Filter interviews by
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
posted on 1 Apr 2024
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
They are giving test, in which all people can cheat in exam.
posted on 8 Jan 2015
Discussion on soil mechanics starting from modulus of elasticity to liquifaction
Modulus of elasticity is a measure of soil stiffness
Soil strength is important in determining its ability to withstand loads
Liquifaction occurs when soil loses strength and behaves like a liquid
Factors affecting soil strength include soil type, moisture content, and stress history
Liquifaction can lead to soil failure and damage to structure
posted on 2 Jul 2022
I applied via Walk-in and was interviewed before Jul 2021. There were 2 interview rounds.
Arithmetic and logical reasoning
posted on 10 Jul 2024
posted on 29 Aug 2024
I applied via Naukri.com
Technical questions about the Revit and MEP
I applied via Campus Placement and was interviewed before Jun 2022. There were 2 interview rounds.
Campus selection - reasoning tests
posted on 15 Jun 2024
Shear key is a device used to transfer shear forces between two components in a structure.
Shear keys are typically used in construction joints to prevent sliding between adjacent components.
They are designed to resist horizontal forces and ensure stability.
Shear keys can be found in structures such as bridges, buildings, and dams.
Examples include shear keys in bridge expansion joints to prevent movement between bridge
Columns are vertical structural members that support loads, while beams are horizontal members that transfer loads to columns or walls.
Columns are vertical and primarily support compressive loads.
Beams are horizontal and primarily support bending loads.
Columns are typically taller than they are wide, while beams are typically wider than they are tall.
Examples: In a building, columns support the weight of the floors abo...
posted on 6 Jun 2024
Was good and excellent
Bending moment of a beam is a measure of the internal bending stresses within the beam.
Bending moment is the algebraic sum of moments about the neutral axis of the beam.
It is calculated by multiplying the force applied to the beam by the perpendicular distance from the force to the point of interest.
Bending moment can be positive (causing tension) or negative (causing compression) depending on the direction of the forc
Shear force of a beam refers to the internal force that causes a portion of the beam to slide in relation to an adjacent part.
Shear force is perpendicular to the axis of the beam.
It is caused by external loads applied parallel to the cross-section of the beam.
Shear force can cause bending or deformation in the beam.
Calculating shear force involves analyzing the forces acting on the beam and determining the internal for
posted on 4 Oct 2024
I was interviewed before Oct 2023.
Centre of gravity is the point where the entire weight of an object can be considered to act.
Centre of gravity is the point at which an object's weight is evenly distributed in all directions.
It is the point where the object would balance perfectly if suspended from that point.
For a symmetrical object, the centre of gravity is at the geometric centre.
For irregular shapes, the centre of gravity may not be at the physica
Moment of inertia is a measure of an object's resistance to changes in its rotation.
Moment of inertia depends on the mass of an object and how that mass is distributed around an axis of rotation.
It is calculated using the formula I = Σmiri^2, where mi is the mass of each particle and ri is the distance of each particle from the axis of rotation.
Objects with more mass distributed farther from the axis of rotation have a...
based on 1 interview
Interview experience
HSE Officer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Quantity Surveyor
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Tata Projects
GMR Group