Premium Employer

i

This company page is being actively managed by ABB Team. If you also belong to the team, you can get access from here

ABB Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

ABB Associate Project Manager Interview Questions, Process, and Tips

Updated 17 Jun 2024

ABB Associate Project Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
No response

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(8 Questions)

  • Q1. Introduce your self ?
  • Q2. Why you wants to switch job ?
  • Q3. Explain about parts of switchgears ?
  • Ans. 

    Switchgears consist of various components like circuit breakers, fuses, relays, etc. used to control, protect, and isolate electrical equipment.

    • Circuit breakers: Used to interrupt the flow of electricity in case of a fault.

    • Fuses: Protect electrical circuits by breaking the circuit when there is an overload.

    • Relays: Control the flow of electricity based on signals from sensors or switches.

    • Disconnect switches: Used to iso...

  • Answered by AI
  • Q4. Why both contacts are not moving in switch gears ?
  • Ans. 

    Contacts may not be moving in switch gears due to issues such as faulty wiring, mechanical obstructions, or lack of power.

    • Check for faulty wiring connections

    • Inspect for mechanical obstructions preventing movement

    • Ensure there is sufficient power supply to the switch gears

  • Answered by AI
  • Q5. Do you know about purchase order ?
  • Ans. 

    A purchase order is a document issued by a buyer to a seller, indicating types, quantities, and agreed prices for products or services.

    • Purchase orders are used in business transactions to ensure both parties are in agreement on the terms of the sale.

    • They typically include details such as item descriptions, quantities, prices, payment terms, and delivery dates.

    • Purchase orders help track and manage purchases, as well as ...

  • Answered by AI
  • Q6. What kind of project you have done so far ?
  • Q7. If you given tight budget how you will ensure same quality ?
  • Ans. 

    I would prioritize key deliverables, negotiate with vendors for discounts, and streamline processes to maintain quality within the tight budget.

    • Prioritize key deliverables to ensure essential aspects are not compromised

    • Negotiate with vendors for discounts or explore alternative cost-effective options

    • Streamline processes to eliminate any unnecessary expenses and optimize resources

  • Answered by AI
  • Q8. Do you know about enclosure ?
  • Ans. 

    Enclosure refers to a structure that surrounds or contains something, providing protection or confinement.

    • Enclosures can be used in various industries such as construction, electronics, and manufacturing.

    • Examples of enclosures include computer cases, electrical boxes, and animal habitats.

    • Enclosures are designed to protect the contents from external elements and provide safety and security.

    • Enclosures can be made of diff...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Mostly question comes from resume and your experience. Do prepare resume and project in details.

Interview questions from similar companies

I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Drum level like single element and three elements

Interview Preparation Tips

Interview preparation tips for other job seekers - Company is ok anyone can join this company, all the thing that are systematicg

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All were professional questions wrt to their department

Interview Preparation Tips

Interview preparation tips for other job seekers - It was an virtual interview, with panel board members, they test our professional standard and expect honest answers.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 
Round 3 - HR 

(6 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why should we hire you?
  • Q4. Why are you looking for a change?
  • Q5. What are your strengths and weaknesses?
  • Q6. Tell me about yourself.
Round 4 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be preparing properly, CV should be updated
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Quantity aptitude, numerical methods

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for Group discussion and personal interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Sep 2022.

Round 1 - Technical 

(2 Questions)

  • Q1. About power plant
  • Q2. Sop Smp spare management
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Basic questions of instruments. Basic understanding of boiler loops and control.
  • Q2. May check your understanding of sequence of drawing for design engineering.
  • Q3. Hook up drawing understanding they checked specially drun level transmitter hookup drawing..
  • Q4. Understanding of basic engineering document i.e instrument list, io list, hookup, cable/jb schedule, cable interconnection diagram, loops and logic diagram

Interview Preparation Tips

Topics to prepare for Isgec Heavy Engineering Assistant Manager interview:
  • Boiler control and loop
  • Instrumentation Engineering
Interview preparation tips for other job seekers - Just show your confidence politely and show your problem solving skills to get out any challllenging situation.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Boiler basic , commissioning, trouble shooting, depth knowledge
Round 3 - HR 

(5 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why should we hire you?
  • Q3. Why are you looking for a change?
  • Q4. Tell me about yourself.
  • Q5. What are your strengths and weaknesses?

Interview Preparation Tips

Interview preparation tips for other job seekers - Offer for appointment. Once techno commercial clear then direct joining
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Maths reasoning quantitive aptitude & general knowledge questions

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Ask about of Last company Experience

ABB Interview FAQs

How many rounds are there in ABB Associate Project Manager interview?
ABB interview process usually has 1 rounds. The most common rounds in the ABB interview process are Technical.
What are the top questions asked in ABB Associate Project Manager interview?

Some of the top questions asked at the ABB Associate Project Manager interview -

  1. If you given tight budget how you will ensure same qualit...read more
  2. Why both contacts are not moving in switch gear...read more
  3. Do you know about purchase orde...read more

Tell us how to improve this page.

ABB Associate Project Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Join ABB Helping industries outrun with our leading technologies

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 260 Interviews
Atlas Copco Interview Questions
4.2
 • 80 Interviews
Timken Interview Questions
4.0
 • 48 Interviews
View all
ABB Associate Project Manager Salary
based on 34 salaries
₹7.5 L/yr - ₹21.9 L/yr
At par with the average Associate Project Manager Salary in India
View more details

ABB Associate Project Manager Reviews and Ratings

based on 5 reviews

4.4/5

Rating in categories

4.3

Skill development

4.5

Work-life balance

3.4

Salary

4.8

Job security

4.5

Company culture

2.7

Promotions

3.9

Work satisfaction

Explore 5 Reviews and Ratings
Project Engineer
612 salaries
unlock blur

₹4.8 L/yr - ₹18.3 L/yr

R&D Engineer
334 salaries
unlock blur

₹6.5 L/yr - ₹22.2 L/yr

Financial Analyst
257 salaries
unlock blur

₹2 L/yr - ₹10.1 L/yr

Design Engineer
240 salaries
unlock blur

₹1.2 L/yr - ₹10 L/yr

Finance Specialist
198 salaries
unlock blur

₹2.8 L/yr - ₹7.5 L/yr

Explore more salaries
Compare ABB with

Thermax Limited

4.1
Compare

Isgec Heavy Engineering

3.8
Compare

Kirloskar Oil Engines

4.1
Compare

Kirloskar Brothers

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview