Upload Button Icon Add office photos

Filter interviews by

Aevitas Pharmagro Tech. Interview Questions and Answers

Updated 12 May 2024

Aevitas Pharmagro Tech. Interview Experiences

Popular Designations

5 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. 1. introduction, background 2. previous project experience 3.heat exchanger details and distillation column packing
Round 2 - Technical 

(1 Question)

  • Q1. Introduction and previous project experience

Interview Preparation Tips

Interview preparation tips for other job seekers - talk on project life cycle and cross cultural understandings

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (10)
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Pump hydraulics Past experience Instrumentation knowledge

Process Engineer Interview Questions asked at other Companies

Q1. What is APQP and where is it used. And how many phases does it have? and fmea which phase are performed?
View answer (2)

Manager Interview Questions & Answers

user image Anonymous

posted on 25 Apr 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Details of Project executed
  • Ans. 

    Managed a project to implement a new customer relationship management system.

    • Led a team of 10 developers and analysts

    • Defined project scope, objectives, and deliverables

    • Developed project timeline and allocated resources

    • Coordinated with stakeholders to gather requirements

    • Implemented the CRM system within the given budget and timeline

    • Conducted user training and provided ongoing support

    • Achieved a 20% increase in customer s

  • Answered by AI
  • Q2. Knowledge about GMP and Pharma guidilines

Interview Preparation Tips

Interview preparation tips for other job seekers - keep you subject knowledge

Manager Interview Questions asked at other Companies

Q1. There is a chairman of a conglomerate. He has been on the post for 10 years, and is extremely dominating. He treats the various business heads like children, not letting them take any major decision. While the chairman has negatives, he bel... read more
View answer (2)

Aevitas Interview Questions & Answers

user image Anonymous

posted on 15 Jul 2021

Interview Questionnaire 

1 Question

  • Q1. Why Do you want to join Aevitas
  • Ans. 

    I want to join Aevitas because of their innovative approach to solving complex problems and their commitment to making a positive impact on society.

    • Aevitas has a reputation for being at the forefront of technological advancements.

    • I am impressed by Aevitas' track record of successfully tackling challenging projects.

    • The company's mission aligns with my personal values and aspirations.

    • Aevitas offers a collaborative and dy...

  • Answered by AI

Aevitas Pharmagro Tech. interview questions for popular designations

 Manager

 (1)

 Process Engineer

 (1)

 Project Engineer

 (1)

 Senior Architect

 (1)

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Experience in industrial architecture
  • Ans. 

    I have extensive experience in designing and managing industrial architecture projects.

    • Designed and managed construction of a 100,000 sq. ft. manufacturing facility for XYZ Company

    • Expertise in creating efficient layouts for production lines and optimizing workflow

    • Experience in incorporating sustainable and energy-efficient design elements in industrial buildings

    • Familiarity with building codes and regulations specific t...

  • Answered by AI
  • Q2. Details

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Senior Architect Interview Questions asked at other Companies

Q1. What is a typical cladding material. What are the types and how are they applicable for specific buildings.
View answer (2)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What are the OSHA standards applicable to building construction?
  • Ans. 

    OSHA standards applicable to building construction include fall protection, hazard communication, scaffolding safety, and electrical safety.

    • Fall protection requirements include guardrails, safety nets, and personal fall arrest systems.

    • Hazard communication standards require employers to provide information about hazardous chemicals used on site.

    • Scaffolding safety regulations cover proper construction, use, and maintenan...

  • Answered by AI
  • Q2. What are the AISC codes applicable to steel structures?
  • Ans. 

    AISC codes applicable to steel structures include AISC 360 for design of structural steel buildings and AISC 341 for seismic design.

    • AISC 360 - Specification for Structural Steel Buildings

    • AISC 341 - Seismic Provisions for Structural Steel Buildings

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is job safety analysis
  • Ans. 

    Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.

    • Involves breaking down a job task into steps

    • Identifying potential hazards for each step

    • Determining preventive measures to reduce risks

    • Ensures workers are aware of safety procedures

    • Examples: construction site JSA, manufacturing plant JSA

  • Answered by AI
  • Q2. What is hazard identification and risk assessment
  • Ans. 

    Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.

    • Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.

    • Risk assessment involves evaluating the likelihood and severity of harm from these hazards.

    • The goal is to implement con...

  • Answered by AI
  • Q3. What is fire safety
  • Ans. 

    Fire safety refers to measures taken to prevent and protect against the risks of fire.

    • Fire safety includes having working smoke detectors in place.

    • It also involves creating and practicing a fire escape plan.

    • Proper storage and handling of flammable materials is crucial for fire safety.

    • Regular maintenance of fire extinguishers and other fire safety equipment is important.

    • Training employees on fire safety protocols is ess

  • Answered by AI
  • Q4. Accident investigation
  • Q5. What is hazard site
  • Ans. 

    A hazard site is a location where there is a potential risk of harm to people, property, or the environment.

    • Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.

    • These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.

    • Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.

    • Examples of h...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it

Aevitas Pharmagro Tech. Interview FAQs

How many rounds are there in Aevitas Pharmagro Tech. interview?
Aevitas Pharmagro Tech. interview process usually has 1-2 rounds. The most common rounds in the Aevitas Pharmagro Tech. interview process are Technical and Resume Shortlist.
How to prepare for Aevitas Pharmagro Tech. interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Aevitas Pharmagro Tech.. The most common topics and skills that interviewers at Aevitas Pharmagro Tech. expect are Project Engineering, Design Engineering, Piping Design, Electrical Design and Architectural Design.
What are the top questions asked in Aevitas Pharmagro Tech. interview?

Some of the top questions asked at the Aevitas Pharmagro Tech. interview -

  1. Experience in industrial architect...read more
  2. Pump hydraulics Past experience Instrumentation knowle...read more
  3. Knowledge about GMP and Pharma guidili...read more

Tell us how to improve this page.

Aevitas Pharmagro Tech. Interview Process

based on 3 interviews

Interview experience

2.7
  
Poor
View more

Interview Questions from Similar Companies

UPL Interview Questions
4.1
 • 171 Interviews
PI Industries Interview Questions
4.0
 • 104 Interviews
Syngenta Interview Questions
4.2
 • 66 Interviews
Godrej Agrovet Interview Questions
4.0
 • 48 Interviews
Rallis India Interview Questions
4.2
 • 38 Interviews
BASF Interview Questions
4.4
 • 31 Interviews
View all

Aevitas Pharmagro Tech. Reviews and Ratings

based on 49 reviews

3.5/5

Rating in categories

3.2

Skill development

3.2

Work-life balance

3.3

Salary

3.2

Job security

3.4

Company culture

3.2

Promotions

3.1

Work satisfaction

Explore 49 Reviews and Ratings
Trainee Draughtsman - Civil

Mumbai

0-1 Yrs

Not Disclosed

Mechanical Site Engineer

Dahej

10-12 Yrs

Not Disclosed

Civil Design Engineer

Mumbai

8-10 Yrs

Not Disclosed

Explore more jobs
Process Engineer
19 salaries
unlock blur

₹3.6 L/yr - ₹10 L/yr

Senior Design Engineer
19 salaries
unlock blur

₹5.5 L/yr - ₹10.9 L/yr

Project Engineer
12 salaries
unlock blur

₹4.5 L/yr - ₹12 L/yr

Piping Design Engineer
6 salaries
unlock blur

₹7.5 L/yr - ₹9.1 L/yr

Senior Project Engineer
6 salaries
unlock blur

₹7.2 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Aevitas Pharmagro Tech. with

Syngenta

4.2
Compare

Bayer Crop Science Vegetable Seeds

4.4
Compare

UPL

4.1
Compare

BASF

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview