I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
Switchgears consist of various components like circuit breakers, fuses, relays, etc. used to control, protect, and isolate electrical equipment.
Circuit breakers: Used to interrupt the flow of electricity in case of a fault.
Fuses: Protect electrical circuits by breaking the circuit when there is an overload.
Relays: Control the flow of electricity based on signals from sensors or switches.
Disconnect switches: Used to iso...
Contacts may not be moving in switch gears due to issues such as faulty wiring, mechanical obstructions, or lack of power.
Check for faulty wiring connections
Inspect for mechanical obstructions preventing movement
Ensure there is sufficient power supply to the switch gears
A purchase order is a document issued by a buyer to a seller, indicating types, quantities, and agreed prices for products or services.
Purchase orders are used in business transactions to ensure both parties are in agreement on the terms of the sale.
They typically include details such as item descriptions, quantities, prices, payment terms, and delivery dates.
Purchase orders help track and manage purchases, as well as ...
I would prioritize key deliverables, negotiate with vendors for discounts, and streamline processes to maintain quality within the tight budget.
Prioritize key deliverables to ensure essential aspects are not compromised
Negotiate with vendors for discounts or explore alternative cost-effective options
Streamline processes to eliminate any unnecessary expenses and optimize resources
Enclosure refers to a structure that surrounds or contains something, providing protection or confinement.
Enclosures can be used in various industries such as construction, electronics, and manufacturing.
Examples of enclosures include computer cases, electrical boxes, and animal habitats.
Enclosures are designed to protect the contents from external elements and provide safety and security.
Enclosures can be made of diff...
Top trending discussions
posted on 8 Aug 2022
I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.
posted on 27 Feb 2022
I applied via Company Website and was interviewed before Feb 2021. There were 3 interview rounds.
About experience and scope of work current organization and civil engineering related questions.
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 11 May 2018
I was interviewed before Mar 2020.
posted on 27 Apr 2022
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Nov 2017. There were 8 interview rounds.
posted on 25 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Project Engineer
584
salaries
| ₹0 L/yr - ₹0 L/yr |
R&D Engineer
324
salaries
| ₹0 L/yr - ₹0 L/yr |
Financial Analyst
256
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
241
salaries
| ₹0 L/yr - ₹0 L/yr |
Finance Specialist
196
salaries
| ₹0 L/yr - ₹0 L/yr |
Siemens
Schneider Electric
Emerson Electric Co.
Honeywell International India