Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Aarti Steels Team. If you also belong to the team, you can get access from here

Aarti Steels Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Aarti Steels PPC Engineer Interview Questions and Answers

Updated 19 Aug 2024

Aarti Steels PPC Engineer Interview Experiences

1 interview found

PPC Engineer Interview Questions & Answers

user image Anonymous

posted on 9 Aug 2022

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What was your last salary structure
  • Ans. 

    I am currently earning a competitive salary based on my experience and skills.

    • My last salary structure was based on my qualifications, experience, and job responsibilities.

    • I received regular performance reviews and salary adjustments based on my contributions.

    • I also received bonuses and benefits as part of my overall compensation package.

  • Answered by AI
  • Q2. Why you want to join Aarti steels
  • Ans. 

    I want to join Aarti Steels because of their reputation for innovation and growth in the industry.

    • Aarti Steels has a strong reputation for innovation and growth in the industry

    • I am impressed by the company's commitment to quality and customer satisfaction

    • I believe that my skills and experience align well with the opportunities at Aarti Steels

  • Answered by AI
  • Q3. What you expect from Aarti steels
  • Ans. 

    I expect Aarti Steels to provide a challenging and rewarding work environment with opportunities for growth and development.

    • Opportunities for career advancement

    • Support for professional development

    • Competitive compensation and benefits

    • Positive work culture

    • Commitment to quality and safety

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Introductory part
  • Q2. Past employments experience and responsibilities
  • Ans. 

    I have 5 years of experience working as a PPC Engineer at XYZ Company, where I managed PPC campaigns, conducted keyword research, and optimized ad performance.

    • Managed PPC campaigns for various clients

    • Conducted keyword research to identify high-performing keywords

    • Optimized ad performance through A/B testing and data analysis

  • Answered by AI
Round 4 - HR 

(2 Questions)

  • Q1. Last employer work culture
  • Ans. 

    Collaborative and supportive environment with emphasis on work-life balance

    • Encouraged open communication and teamwork

    • Flexible work hours and remote work options

    • Regular team building activities and social events

    • Emphasis on employee well-being and mental health support

  • Answered by AI
  • Q2. Salary scheme and benefits

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be confident and well prepared for ur interview and do R&D of company before joining

Interview questions from similar companies

I applied via Referral and was interviewed before Jan 2019. There were 6 interview rounds.

Interview Questionnaire 

7 Questions

  • Q1. Say something about urself
  • Q2. Work experience
  • Q3. Technical with hr and the concerned department head asked various question
  • Q4. Hr round
  • Q5. Salary negotiations
  • Q6. 3.6 salary I was offered in the year 2010
  • Q7. Excepted

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared technically

I applied via Approached by Company

Interview Questionnaire 

4 Questions

  • Q1. General introduced about yourself
  • Q2. What is hobbies and skills
  • Q3. What is role of planner in industry?
  • Ans. 

    Planner plays a crucial role in industry by creating schedules and coordinating resources to ensure efficient production.

    • Planner creates production schedules and ensures timely delivery of products.

    • They coordinate with different departments to ensure availability of resources like raw materials, equipment, and manpower.

    • Planner also monitors production progress and makes adjustments to schedules as needed.

    • They analyze d...

  • Answered by AI
  • Q4. T codes are in SAP PP module
  • Ans. 

    Yes, T codes are used in SAP PP module.

    • T codes are transaction codes used to access various functions in SAP PP module.

    • They are used to perform tasks such as creating production orders, scheduling production, and monitoring production progress.

    • Examples of T codes in SAP PP module include CO01 for creating production orders, MD04 for monitoring production progress, and MF50 for scheduling production.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It easy to crack interview, just read the basic of required for that particular job
Which role actually they need

Skills evaluated in this interview

I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. All about area related work
Round 3 - HR 

(1 Question)

  • Q1. Package finalizing and house allotment process

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to go for freshers, its most trusted brand in steel making, but work hours may vary depending on your area of working

I was interviewed before Jan 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 3 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 4 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 5 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Any questions hr team
  • Ans. My contact no not any time network area ple msg me
  • Answered Anonymously
Round 6 - Case Study 

Diploma

Round 7 - HR 

(1 Question)

  • Q1. What are your salary expectations?
Round 8 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 9 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 10 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 11 - Resume Shortlist 
Pro Tip by AmbitionBox:
Avoid using too much corporate jargon in your CV. Sometimes keeping things simple will get your job done.
View all tips

Interview Preparation Tips

Interview preparation tips for other job seekers - I am civil engginer my experience hydro, irrigation tunnel, rvnl tunnel

I applied via Recruitment Consulltant and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Physical and chemical quality of raw materials and sinter product.
  • Ans. 

    Physical and chemical quality of raw materials and sinter product is crucial for ensuring product quality and performance.

    • Raw materials should meet specified physical and chemical requirements to ensure desired sinter product properties.

    • Regular testing and analysis of raw materials and sinter product is necessary to maintain quality standards.

    • Factors such as particle size, composition, moisture content, and impurities ...

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. Opeartion related

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview war a technical but was majority a stress test. The two round of interviews about 35 minute the interviewer wanted to test both my knowledge.most the question ask me for my technical knowledge for my experience like my work responsibility, manpower handling raw material handling, chemical and physical analysis of final products and their raw materials uses
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. How many years experience in field survey?
  • Ans. 

    I have 8 years of experience in field surveying.

    • I have 8 years of experience in conducting field surveys for various projects.

    • I am proficient in using surveying equipment such as total stations and GPS devices.

    • I have experience in analyzing survey data and creating detailed reports.

    • I have worked on projects ranging from land development to infrastructure construction.

  • Answered by AI
  • Q2. Do you have any Knowledge in DGPS and Total Station
  • Ans. 

    Yes, I have knowledge in DGPS and Total Station.

    • I have experience using DGPS for precise positioning in surveying and mapping.

    • I am familiar with Total Station equipment for measuring angles and distances in surveying.

    • I have used both DGPS and Total Station in various engineering projects.

    • I am proficient in data collection and analysis using DGPS and Total Station technology.

  • Answered by AI
  • Q3. What is your current CTC per month and year
  • Ans. 

    My current CTC per month is $10,000 and per year is $120,000.

    • Current CTC per month: $10,000

    • Current CTC per year: $120,000

  • Answered by AI
Round 2 - Technical 

(8 Questions)

  • Q1. What is the Definition of Topography Survey ? And Explain it!
  • Ans. 

    Topography survey is a detailed mapping of the natural and man-made features of a piece of land.

    • Topography survey involves measuring and mapping the elevation, contours, and features of a land area.

    • It helps in understanding the terrain, drainage patterns, and existing structures on the land.

    • Topography surveys are essential for construction projects, land development, and environmental assessments.

    • Surveyors use speciali...

  • Answered by AI
  • Q2. What is RL?
  • Ans. 

    RL stands for Reinforcement Learning, a type of machine learning where an agent learns to make decisions by interacting with an environment.

    • RL involves an agent learning to take actions in an environment to maximize some notion of cumulative reward.

    • It is based on the idea of trial and error learning, where the agent learns from the consequences of its actions.

    • Examples of RL algorithms include Q-Learning, Deep Q Network

  • Answered by AI
  • Q3. How to prepare google KMZ file? And Explain it!
  • Ans. 

    A KMZ file is a compressed version of a KML file used for displaying geographic data in Google Earth.

    • Create or download a KML file with geographic data

    • Compress the KML file using a tool like 7-Zip or WinZip

    • Change the file extension from .zip to .kmz

    • Open the KMZ file in Google Earth to view the geographic data

  • Answered by AI
  • Q4. What is the Traverse?
  • Ans. 

    The Traverse is a method used in surveying and navigation to move through an area by taking a series of connected measurements and directions.

    • Traverse involves measuring distances and angles between points to create a connected path.

    • It is commonly used in land surveying, construction, and navigation.

    • Traverse can be closed or open depending on whether it returns to the starting point.

    • Example: A land surveyor uses a trav

  • Answered by AI
  • Q5. How to distribute an error in any Point?
  • Ans. 

    Error distribution in a point can be achieved by considering the uncertainty in measurements and applying statistical methods.

    • Consider the uncertainty in measurements to determine the range of possible values for the point.

    • Apply statistical methods such as standard deviation to distribute the error around the point.

    • Use error propagation techniques to calculate the overall error in the point based on the errors in indiv

  • Answered by AI
  • Q6. How to work the Total Station? And how to layout any area by Total Station it explain!
  • Ans. 

    Total Station is a surveying instrument used for measuring angles and distances to accurately layout areas.

    • Set up the Total Station at a known point with a clear line of sight to the area to be surveyed.

    • Calibrate the instrument by leveling it and inputting the necessary parameters such as height and angle.

    • Measure distances and angles to various points in the area to create a detailed map or layout.

    • Use the data collecte...

  • Answered by AI
  • Q7. How many years experience in Total Station, Auto level,Digital level, and Theodolite, and Digital Theodolite?
  • Ans. 

    I have 8 years of experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.

    • 8 years experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.

    • Proficient in using all mentioned surveying instruments.

    • Experience in conducting precise measurements for various projects.

    • Skilled in data collection and analysis using these instruments.

  • Answered by AI
  • Q8. What is difference in Dumpy level, auto level, and digital level?
  • Ans. 

    Dumpy level, auto level, and digital level are all types of surveying instruments used for measuring horizontal and vertical levels.

    • Dumpy level is a basic surveying instrument with a telescope and bubble level for measuring horizontal and vertical angles.

    • Auto level is a more advanced version of a dumpy level that automatically adjusts the line of sight to be horizontal.

    • Digital level is a modern surveying instrument tha...

  • Answered by AI

I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Company related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - I do my level best & hard work

I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. About your professional & family details
  • Q2. Is there any previous experience about coke oven plants & steel industry
  • Q3. If you have the previous experience about those plant then they will ask u question regarding those plant systems.
  • Q4. Tell me two most Appreciateable job you have done and two mistakes with the findings from that mistake.
  • Q5. About PCS7 software knowledge & siemens plc automation related details
  • Q6. Field instruments related questions, like control valves, transmitters, analyzers etc.
  • Q7. How to calibrate a control valve
  • Ans. 

    Control valve calibration involves adjusting the valve to ensure it operates within specified parameters.

    • Determine the valve's operating range and desired set points

    • Use a calibration bench or in-line calibration equipment to adjust the valve's position and response time

    • Verify the valve's performance using a flow meter or pressure gauge

    • Document the calibration process and results for future reference

  • Answered by AI
  • Q8. Pcs7 server client systems

Interview Preparation Tips

Interview preparation tips for other job seekers - I given interview for the post of Automation & Instrument engineer. So the most interviews are related to technical instruments and PLC automation.
HR round is very general discussion, No Group discussion held.
Overall you have a good interviewing experience if you have a sound technical skills in your field.
Interview has two part
1. Telephonic interview with general details & basic technical question related to that post.
2. On site interview with details discussion & technical & HR discussion.

Aarti Steels Interview FAQs

How many rounds are there in Aarti Steels PPC Engineer interview?
Aarti Steels interview process usually has 4 rounds. The most common rounds in the Aarti Steels interview process are HR, Resume Shortlist and One-on-one Round.
How to prepare for Aarti Steels PPC Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Aarti Steels. The most common topics and skills that interviewers at Aarti Steels expect are Casting, ERP, Excel and Production Planning Control.
What are the top questions asked in Aarti Steels PPC Engineer interview?

Some of the top questions asked at the Aarti Steels PPC Engineer interview -

  1. What you expect from Aarti ste...read more
  2. Introductory p...read more

Tell us how to improve this page.

Aarti Steels PPC Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 821 Interviews
JSW Steel Interview Questions
3.9
 • 592 Interviews
Jindal Stainless Interview Questions
4.2
 • 206 Interviews
Jindal Saw Interview Questions
4.0
 • 99 Interviews
Vedanta Limited Interview Questions
3.8
 • 46 Interviews
Electrotherm Interview Questions
4.2
 • 33 Interviews
View all
Aarti Steels PPC Engineer Salary
based on 5 salaries
₹3.2 L/yr - ₹4 L/yr
At par with the average PPC Engineer Salary in India
View more details

Aarti Steels PPC Engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

3.4

Skill development

4.0

Work-life balance

3.0

Salary

4.5

Job security

3.8

Company culture

3.0

Promotions

3.8

Work satisfaction

Explore 2 Reviews and Ratings
Senior Engineer
71 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
63 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
48 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
40 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
40 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Aarti Steels with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

ArcelorMittal Nippon Steel

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview