I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
The overall responsibility for highway work includes overseeing project progress, ensuring quality standards are met, and managing contractor billing.
Oversee project progress to ensure timelines are met
Ensure quality standards are maintained throughout the construction process
Manage contractor billing and ensure accurate invoicing
Coordinate with various stakeholders including engineers, contractors, and government agen...
I applied via Campus Placement and was interviewed before Jan 2020. There were 5 interview rounds.
posted on 29 Jul 2022
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 6 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
posted on 21 Jan 2025
I appeared for an interview before Jan 2024.
Steps involved in preparing a project budget
Identify all project expenses including labor, materials, equipment, etc.
Estimate the cost of each expense item based on historical data or quotes from vendors
Allocate funds for unexpected costs or contingencies
Determine the timeline for the project and spread out costs accordingly
Review and finalize the budget with key stakeholders
Factors considered in project costing include materials, labor, overhead, equipment, and indirect costs.
Materials: Cost of raw materials needed for the project.
Labor: Cost of labor required to complete the project.
Overhead: Indirect costs such as utilities, rent, and administrative expenses.
Equipment: Cost of equipment needed for the project.
Indirect costs: Miscellaneous costs like permits, insurance, and taxes.
Example...
I monitor the budget by regularly reviewing expenses, comparing them to projections, and making adjustments as needed.
Regularly review expenses to ensure they are in line with the budget
Compare actual expenses to budget projections to identify any discrepancies
Make adjustments to the budget as needed based on the review and analysis
Track spending patterns and identify areas where cost savings can be made
Indirect costs are expenses that are not directly tied to a specific project or department, but still contribute to overall operational costs.
Indirect costs are overhead expenses that cannot be easily traced to a specific cost object.
Examples include rent, utilities, administrative salaries, and office supplies.
These costs are necessary for the business to function, but are not directly attributable to a specific produ...
Cash flow can be effectively monitored by tracking income and expenses, creating cash flow statements, setting up cash flow projections, and using accounting software.
Track income and expenses regularly to understand the flow of cash in and out of the business.
Create cash flow statements to analyze the sources and uses of cash over a specific period.
Set up cash flow projections to forecast future cash flow based on exp...
posted on 17 Feb 2025
I appeared for an interview before Feb 2024.
posted on 18 May 2024
I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.
1- Material Calculation
2- Bar bending Schedule
3- Planning and Chart
4- Making Praposal
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
327
salaries
| ₹3.6 L/yr - ₹11 L/yr |
Manager
120
salaries
| ₹6.5 L/yr - ₹19 L/yr |
Field Engineer
119
salaries
| ₹1.6 L/yr - ₹4.2 L/yr |
Site Engineer
95
salaries
| ₹2.4 L/yr - ₹6.6 L/yr |
Civil Engineer
83
salaries
| ₹2.7 L/yr - ₹7.8 L/yr |
L&T Construction
Shapoorji Pallonji Group
Kalpataru Projects International
Afcons Infrastructure