I applied via Newspaper Ad and was interviewed before Feb 2022. There was 1 interview round.
I was interviewed before Jun 2023.
Logical+ Attitude +Math
I applied via Referral and was interviewed in Nov 2022. There were 3 interview rounds.
Accrual concept recognizes revenue and expenses when they are earned/incurred, regardless of when cash is received/paid. Accounting standards provide guidelines for financial reporting.
Accrual concept is based on matching revenue and expenses in the same accounting period
Revenue is recognized when it is earned, not when cash is received
Expenses are recognized when they are incurred, not when cash is paid
Accounting stan...
Reasoning questions based on Logical thinking
I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.
SDA analysis involves studying the structure, dynamics, and activities of a system to identify potential improvements.
SDA stands for Structure, Dynamics, and Activities analysis
It helps in identifying bottlenecks, inefficiencies, and areas for improvement in a system
Common techniques used in SDA analysis include process mapping, data analysis, and performance metrics
Example: Conducting an SDA analysis on a manufacturin
posted on 27 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
I applied via Referral and was interviewed before Oct 2022. There were 4 interview rounds.
Basic aps question and geographical question
posted on 25 Oct 2017
I was interviewed before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
based on 3 interviews
Interview experience
based on 45 reviews
Rating in categories
Assistant Manager
292
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
158
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
93
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Officer
91
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
70
salaries
| ₹0 L/yr - ₹0 L/yr |
Jawaharlal Nehru Port Trust
Essar Ports
Krishnapatnam Port
Gujarat Pipavav Port