Filter interviews by
In such situations, it is important to build relationships and collaborate with others who have the authority to ensure successful product delivery.
Build strong relationships with colleagues who have the authority to help facilitate the delivery process.
Communicate effectively with the relevant stakeholders to ensure everyone is on the same page.
Negotiate and find compromises to overcome any obstacles that may arise.
Se...
Top trending discussions
posted on 5 Jun 2023
I applied via Company Website and was interviewed before Jun 2022. There was 1 interview round.
posted on 9 Feb 2025
Market Structure,Sales planning
posted on 15 Apr 2022
I have successfully completed 10 projects, including voltage optimization, energy efficiency, and renewable energy integration.
Completed 10 projects in total
Projects include voltage optimization, energy efficiency, and renewable energy integration
Experience in managing projects with varying voltage requirements
I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed before Oct 2019. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
posted on 4 Apr 2022
I applied via LinkedIn and was interviewed in Oct 2021. There were 2 interview rounds.
What is your greatest Strength
Population projection methods include cohort-component, trend extrapolation, and expert opinion. For water supply projects, population can be projected based on historical data, demographic trends, and development plans.
Population projection methods: cohort-component, trend extrapolation, expert opinion
For water supply projects, project population based on historical data, demographic trends, development plans
Consider ...
Water distribution systems are designed using hydraulic principles to ensure efficient water supply to consumers. Elevated service reservoirs are designed to store and distribute water at higher elevations.
Water distribution systems are designed based on factors such as population served, water demand, topography, and available water sources.
Hydraulic calculations are used to determine pipe sizes, flow rates, and press...
based on 1 interview
Interview experience
Software Developer
231
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
221
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
161
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
116
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure