Filter interviews by
I applied via Naukri.com and was interviewed in Feb 2024. There were 3 interview rounds.
Nature of work activities.
Maintaining real growth of the company.
The question is about addressing the financial challenges faced by humanity.
Identify root causes of financial struggles such as lack of education, job opportunities, or access to resources.
Implement solutions like financial literacy programs, job training initiatives, and microfinance options.
Collaborate with government agencies, NGOs, and financial institutions to create sustainable solutions.
Promote economic empowerm...
To get command over the job and monitor construction activities thoroughly, one must establish clear goals, communicate effectively, delegate tasks, and regularly review progress.
Establish clear goals and objectives for the project
Communicate effectively with team members, stakeholders, and contractors
Delegate tasks based on team members' strengths and expertise
Regularly review progress and make adjustments as needed
Ut...
Regular progress of the project can be maintained by setting clear goals, tracking milestones, effective communication, and adapting to changes.
Set clear goals and objectives for the project to keep everyone focused.
Track milestones and progress regularly to ensure the project is on track.
Communicate effectively with team members, stakeholders, and clients to address any issues or changes.
Adapt to changes in the projec...
Top trending discussions
I applied via Job Portal and was interviewed in Jan 2023. There were 3 interview rounds.
Box type waterproofing involves creating a sealed enclosure to prevent water damage.
Start by preparing the surface to be waterproofed
Apply a waterproofing membrane to the surface
Seal all joints and corners to ensure complete waterproofing
Test the waterproofing by filling the box with water and checking for leaks
Asked about the methodology for wp work
I applied via Referral and was interviewed before Feb 2022. There were 2 interview rounds.
Knowledge of finishing materials includes various types of stones used in construction.
Marble: A popular stone known for its elegance and durability.
Granite: A durable and versatile stone commonly used for countertops and flooring.
Travertine: A type of limestone with a unique porous texture, often used for walls and floors.
Slate: A fine-grained metamorphic rock suitable for roofing, flooring, and wall cladding.
Quartzit...
The standard sizes and heights of rooms, furniture, and fixtures vary depending on the purpose and design of the space.
Room sizes can range from small bedrooms of around 100 square feet to large living rooms of over 300 square feet.
Ceiling heights in residential buildings are typically around 8 to 9 feet, while commercial spaces may have higher ceilings.
Standard furniture sizes include twin, full, queen, and king beds ...
posted on 5 Mar 2022
I applied via Company Website and was interviewed in Sep 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 29 Jan 2024
I applied via campus placement at University Vishveshvaraya College of Engineering (UVCE) and was interviewed in Dec 2023. There was 1 interview round.
The density of steel is approximately 7.85 grams per cubic centimeter.
The density of steel is a measure of how much mass is contained in a given volume of steel.
It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel alloy.
For example, the density of carbon steel is typically around 7.85...
Men are dominant in site work due to various societal and cultural factors.
Historically, construction and site work have been male-dominated industries.
Stereotypes and biases have led to fewer women pursuing careers in civil engineering and related fields.
Physical demands and safety concerns associated with site work may discourage some women from entering the field.
Lack of representation and mentorship for women in si...
posted on 30 Apr 2024
posted on 31 Mar 2022
I applied via Job Portal and was interviewed in Jan 2023. There were 3 interview rounds.
Box type waterproofing involves creating a sealed enclosure to prevent water damage.
Start by preparing the surface to be waterproofed
Apply a waterproofing membrane to the surface
Seal all joints and corners to ensure complete waterproofing
Test the waterproofing by filling the box with water and checking for leaks
Asked about the methodology for wp work
Interview experience
based on 2 reviews
Rating in categories
Civil Foreman
12
salaries
| ₹2.6 L/yr - ₹4 L/yr |
Project Manager
10
salaries
| ₹8 L/yr - ₹10.4 L/yr |
Store Incharge
8
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Project Engineer
7
salaries
| ₹2.8 L/yr - ₹7.2 L/yr |
General Manager Project
7
salaries
| ₹14.2 L/yr - ₹18.2 L/yr |
DLF
Godrej Properties
Prestige Group
Sobha