Upload Button Icon Add office photos

Filter interviews by

Absotherm Facility Management Shift Engineer Interview Questions and Answers

Updated 13 Sep 2021

Absotherm Facility Management Shift Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Where you work before and about my experience
  • Q2. How you handle your shift with your tech and regarding equipment PPM and etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and grooming compulsory nad wear a good dress not a colourfull.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Total Work experience Previous company Role and responsibility Current CTC
Round 3 - Technical 

(1 Question)

  • Q1. Technical skill DG sefty Transformer Sefty working principles All types breakers sefty SLD from HT line to LT line

Interview Preparation Tips

Interview preparation tips for other job seekers - You should be have good technical knowledge and skills
Be confidence
Do not nervous
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .

I applied via Naukri.com and was interviewed before May 2018. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Questions are related to your past working experience and the position that you applied for Microwave Transmission related questions: What is Microwave and types What is fadind and it's resolution steps D...
  • Q2. PDH-SDH related questions- Difference between PDH and sdh Frame structure of sdh High order and low order bytes and alarms related to bytes Alarms in sdh Ethernet over sdh What is GFP, ENCAPSULATION, VCAT,...
  • Q3. Generally your current work related questions Why you want to change your job What is your expectations from new job Where you seeing your self after 5 year's Current salary and expectations

Interview Preparation Tips

Round: HR Round
Experience: Related to offer they are giving and related cross questions

General Tips: I had been interviewed with Huawei in 2016 and total 2 rounds was there for me. Questions I already had shared, go through it.

I got my offer letter after 1 month after HR discussion but please follow up with HR team once you get call for your selection
Skills: Ethernet over SDH, SDH, Microwave, Technical Knowledge(ML, Microwave, Communication, Presentation Skills
Duration: 1-3 Months

I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About working at previous work done and electrical engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - NA

I applied via Walk-in and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. System related
  • Q2. Building compliance etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Residential site system and compliance related services
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. All technical equipment
  • Q2. All SOP And AMC
  • Q3. DG sets and oil type transformer and dry type transformer.
  • Q4. Firefiting systems and STP and WTP plat
Round 2 - Technical 

(2 Questions)

  • Q1. All technical equipment
  • Q2. WTP and STP and fire

Interview Preparation Tips

Interview preparation tips for other job seekers - Shift Engineer

I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How to work transformer.
  • Ans. 

    Transformers work by converting electrical energy from one circuit to another through electromagnetic induction.

    • Transformers have two coils of wire, a primary coil and a secondary coil.

    • The primary coil is connected to a power source and produces a magnetic field when current flows through it.

    • The magnetic field induces a voltage in the secondary coil, which is connected to the load.

    • The voltage in the secondary coil is p...

  • Answered by AI
  • Q2. How many causes do not start the alternator.
  • Ans. 

    There can be multiple causes for an alternator to not start.

    • Dead battery

    • Faulty alternator

    • Broken or loose belts

    • Faulty voltage regulator

    • Bad wiring or connections

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I really enjoying my interview time. I am not nervous in this time.

Skills evaluated in this interview

I applied via Recruitment Consultant and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Work experience in mechanical
  • Ans. 

    I have 10 years of work experience in mechanical engineering.

    • Designed and implemented mechanical systems for various projects

    • Performed analysis and simulations to optimize performance

    • Collaborated with cross-functional teams to ensure project success

    • Managed and supervised junior engineers

    • Implemented cost-saving measures in manufacturing processes

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Once refer your resume first

I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All Technical questions related to commercial site

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was related to technical issues majorly LT,HT,VCB,ACB ,relays,WTP, STP HVAC it was a phone call interview it held approx 45 mins I couldn't give some answers but after interview my interviewer briefed me about that.

Tell us how to improve this page.

Absotherm Facility Management Shift Engineer Salary
based on 6 salaries
₹2.2 L/yr - ₹3.8 L/yr
30% less than the average Shift Engineer Salary in India
View more details

Absotherm Facility Management Shift Engineer Reviews and Ratings

based on 5 reviews

3.8/5

Rating in categories

3.8

Skill development

2.9

Work-life balance

3.5

Salary

3.7

Job security

3.9

Company culture

3.7

Promotions

3.1

Work satisfaction

Explore 5 Reviews and Ratings
Shift Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Software Developer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrician
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Team Lead
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Plumber
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Absotherm Facility Management with

JLL

4.1
Compare

CBRE

4.2
Compare

Knight Frank

4.0
Compare

Colliers India

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview