business.
We value education and have a strong emphasis on continuous learning and personal growth.
Family gatherings are always ...
I worked as a Project Manager at XYZ Company, overseeing multiple teams and projects.
Managed a team of 10 employees
Successfully completed a project within a tight deadline
Implemented new project management software to improve efficiency
Collaborated with cross-functional teams to ensure project success
Looking for new challenges and growth opportunities.
Seeking a role that offers more responsibility and the chance to lead a team.
Interested in expanding my skill set and learning new industry trends.
Want to work in a company that aligns with my values and offers a positive work culture.
Desire to contribute to a larger organization and make a bigger impact.
Seeking better work-life balance and flexibility in my schedule.
I am an experienced manager with a strong background in team leadership and project management.
Over 10 years of experience in managing teams and delivering successful projects
Proven track record of achieving targets and meeting deadlines
Excellent communication and interpersonal skills
Strong problem-solving and decision-making abilities
Led a team of 20 employees to increase productivity by 30% within 6 months
Successfull...
posted on 21 Aug 2021
To troubleshoot MPLS and ILL connectivity, check for configuration errors, physical layer issues, and routing problems.
Check the configuration of the MPLS and ILL devices to ensure they are properly configured.
Verify that the physical layer connections are functioning properly.
Check the routing tables to ensure that the correct routes are being used.
Use tools such as ping and traceroute to test connectivity and identif...
Yes, I can configure Cisco routers.
I have experience configuring Cisco routers in various network topologies.
I am familiar with configuring routing protocols such as OSPF and BGP.
I can configure VLANs, access control lists, and Quality of Service (QoS) policies.
I am comfortable using command line interface (CLI) and graphical user interface (GUI) tools.
I can troubleshoot and resolve configuration issues.
For example, I ...
Yes, I can troubleshoot the problem without any help of tools.
I would start by identifying the symptoms of the problem
Then, I would try to isolate the problem by checking different components of the network
I would also check the logs and configurations of the devices involved
If necessary, I would perform packet captures and analyze the traffic
Finally, I would use my knowledge and experience to determine the root cause
Assure the customer that the issue is being addressed and provide regular updates on the progress.
Acknowledge the issue and apologize for the inconvenience caused.
Assure the customer that the issue is being addressed and provide an estimated time for resolution.
Provide regular updates on the progress and any changes in the estimated time for resolution.
Offer alternative solutions or workarounds if available.
Follow up w...
based on 3 interviews
Interview experience
based on 44 reviews
Rating in categories
Structural Design Engineer
4
salaries
| ₹14.1 L/yr - ₹24 L/yr |
Project Engineer
3
salaries
| ₹24 L/yr - ₹27 L/yr |
Data Analyst
3
salaries
| ₹5.5 L/yr - ₹6 L/yr |
Operations Executive
3
salaries
| ₹3.6 L/yr - ₹3.6 L/yr |
Electrician
3
salaries
| ₹0.2 L/yr - ₹0.3 L/yr |
Tata Steel
Jindal Steel and Power
Steel Authority Of India
ArcelorMittal Nippon Steel