Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.
In case of foaming in absorber, the action would be to identify the cause, adjust operating conditions, and take appropriate measures to control the foam.
Identify the cause of foaming, which can be due to factors like high liquid flow rate, presence of contaminants, or chemical reactions.
Adjust operating conditions such as reducing liquid flow rate, adjusting temperature or pressure, or adding anti-foaming agents.
Take ...
posted on 24 Dec 2024
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
Job profile knowledge
Field Operator
5
salaries
| ₹4.5 L/yr - ₹15 L/yr |
DCS Operator
3
salaries
| ₹13 L/yr - ₹15 L/yr |
Reliance Industries
Oil And Natural Gas Corporation
Bharat Petroleum
Hindustan Petroleum