Upload Button Icon Add office photos

Filter interviews by

Adani Electricity Field Engineer Interview Questions and Answers

Updated 14 Apr 2023

Adani Electricity Field Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Round 1 is based on basic general knowledge objective question Test .

Round 3 - Technical 

(1 Question)

  • Q1. What is Transformef, what is CT, PT, what is surge arrestor, etc.
  • Ans. 

    Transformers, CTs, PTs, and surge arrestors are electrical components used in power systems to regulate voltage and protect equipment.

    • Transformers are used to step up or step down voltage levels in power systems.

    • CTs (Current Transformers) are used to measure current in power systems.

    • PTs (Potential Transformers) are used to measure voltage in power systems.

    • Surge arrestors are used to protect equipment from voltage spike

  • Answered by AI

I applied via Campus Placement and was interviewed in Oct 2022. There was 1 interview round.

Round 1 - Interview 

(2 Questions)

  • Q1. What is transformer,transformer part and functions,laws of kcl kvl and ohms
  • Ans. 

    Transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.

    • Transformers consist of two coils of wire, known as primary and secondary, wound around a magnetic core.

    • The primary coil is connected to an AC voltage source, which creates a magnetic field that induces a voltage in the secondary coil.

    • Transformers are used to step up or step down voltage le...

  • Answered by AI
  • Q2. What is motors, star delta converter starter
  • Ans. 

    A star delta converter starter is a type of motor starter used to reduce the starting current of a motor.

    • It is used for three-phase induction motors

    • It reduces the starting current by first starting the motor in a star configuration and then switching to a delta configuration

    • It is commonly used in applications where the starting current of the motor is high, such as in large pumps or compressors

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Adani Electricity Field Engineer interview:
  • I learned a lot from the intervi
Interview preparation tips for other job seekers - You are doing a good job but keep it up and take care of yourself and your family while working.

Field Engineer Interview Questions Asked at Other Companies

asked in Jio
Q1. What is insulator and conductors and semiconductors
Q2. What should be the tan Delta value of electrical equipment (for e ... read more
Q3. What is the ground clearance of 400KV transmission line.
Q4. Why transformer are rated in KVA.
asked in Jio
Q5. What is telecommunication

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Boiler operation
  • Q2. MS safety valve working
  • Ans. 

    MS safety valve is a device used to prevent overpressure in a system.

    • MS safety valve is typically installed in pipelines, vessels, or equipment to protect against excessive pressure.

    • When the pressure exceeds the set limit, the valve opens to release the excess pressure and prevent damage to the system.

    • The valve is designed to automatically close once the pressure returns to a safe level.

    • MS safety valves are commonly us...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Operation department is good
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Information of transformer , switchgear, electrical safety rules , Indian constitution rules of electricity.

Round 3 - Technical 

(2 Questions)

  • Q1. Types of switchgear and basic knowledge of sweet operation.
  • Ans. 

    Switchgear types include air-insulated, gas-insulated, and hybrid switchgear. Basic operation involves controlling electrical power flow.

    • Air-insulated switchgear uses air as the insulation medium

    • Gas-insulated switchgear uses sulfur hexafluoride (SF6) gas as the insulation medium

    • Hybrid switchgear combines air-insulated and gas-insulated switchgear

    • Switchgear operates by controlling the flow of electrical power

    • Switchgear ...

  • Answered by AI
  • Q2. Different types of transformer and there rating in kv Difference between lv and hv side.
  • Ans. 

    Different types of transformers and their ratings in kV. Explanation of LV and HV sides.

    • Transformers: Power, Distribution, Auto, Isolation, Instrument, etc.

    • Ratings: 1 kV, 11 kV, 33 kV, 66 kV, 132 kV, 220 kV, 400 kV, etc.

    • LV side: Low Voltage side of transformer, typically below 1 kV.

    • HV side: High Voltage side of transformer, typically above 1 kV.

    • LV side is used for distribution while HV side is used for transmission.

    • LV ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - While going to interview be confident.....
Don't be nervous in interview time.

Interview Questionnaire 

1 Question

  • Q1. VRV system, mep related, fire fighting,

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About instruments working
  • Q2. Motor and and senosr

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good experience, keep update your self.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About salary and about experience,etc
  • Q2. About salary accommodation transportation
Round 3 - Aptitude Test 

About experience about cell and SOP,MSDS, etc.

Round 4 - Aptitude Test 

About experience about and how to improve quality, efficiency,

Interview Preparation Tips

Interview preparation tips for other job seekers - I have 5.3 years experience in solar cell manufacturing i know how to improve efficiency, control rework, manpower handle, production plan, new manpower training, and i have complete QCC project certificate and reduce zero efficiency cell and get the gold in QQC project in vadodara
Interview experience
3
Average
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is TPS ?
  • Ans. 

    TPS stands for Transactions Per Second, a metric used to measure the number of transactions processed in a system within a second.

    • TPS is a key performance indicator for systems handling high volumes of transactions.

    • It is commonly used in the context of payment processing systems, online banking, and stock trading platforms.

    • Higher TPS indicates better system performance and scalability.

    • For example, a payment gateway may...

  • Answered by AI
  • Q2. What is 5'S ?
  • Ans. 

    5S is a methodology used for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.

    • Sort: Separate needed tools, parts, and instructions from unneeded items.

    • Set in order: Arrange items so they are easy to use and label them to eliminate searching.

    • Shine: Clean the work area and equipment regularly.

    • Standardize: Establish ...

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. What is your speaking salery ?
  • Q2. How much getting to privies company ?
  • Q3. What is your notice time ?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Working Experience in electrical project
  • Ans. 

    I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.

    • Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.

    • Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.

    • Collaborated wi...

  • Answered by AI
  • Q2. Working process of project
  • Ans. 

    The working process of a project involves planning, execution, monitoring, and completion.

    • Planning phase includes defining project goals, scope, and deliverables.

    • Execution phase involves assigning tasks, managing resources, and implementing the project plan.

    • Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.

    • Completion phase involves finalizing deliverables, conducting proj

  • Answered by AI
  • Q3. From survey execution up to billing and closer
  • Ans. 

    The question is asking about the process from survey execution to billing and closure.

    • Survey execution involves designing and distributing surveys to collect data.

    • Data collected from surveys is then analyzed and processed.

    • Based on the analysis, billing is done for the services provided.

    • Finally, the project is closed, and any remaining tasks or documentation are completed.

  • Answered by AI

Interview Questionnaire 

2 Questions

  • Q1. They will be asking from your past experience and previous project.Situation based question is given preference .
  • Q2. Be yourself, mainly confidence they want to see in ur expression and be truthful.

Adani Electricity Interview FAQs

How many rounds are there in Adani Electricity Field Engineer interview?
Adani Electricity interview process usually has 2-3 rounds. The most common rounds in the Adani Electricity interview process are Resume Shortlist, Aptitude Test and Technical.
What are the top questions asked in Adani Electricity Field Engineer interview?

Some of the top questions asked at the Adani Electricity Field Engineer interview -

  1. What is transformer,transformer part and functions,laws of kcl kvl and o...read more
  2. What is Transformef, what is CT, PT, what is surge arrestor, e...read more
  3. What is motors, star delta converter star...read more

Tell us how to improve this page.

Adani Electricity Field Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 226 Interviews
ReNew Interview Questions
4.2
 • 88 Interviews
Vestas Interview Questions
4.2
 • 86 Interviews
Jakson Group Interview Questions
4.2
 • 78 Interviews
Siemens Energy Interview Questions
4.1
 • 75 Interviews
Waaree Energies Interview Questions
3.9
 • 59 Interviews
Greenko Group Interview Questions
3.8
 • 48 Interviews
View all
Adani Electricity Field Engineer Salary
based on 30 salaries
₹2.6 L/yr - ₹4 L/yr
15% less than the average Field Engineer Salary in India
View more details

Adani Electricity Field Engineer Reviews and Ratings

based on 7 reviews

4.1/5

Rating in categories

4.2

Skill development

4.1

Work-life balance

3.6

Salary

3.5

Job security

4.0

Company culture

2.7

Promotions

3.8

Work satisfaction

Explore 7 Reviews and Ratings
Senior Executive
89 salaries
unlock blur

₹5 L/yr - ₹8.5 L/yr

Senior Manager
82 salaries
unlock blur

₹12 L/yr - ₹30.1 L/yr

Deputy General Manager
62 salaries
unlock blur

₹20 L/yr - ₹32 L/yr

Junior Engineer
44 salaries
unlock blur

₹2.2 L/yr - ₹6.2 L/yr

Assistant Manager
40 salaries
unlock blur

₹5 L/yr - ₹14.5 L/yr

Explore more salaries
Compare Adani Electricity with

Adani Power

3.9
Compare

ReNew

4.2
Compare

Adani Green Energy

4.1
Compare

Vestas

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview