i
ABB
Filter interviews by
I applied via Newspaper Ad
Introduction and good futer
Bater life future goals good work safly diciplin
Top trending discussions
I applied via Approached by Company and was interviewed in Dec 2018. There were 5 interview rounds.
I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.
Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.
Six Sigma aims to achieve a level of quality where the probability of defects is extremely low.
It uses statistical analysis to identify and eliminate sources of variation in a process.
The methodology follows a structured approach called DMAIC (Define, Measure, Analyze, Improve, Control).
Six Sigma is widely used...
Fishbone diagram is a visual tool used to identify the possible causes of a problem or an effect.
Also known as Ishikawa diagram or cause-and-effect diagram
Consists of a central spine and branches that represent different categories of potential causes
Used in quality control, process improvement, and problem-solving
Example: A fishbone diagram can be used to identify the possible causes of defects in a manufacturing proc
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 4 interview rounds.
The power plant process involves converting fuel into electricity through various stages.
Fuel is burned to produce heat
Heat is used to create steam
Steam turns a turbine
Turbine generates electricity
Electricity is sent to the grid for distribution
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Oct 2022. There was 1 interview round.
Boiler is a device used to generate steam by heating water. Auxiliaries are equipment used to support the boiler.
Boiler is used in industries for various purposes such as power generation, heating, and processing.
Auxiliaries include feedwater pumps, blowdown tanks, deaerators, and economizers.
Feedwater pumps are used to supply water to the boiler, blowdown tanks are used to remove impurities from the boiler water, deae...
Hydrotest is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water or other liquid.
Hydrotest is done to ensure that the vessel or pipeline can withstand the required pressure without leaking or rupturing.
The vessel or pipeline is filled with water or other liquid and pressurized to a level higher than its maximum operating pressure.
The pressure is held for a specified...
I applied via Approached by Company and was interviewed in Mar 2023. There were 4 interview rounds.
Technical questions and apptitude
I am not familiar with the terms kra/kpa, Monthly buying, and DWM.
I apologize, but I am not familiar with those terms.
Could you please explain what they mean?
I am willing to learn and adapt to new concepts and terminologies.
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Project Engineer
613
salaries
| ₹4.8 L/yr - ₹18.3 L/yr |
R&D Engineer
330
salaries
| ₹6 L/yr - ₹22.2 L/yr |
Financial Analyst
259
salaries
| ₹2 L/yr - ₹8.6 L/yr |
Design Engineer
240
salaries
| ₹1.2 L/yr - ₹10 L/yr |
Finance Specialist
200
salaries
| ₹2.8 L/yr - ₹7.5 L/yr |
Thermax Limited
Isgec Heavy Engineering
Kirloskar Oil Engines
Kirloskar Brothers