Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There were 2 interview rounds.
PPM stands for Parts Per Million and is a measure of the number of defective parts in a million parts produced.
PPM is a key performance indicator used to measure the quality of products in manufacturing.
It is calculated by dividing the number of defective parts by the total number of parts produced and multiplying by one million.
Controlling PPM involves implementing quality control measures, conducting regular inspecti...
There are 14 mandatory clauses in IATF.
IATF 16949:2016 has 14 mandatory clauses that organizations must comply with to achieve certification.
These clauses cover areas such as quality management system requirements, leadership commitment, planning, support, operation, performance evaluation, and improvement.
Examples of mandatory clauses include clause 4.3 on determining the scope of the quality management system and cla...
Customer complaints are handled promptly and effectively to ensure customer satisfaction.
Customer complaints are received through various channels such as phone calls, emails, or in-person interactions.
Complaints are logged in a central system for tracking and resolution.
A designated team member is assigned to investigate and resolve each complaint.
Customers are kept informed of the progress and resolution of their com...
Top trending discussions
posted on 30 Jan 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 3 Dec 2021
I applied via Recruitment Consultant and was interviewed in Nov 2021. There was 1 interview round.
posted on 28 Oct 2022
I applied via Campus Placement and was interviewed before Oct 2021. There were 4 interview rounds.
Basic reasoning and English aptitude paper followed by attentiveness test.
I applied via Walk-in and was interviewed in Jun 2021. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
Core tools of AIAG include FMEA, PPAP, MSA, SPC, and APQP.
FMEA (Failure Mode and Effects Analysis) is used to identify and prioritize potential failure modes in a process.
PPAP (Production Part Approval Process) is used to ensure that suppliers meet customer requirements.
MSA (Measurement Systems Analysis) is used to assess the quality of measurement systems.
SPC (Statistical Process Control) is used to monitor and contro...
I have experienced failures in project deadlines, communication, and technical solutions.
Missed project deadlines due to underestimating tasks
Miscommunication with team members leading to misunderstandings
Implemented technical solutions that did not meet requirements
Heat treatment process is a method used to alter the physical and sometimes chemical properties of a material through heating and cooling.
Involves heating the material to a specific temperature
Holding it at that temperature for a set amount of time
Then cooling it at a controlled rate
Can be used to increase hardness, improve machinability, or enhance other properties
Common techniques include annealing, quenching, temper
I applied via Campus Placement
I applied via Walk-in and was interviewed in Jul 2022. There were 2 interview rounds.
Arithmetic, reasoning, English
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Naukri.com
based on 1 interview
Interview experience
Quality Engineer
24
salaries
| ₹2 L/yr - ₹4 L/yr |
Production Engineer
16
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
QA Engineer
13
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Senior Quality Assurance Engineer
11
salaries
| ₹3.8 L/yr - ₹5.4 L/yr |
Engineer
10
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Ag Industries
Toyoda Gosei Minda
Ralson Tyres Limited
Global Autotech