i
ABB
Filter interviews by
I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.
Control measures are actions taken to eliminate or reduce hazards and risks in order to ensure safety.
Engineering controls: Physical modifications to eliminate or minimize hazards (e.g. machine guards, ventilation systems)
Administrative controls: Policies, procedures, and training to reduce exposure to hazards (e.g. safety training, work permits)
Personal protective equipment (PPE): Equipment worn to protect against spe...
Checklist for lifting plan includes assessing load weight, selecting appropriate lifting equipment, ensuring proper rigging, and conducting pre-lift inspections.
Assess the weight of the load to determine the appropriate lifting equipment and techniques.
Select the appropriate lifting equipment based on the load weight and characteristics.
Ensure proper rigging by inspecting and using appropriate slings, hooks, and attach...
A load chart is a graphical representation of the safe working load limits of a crane or lifting equipment.
A load chart provides information about the maximum weight that can be safely lifted at different boom lengths and angles.
It helps operators determine the safe working limits of the equipment.
Load charts are specific to each type and model of crane or lifting equipment.
They take into account factors such as boom l...
Hierarchy of Control measures refers to a systematic approach to eliminate or minimize hazards in the workplace.
Elimination: Remove the hazard completely, e.g. replacing a hazardous substance with a safer alternative.
Substitution: Replace the hazard with a less hazardous alternative, e.g. using non-toxic chemicals instead of toxic ones.
Engineering controls: Implement physical changes to the workplace to reduce exposure...
Emergency exit is a designated route for evacuating a building during an emergency. Emergency assembly point is a predetermined location where individuals gather after evacuating.
Emergency exit is a route that allows people to quickly and safely leave a building during emergencies such as fires, earthquakes, or other hazards.
Emergency exits are typically marked with signs and are strategically placed throughout a build...
I applied via Recruitment Consultant and was interviewed in Dec 2021. There was 1 interview round.
The company plant is named XYZ Plant.
The XYZ Plant is a manufacturing facility located in [location].
It has been operational for [number of years].
The plant specializes in the production of [products].
Safety protocols and procedures are strictly followed to ensure the well-being of employees.
Regular safety inspections and audits are conducted to identify and mitigate potential hazards.
Training programs are implemented ...
based on 9 reviews
Rating in categories
Project Engineer
576
salaries
| ₹5.4 L/yr - ₹18 L/yr |
R&D Engineer
330
salaries
| ₹6.5 L/yr - ₹23 L/yr |
Financial Analyst
264
salaries
| ₹2 L/yr - ₹10 L/yr |
Design Engineer
227
salaries
| ₹0.9 L/yr - ₹9.5 L/yr |
Associate Project Engineer
213
salaries
| ₹5 L/yr - ₹12 L/yr |
Siemens
Schneider Electric
Emerson Electric Co.
Honeywell International India