i
AceMicromatic Group
Filter interviews by
Clear (1)
I applied via Campus Placement and was interviewed before Jan 2024. There were 2 interview rounds.
Passion for understanding how things work and desire to solve complex problems drove me to choose mechanical engineering.
Fascination with machines and technology
Enjoyment of problem-solving and hands-on work
Interest in designing and improving mechanical systems
Inspiration from family members or mentors in the field
I learned practical skills and problem-solving techniques during my diploma.
Developed hands-on experience in troubleshooting and repairing various equipment
Enhanced my knowledge of technical concepts and principles
Improved my communication and teamwork skills through group projects
Learned time management and prioritization to meet deadlines
I applied via Referral and was interviewed before Sep 2020. There was 1 interview round.
CNC stands for Computer Numerical Control, which is a manufacturing process that uses computerized systems to control machine tools.
CNC machines are used in various industries, including automotive, aerospace, and healthcare.
They can perform complex tasks with high precision and accuracy.
CNC machines can be programmed to produce identical parts repeatedly.
They are operated using specialized software and require skilled...
A computer-controlled machine tool used for precision machining.
CNC machines use computer programs to control the movement of the machine.
They are used in manufacturing for precision cutting, drilling, and shaping of materials.
CNC machines can be used for a variety of materials including metal, wood, and plastic.
Examples of CNC machines include lathes, mills, routers, and plasma cutters.
Vmc machine stands for Vertical Machining Center. It is a type of CNC machine used for precision cutting and drilling.
Vmc machine is a type of CNC machine
It is used for precision cutting and drilling
It operates on a vertical axis
It can perform multiple operations in a single setup
Examples of VMC machines include Haas VF-2, Mazak VCN-510C, etc.
I applied via Recruitment Consultant and was interviewed in Oct 2018. There were 3 interview rounds.
Backlash is the play or movement between mechanical components due to gaps or clearances.
Backlash refers to the amount of movement or play that occurs between two mechanical components.
It is caused by gaps or clearances between the components, which can result in imprecise or inaccurate movement.
Backlash is commonly seen in gears, where the teeth have small gaps to allow for smooth engagement.
For example, when a gear i...
A repeatability program ensures consistent and reliable performance of a service engineer's tasks.
Develop standardized procedures and protocols for service tasks
Implement quality control measures to ensure consistency
Regularly train and update service engineers on best practices
Establish feedback loops to identify and address any deviations
Monitor and analyze performance metrics to measure repeatability
Continuously imp
Turret problem and assembly is a common issue in service engineering.
Turret problems can include misalignment, wear and tear, and malfunctioning components.
Assembly of the turret requires careful attention to detail and proper alignment of components.
Regular maintenance and inspection can prevent turret problems and ensure proper assembly.
Proper training and experience are necessary for effective turret problem diagnos...
The ball screw bearing replacement procedures involve several steps to ensure proper installation and functionality.
Start by removing the old ball screw bearing carefully to avoid any damage.
Clean the mounting surface and inspect for any signs of wear or damage.
Apply lubrication to the new ball screw bearing before installation.
Align the bearing properly and secure it in place using the appropriate tools.
Test the funct...
AceMicromatic Group interview questions for designations
Top trending discussions
posted on 14 Jun 2020
The market potential for machine tools is significant due to increasing industrialization and automation.
Growing demand for machine tools in various industries such as automotive, aerospace, and electronics
Rapid industrialization in emerging economies like China and India
Advancements in technology leading to the development of advanced machine tools
Increasing focus on automation and precision in manufacturing processes
...
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 2 interview rounds.
posted on 16 Jan 2025
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
The work process involves diagnosing, troubleshooting, repairing, and maintaining equipment or systems to ensure optimal performance.
Diagnosing issues by analyzing symptoms and using diagnostic tools
Troubleshooting problems to identify root causes
Repairing or replacing faulty components
Performing regular maintenance to prevent breakdowns
Testing equipment after repairs to ensure functionality
Target archives are specific goals or objectives that a service engineer aims to achieve.
Identifying key performance indicators (KPIs) to measure success
Setting realistic and achievable targets based on customer needs and company goals
Regularly reviewing and adjusting targets to ensure continuous improvement
The idea target archives and level up involve setting specific goals for improvement and growth.
Set clear and achievable targets for improvement
Regularly assess progress towards goals
Implement strategies to level up skills or knowledge
Seek feedback and adjust approach as needed
A management system is a set of policies, processes, and procedures used by an organization to ensure that it can fulfill the tasks required to achieve its objectives.
A management system helps to organize and streamline operations within an organization.
It includes elements such as planning, organizing, leading, and controlling.
Examples of management systems include ISO 9001 for quality management and ISO 14001 for env
posted on 29 Aug 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.
Low gas pressure can lead to various issues like inefficient operation or equipment failure. Corrective actions include checking for leaks, adjusting regulators, and ensuring proper ventilation.
Check for leaks in the gas system
Adjust regulators to increase gas pressure
Ensure proper ventilation for gas combustion
Inspect gas supply lines for blockages or restrictions
Verify that gas appliances are functioning properly
I have 5 years of experience in the field and my current total CTC is $60,000.
5 years of experience in service engineering
Current total CTC is $60,000
Experience includes troubleshooting, maintenance, and repair of equipment
Our head office is located in downtown New York City.
Head office is in downtown New York City
Easily accessible by public transportation
Close to major landmarks and attractions
based on 1 interview
Interview experience
based on 77 reviews
Rating in categories
Service Engineer
320
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Service Engineer
59
salaries
| ₹0 L/yr - ₹0 L/yr |
Marketing Engineer
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Service Engineer
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Jyoti CNC Automation
Bharat Fritz Werner
HMT Machine Tools
Lakshmi Machine Works